Figures
Abstract
Nowadays, distributed renewable energy generation sources are increasingly popular and strongly impact the traditional power grid. Therefore, determining the appropriate penetration of these sources is a big challenge because of the randomness of the renewable electricity output. This study applies a robust and stable algorithm, called the modified coyote optimization algorithm (MCOA), to determine an optimal solution for the effective integration of wind turbine and photovoltaic distributed generation units (WT-PVDGUs) in different-scale power grids of IEEE 33 buses and 69 buses. For the first case, the primary goal is to minimize the combined costs of investment, operation, and maintenance (OM) of WT-PVDGUs, energy purchase for loads, and energy loss during distribution while mitigating the harmfulness of harmonics on power quality and load operation. The study applies Weibull and Beta probability distribution functions (pdfs) to predict the output power of WT-PVDGUs to enhance the quality of the found feasible solutions. The obtained results from the suggested method are compared with five other active methods to demonstrate the superiority of MCOA with total cost savings of up to 25.56% ($4.1811 million) for the first system and 27.05% ($4.9090 million) for the second system over the 20-year project life cycle. In addition, in the second case, the optimal solution from MCOA achieves a loss reduction of up to 65.51% in the first system and 69.17% in the second system. These results are better than dozens of recently published methods. Not only that, but the voltage profile is also raised to the best range, and the total and individual harmonic distortions are mitigated and meet the IEEE Std. 519 thanks to the optimal installation of units in the power grids. Therefore, this study has significantly contributed to reducing total costs, eliminating the harmful effects of harmonics, and dealing with uncertainty regarding renewable energies.
Citation: Kien LC, Phu ND, Nguyen TT, Pham TD, Duong MP (2026) Minimizing total costs for distribution power grids considering harmonics and uncertainty of wind speed and solar radiation. PLoS One 21(9): e0355399. https://doi.org/10.1371/journal.pone.0355399
Editor: Wei Yao, Huazhong University of Science and Technology, CHINA
Received: July 1, 2025; Accepted: July 21, 2026; Published: September 11, 2026
Copyright: © 2026 Kien et al. This is an open access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.
Data Availability: Data of IEEE 33-bus and IEEE 69-bus DS are, respectively, taken from the following sources: https://doi.org/10.3390/en11041018 and https://doi.org/10.3390/en12010174. Other data are given in Tables A1-A6 in the Supplementary Material.
Funding: This research was funded by Ho Chi Minh City University of Technology and Engineering, Vietnam, under Grant No. T2026-174 (to N.D. Phu).
Competing interests: The authors have declared that no competing interests exist.
Abbreviation:: ABC, Artificial bee colony algorithm; ALOA, Ant lion optimization algorithm; BBO, Biogeography-based optimization; BSOA, Backtracking search optimization algorithm; CABC, Chaotic artificial bee colony algorithm; EO, Equilibrium optimizer; GRO, Garra rufa optimization; GSA, Gravitational Search Algorithm; AA, Autoadd algorithm; MOBA, Multi-objective bat algorithm; NGO, Northern Goshawk Optimization; PSO, Particle swarm optimization; PVDGU(s), Photovoltaic distributed generation unit(s); SMA, Slime mould algorithm; GWO, Gray wolf optimization; SSA, Salp swarm algorithm; TSO, Transient search optimization; WTDGU(s), Wind turbine distributed generation unit(s)
1. Introduction
The gradual transition from fossil fuel energy to renewable energy is a major global challenge. The potential benefits from the use of renewable energy are enormous and promising for solving the problems that the world is facing, related to environmental protection and energy stability. Therefore, many countries around the world have policies to support the penetration of this energy source to increase the proportion of national energy generation [1]. Like Sweden, renewable energy penetration has increased steadily from 33% to 58% of total generation for the period 1990–2019, thanks to appropriate policies (In 2019, the country’s total electricity output amounted to 164.4 TWh), and the Swedish government also set a national target for reaching 100% renewable energy by 2040 [2]. Another country whose government is paying great attention to the use of renewable energy and reducing emissions is Japan. Japan is currently the fifth-largest emitter of greenhouse gases in the world, and the government has committed to net-zero emissions by 2050. To achieve this commitment, Japan has adapted strategies to suit the country’s specific circumstances for the purpose of increasing the electricity production from renewable energy to the range (50% − 60%) by 2050, 10% for Hydropower and (30% − 40%) for nuclear and fossil energies with the application of carbon capture and storage technology [3]. Moreover, larger countries like India and China have also significantly