Taking the Lag out of Jet Lag through Model-Based Schedule Design
Figure 5
Simulated changes in daily performance with and without countermeasure after a jet-lag schedule.
The schedule is the same as in Figure 4. Panels A1 and B1 are the simulations without a countermeasure; Panels A2 and B2 are the simulations with a countermeasure. Panels A1–A2: The predicted performance upper quartile (green), median (red), and lower (blue) quartile for each wake episode across all days of the schedule. Panels B1–B2: The scaled upper and lower quartiles across wake episodes of the schedules. For panels B1–B2, the combined upper (green) and lower (blue) quartile of simulated performance during baseline (wake day episode 1) is scaled to 1.