Taking the Lag out of Jet Lag through Model-Based Schedule Design
Figure 2
Examples of ‘Schedule Building Blocks’.
Note that the constraint in the “Constrained Countermeasure” is assumed to be a timing-related constraint and is therefore instantiated in the countermeasure start time and countermeasure length parameters.