boosted the penetration of renewable energy. For example, the study [4] has stated that, in India, renewable energy production accounted for 28.04% in 2022, corresponding to 113.226 GW. Not only that, this country also aims to achieve 54% and 80% for the market share from renewable energy by 2030 and 2040, respectively. In addition, in China, carbon-neutral scenarios have also been proposed to reduce emissions and maximize renewables. The results from the research [5] show that this country has the potential to reach 60% of total energy consumption from renewables and 90% of total national generation by 2050. With the strong energy transition, air quality will improve with an 85% reduction in 2050 compared to 2020. Realistically, the penetration of renewable energy sources brings both benefits and challenges [6]. The use of renewables has many advantages in terms of reduced emissions, unlimited supply, and lower operating and maintenance costs. However, due to the uncertain nature of these sources in terms of dependence on environmental conditions, this leads to unstable power output, and it is difficult to predict generation for planning electricity distribution. Different popular approaches, such as mixed-integer linear programming (MILP), mixed-integer nonlinear programming (MINLP), and meta-heuristic methods (MHM), are also applied to determine the optimal penetration for maximizing the received benefits and limiting the negative impacts from connecting renewables into the power grid [7]. Researchers around the world have proved that integrating renewable sources as distributed generation units (DGUs) into the distribution systems (DSs) can be considered as one of the great solutions that bring effective economic-technical-environmental benefits [8,9]. However, connecting PVDGUs to DSs also causes many adverse effects due to changing the power grid structure, and the extent of this influence largely depends on the access location and installation power of DGUs. Thus, it is essential to determine the optimal the placement and efficiency of PVDGU in DSs [10].
Among the MILP, MINLP, and MHM groups, the MHM group offers many advantages in terms of performance, stability, and implementation structure over the remaining groups. Therefore, the MHM group is widely used for various optimization problems, especially the problem of finding an optimal solution for the integration of DGUs in the distribution network. A fuzzy classification algorithm based on RAO-3 was proposed for optimizing both DGUs and Shunt Capacitors after network reconfiguration [11]. PSO variants have been applied to determine the penetration of DGUs in the power grid to minimize branch losses and enhance voltage profiles [12]. The results of that research showed clear benefits from properly integrating DGUs into DSs. Although PSO is a popular algorithm, it has many disadvantages, such as low efficiency and no convergence guarantee, so several researchers have implemented effective changes through hybridization between the original method and another method to enhance its performance. Hybrid methods, such as analytical approach/PSO [13], PSO/GSA [14], and Fuzzy/PSO [15], have been successfully developed to tackle the installation problem of DGUs in the power grids. The simulation results demonstrated that the hybrid approach is superior to the original method. Similarly, the authors [16] also suggested using ABC to handle optimization problems. Those authors have considered the connection of DGUs into two DSs of 14 buses and 57 buses to analyze the change in loss reduction and voltage improvement. The results demonstrated that the amount of loss reduction and voltage enhancement depends on the number of DGUs that are connected to the grid. With the same applied method, other authors have focused on the economic aspect of successful minimization of the total energy cost, thanks to the appropriate determination in installing DGUs [17,18]. ABC is also a traditional and long-standing method, but its biggest drawback is that it is easy to fall into the local zone, like GA and PSO. Besides, due to the complex structure of this algorithm, when it has to go through all three bee phases, the data processing time for a feasible solution is longer than that of other methods. To overcome the disadvantages of ABC, an improved method called CABC was born. CABC is also applied to the considered optimization problem, and it successfully solved the voltage stability improvement problem as the main target with the high penetration level of DGUs in the power grid [19]. In another aspect of considering harmonic distortions from nonlinear loads, authors in [20,21] have also positively mitigated harmonics to the allowed limits in IEEE Std. 519 and enhanced the power quality by identifying the appropriate placement and capacity of DGUs. Additionally, more effective algorithms such as SSA [22] and GWO [23] have shown superior performance and stability in tackling real-world optimization problems with the high penetration of capacitors (CBs) for the purpose of reducing losses and improving voltage stability