Skip to main content
Advertisement

< Back to Article

Taking the Lag out of Jet Lag through Model-Based Schedule Design

Figure 2

Examples of ‘Schedule Building Blocks’.

Note that the constraint in the “Constrained Countermeasure” is assumed to be a timing-related constraint and is therefore instantiated in the countermeasure start time and countermeasure length parameters.

Figure 2

doi: https://doi.org/10.1371/journal.pcbi.1000418.g002