< Back to Article
Taking the Lag out of Jet Lag through Model-Based Schedule Design
Figure 6
The empirical cumulative probability distribution of performance.
The distribution is shown for baseline (dot-dashed), and across the entire protocol with (dashed) and without (solid) a countermeasure.
doi: https://doi.org/10.1371/journal.pcbi.1000418.g006