indices in distribution systems. Not only that, some other interesting studies have also addressed the problem of DGUs connection into smart microgrids. Solving the optimization problem for this type of grid is very complex [24–27]. The authors in [24] applied traditional algorithm (GA) combined with optimal tuning parameters to find the best solution for solar power systems and electric vehicle charging stations (EVCS) to minimize losses and increase the proximity of EVCS to the load center in the microgrid of a university in Brazil. Meanwhile, other authors from [25] proposed a hybrid method between GSA and general algebraic modelling system (GAMS) for determining penetration of solar, wind and hydro power sources. Thanks to the simultaneous integration of these sources combined with reconfiguration, the losses and annual costs were significantly saved for the microgrid system. Besides, the study in [26] used active algorithm of AA to search the place and sizing of DGUs for improving the efficiency of the low voltage microgrid operation with intermittent power outage problem of Iraqi scenario considering maximum condition of load demand. Similarly, another research on the complex Ekbatan residential grid in Tehran, Iran was also implemented [27]. The objective was to determine the appropriate interconnection of components, including different renewable energy sources, in which the uncertainties of irradiance, wind speed, and load were considered to maximize grid reliability with minimum operating costs. Although the above methods have demonstrated their effectiveness in some specific optimization problems, they are still limited in terms of search performance as well as the ability to avoid local traps. To overcome the shortcomings of previous optimization algorithms, in 2018, Pierezan, J., and Coelho, L. D. S. successfully developed an efficient global optimization algorithm, called COA [28]. This algorithm was inspired by the coyotes’ pack behavior in the vast nature. COA has been applied to various optimization problems [29,30], including the problem of determining the optimal penetration of DGUs in various scales of distribution networks [31]. In the study [31], COA is compared with other methods for the reduction of both transmission loss and operational cost of voltage regulators, reaching greater results than others. However, COA also suffers its biggest disadvantage: falling into the local optimal trap in new solution generation techniques in conditions of a large search space and a large number of variables. Thus, several researchers have introduced an improved version called MCOA [7], which has higher stability and efficiency than the original algorithm. For convenience of literature review, a summary of previously published works are presented like Table 1.
In general, most previous studies have only focused on stabilizing node voltage and reducing line power loss in DSs. However, studies have not adequately considered other important factors. Specifically, aspects such as the initial investment cost of the project and the operating costs throughout the project’s lifespan are often overlooked or only mentioned very briefly. The shortcomings of a comprehensive assessment of these economic factors can reduce the practicality and effectiveness of applying solutions to real-world distribution power grids. In addition, some other authors have also paid attention to the presence of harmonics from nonlinear loads but lacked the calculation of loss and voltage values at all frequency orders [20,21]. Realistically, power loss and voltage exist at both fundamental and higher-order frequencies. Thus, to evaluate the related aspects of installing DGUs correctly, these values should not be limited for computation to the fundamental frequency alone but must also account for higher frequency orders. Considering multiple frequency levels enables a more precise analysis. Furthermore, with the high penetration of renewables such as wind and solar energy sources, it is necessary to comprehensively consider aspects related to technical and economic factors to maximize welfare without affecting the grid [32,33]. Not only that, wind speed and solar irradiance are strongly influenced by natural environmental conditions, leading to continuous and unpredictable variations over time [34]. These fluctuations directly affect the output power of WTDGUs and PVDGUs. As a result, planning these sources into distribution networks becomes more challenging, since their generation capacity cannot always be accurately predicted. Most studies in the past have neglected the uncertainty due to its complexity. Thereby, in this paper, WTDGUs and PVDGUs will be carefully considered to determine the optimal planning strategy under variable conditions of wind speed and solar irradiance, respectively. Moreover, an efficient algorithm for addressing the optimization problem should also be introduced because it has a significant influence on the obtained benefits. The new algorithm with high stability and performance should especially be welcomed and widely used in tackling optimization tasks.
As mentioned, in this study, MCOA, which was published in recent years, is suggested for addressing the optimal installation of WT-PVDGUs with the main goal of minimizing total costs from investment to operation, and also branch loss during project implementation without affecting the existing grid in technical aspects in different-scale power grids, considering strict technical constraints. Overall, the novelties of this study can be briefly indicated as:
- (1) This work considers the total costs, including investment cost, OM cost, main grid power import cost for loads, and cost for power losses on distribution branches with strict technical constraints for a long-term project of up to 20 years. This is evaluated as a comprehensive economic consideration while still fully satisfying the stated technical criteria.
- (2) This study implements the simultaneous integration of various renewable energy generation sources, such as wind energy and solar energy, into the distribution power grid. Weibull and Beta pdfs with collected actual data over three years are applied to simulate the uncertainties of wind speed and solar radiation for determining the power output of WTDGUs and PVDGUs, respectively. This will contribute to enhancing the accuracy of predicting the output power of grid-connected renewables, and thereby improving the quality of the found solution and reducing the power difference from the actual case.
- (3) This work also performs simulations on different scale systems of IEEE 33-bus and 69-bus DSs under harmonic conditions due to the high penetration from nonlinear loads. The IEEE std. 519 for permissible limits of harmonic indices, such as total harmonic distortion (THD) and individual harmonic distortion (IHD), are established. This is also considered a new point due to the complexity of calculations in the frequency domains, and previous works have limited consideration of harmonics.
- (4) This research has successfully implemented six powerful algorithms, including EO, TSO, SMA, NGO, COA, and MCOA, to address the same optimization problem. The obtained numerical results are also compared in many aspects of performance and stability to demonstrate the superiority of the suggested method. This also contributes to introducing a powerful optimization method for tackling real-world optimization problems.
The primary contributions of this study are also listed as follows:
- (1) From the economic perspective, the study successfully proposed the integrated solution of WTDGUs and PVDGUs for total cost reduction of up to 25.56% and 27.05% for the entire project life cycle on the 33-bus and 69- bus systems, respectively, compared to the original systems. This proves that the appropriate penetration of decentralized generation units has brought great economic benefits through reducing investment cost, OM cost, main grid electricity import cost, and branch power loss cost.
- (2) From the technical perspective, the proposed optimal solution not only enhances the bus voltage profile with the weakest voltage from 0.9051 (pu) to 0.9523 (pu) and from 0.9105 (pu) to 0.9558 (pu), but it also reduces the branch current profile with the maximum current from 0.4624 (pu) to 0.3217 (pu) and 0.4902 pu to 0.3441 (pu) for 33-bus and 69-bus DSs, respectively. Additionally, the values represent the influence of harmonics on the grid (THD and IHD), which are also successfully mitigated from (5.7491% and 3.7295%) to (4.2180% and 2.7365%) for the first system and from (5.2646% and 3.4025%) to (4.4783% and 2.8943%) for the second system in the first case. Similarly, in the second case, the reduction of system loss also reached 65.51% and 69.17% for the first and second systems, respectively. This contribution of the proposed solution is great, as it satisfies all the declared technical criteria and significantly improves power quality.
The rest of the paper is divided as follows: Section 2 presents the objective function and technical constraints. Section 3 shows the structure of MCOA. Section 4 describes the application of MOCA to solve the considered problem. Section 5 collects and analyzes simulation results. The last part summarizes the main points of the whole paper, known as the conclusions. In summary, to achieve the main goal of cost-effective saving while still fully meeting the technical criteria of a long-term project for integrating WTDGUs and PVDGUs into the distribution grids, this study has minimized the economic objective function of total combined costs of investment and OM, total cost of importing electricity from the primary grid for loads and total cost of power loss during the grid operation. Technical constraints such as node voltage, line current, harmonic indices, and penetration level are also established, as presented in Section 2.
2. Problem formulation
In this work, the optimal solution for the simultaneous connection of wind and solar energy sources to different distribution power grids is determined to maximize economic benefits and satisfy technical constraints.
2.1. Objective function
The study integrates WTDGUs and PVDGUs in DSs to reduce the total cost, including 1) the investment and OM costs of WTDGUs and PVDGUs, 2) the power grid purchase cost and 3) the line energy loss cost. Realistically, the total cost of systems before connecting DGUs is the sum of the purchasing energy and energy loss costs. If the integration of DGUs is effective, the total cost will be reduced and smaller than that of the original system. The target in this case can be mathematically expressed as Eq. (1) [7]:
Where is total combined cost of the power systems with WTDGUs and PVDGUs;
is the costs from the investment and OM for WT-PVDGUs;
is the cost of energy purchase through the main grid substation; and
is the cost of distribution branch energy losses.
2.1.1. Determination of
.
is considered as an important component in the objective function and it is the sum of initial capital cost and OM cost. Specifically, the initial capital cost is paid only one time while the OM cost is paid throughout the project life cycle. In other words, the initial capital cost is called fixed cost and the cost of OM is called variable cost which dependents on the power output. The
can be determined by Eq. (2):
Where and
are respectively fixed cost and variable cost that can be calculated using Eqs. (3)-(4) [35]:
As mentioned, this work supposes the project period of 20 years considering the uncertain characteristic of wind speed and solar irradiance over four seasons. In Eq. (4), 96 is the number of hours for four days in which each day is a representative for each season. Besides, coefficient of 91.25 is used to convert 96 hours into 8760 hours (i.e., the result of is 8760 hours) [36]. Moreover, annual cost which is found from Eq. (4), is not the same for the considered yth year due to the impact of
. Specifically,
is a function of the year order, and its annual value can be identified as Eq. (5) [7]:
where, ir is defined as the interest rate (ir = 0.09); and y is the year index of the 20-year project.
2.1.2. Determination of
.
By installing both WTDGUs and PVDGUs in the distributions system, each system have three main power sources including 1) distribution transformers connected at the slack bus, 2) WTDGUs and 3) PVDGUs. The imported power energy cost in Eq. (1) is the amount of money paid for the electric company from using energy supplied through the distribution transformer. This cost is computed by using Eq. (6) [37]:
Where (in MW) is the real power of the lth load at the hth hour of the yth year after connecting WT-PVDGUs; and
(in $/MWh) is price of energy buying from primary grid.
2.1.3. Determination of
.
Current flowing in distribution lines is a main factor affecting economic as well as the technical issues of distribution systems [38]. The current on branches with the high magnitude value can lead to high active power loss and the transmission power congestion [39]. The energy loss cost for one hour can be insignificant but that over one year and many years is serious. Therefore, the energy loss cost should be considered as a primary economic issue that needs to be minimized as much as possible. This cost can be determined using Eq. (7):
Where (in MW) is the bhth branch power loss at the hth hour in the yth year with installing WT-PVDGUs;
(in $/MWh) is energy loss price.
In this paper, harmonic flows are produced by the nonlinear loads in the DSs and so, harmonic distortions are considered for calculating the active power loss, by applying Eq. (8) [20]:
Where of the bhth branch current at the hth hour from the yth year with installing WT-PVDGUs and it can be obtained by using Eq. (9) [40]:
2.2. Constraints
The mentioned economic objective should be minimized as much as possible, considering the following technical constraints:
2.2.1. The power balance constraints.
To maintain frequency and voltage stability, the total generation should be equal to the total power consumption, including power losses [40]. After placing WTDGUs and PVDGUs in distribution systems, the total generation is the sum of power supplied by the primary grid and the power generated by WTDGUs and PVDGUs. Thus, the power balance equations are expressed by Eqs. (10)-(11) [27]:
In the Eq. (11), and
can be found by:
where, are the power factor values of the wth inverter-based WTDGU and the pth inverter-based PVDGU, and these values should be within 0 and 1 [41].
2.2.2. The branch current limit.
The penetration of renewable energy sources into DSs can lead to increase or decrease in the current on the distribution line. Therefore, to keep the original configuration of the grid, the current with WT-PVDGUs must not exceed the following allowable limit as Eq. (14) [42]:
2.2.3. The bus voltage limits.
The load voltage after adding renewable power sources in DSs will change compared to the initial values. According to the BS EN 50160 standard, all loads should be operated within the range [0.90, 1.10] pu. However, in this study, the voltage is limited to a more stringent range of 0.95 to 1.05 pu [31]. The mathematical equation is presented as Eq. (15):
where, and
are allowable maximum and minimum voltage limits for all loads, respectively.
is the operation voltage of load for the ith bus in the hth hour from the yth year. This voltage value can be obtained by using Eq. (16) [40]:
2.2.4. The harmonic voltage distortion constraints.
The presence of harmonic distortions can lead to various undesired effects, such as increased current in distribution lines, additional energy losses, and temperature rise in electric components [43]. These can reduce the life and damage grid-connected equipment. Therefore, IEEE Std. 519 is applied with maximum allowable limits of 3% and 5% for individual and total voltage harmonic distortions, respectively, and the harmonic indices are set in the constraints like Eqs. (17, 18) [20]:
Where, and
are determined by using Eq. (19) and Eq. (20), respectively:
2.2.5. The WT-PVDGU’s penetration level constraints.
In this study, the total actual generation of all connected units should not exceed the sum of the total consumption at each time. To express the generation limit in mathematical model, the equation is suggested as Eq. (21) [8]:
The installed capacity of each connected unit is also limited within the predetermined ranges as Eqs. (22) and (23):
2.3. Uncertainty modeling
In this study, a considered year includes four different seasons, and the representative day of each season is calculated to simulate the variable behavior of the wind turbine and photovoltaic distributed generation units. Each representative day is divided into 24-hour segments, resulting in a total of 96 time segments for a whole year. To predict the hourly wind speed and solar irradiance, the Weibull and Beta pdfs are utilized, based on historical data collected over three years from the actual research site. Additionally, the load profile is assumed to adhere to the IEEE RTS-96 [44].
2.3.1. Calculation of wind power uncertainty.
For simulating wind speed, in the Weibull pdf, two important parameters deciding the shape of the graph are the scale index and the shape index
[45, 46]. In previous studies [44,47,48],
= 2 and
(where
is average of wind speed) were proposed for estimating probability distribution of wind speed. And Weibull pdf becomes the Rayleigh pdf as expressed in Eq. (24) [47]:
In this study, the wind speed values expected in the specified location are assumed to fall within 20 intervals of wind speed, with each step of 1.0 m/s as supposed. To determine the probability of wind speed at a specific hour, the model of Eq. (25) is applied [44]:
where, and
are wind speed limits of stage
.
Additionally, to calculate the actual power output of wind turbines for each particular wind speed, the function as Eq. (26) is used to depict the generation characteristic of the wind turbine [45]:
By using the probability function, the expected output power from the wind turbine can be reached as shown in Eq. (27). And finally, we can find the expected total output power at a specific time period by applying Eq. (28) [48].
2.3.2. Calculation of solar power uncertainty.
In this study, the Beta pdf is used to simulate the solar irradiance at every hour [44], and its equation can be described as Eq. (29) [48, 49]:
where, is defined as the gamma function. Two parameters, a and b, can be found by using the standard deviation and the mean of solar irradiance [32].
In this case, solar irradiance is assumed to consist of 20 irradiance intervals in the considered range, with each step of 0.05 kW/m2. The probability of solar irradiance at a specific hour can be determined as Eq. (30) [44]:
where, and
are solar irradiance limits of state
.
Besides, the output power of photovoltaic distributed generation unit corresponding to each specific solar irradiance () can be found by using Eq. (31) [49].
Where, and
are the fill factor and the number of photovoltaic modules; and
and
are voltage and current of photovoltaic module with the solar radiation r, respectively. The calculation of these four factors can be referred to the study [49].
Lastly, the expected output power of the photovoltaic unit considering the effect from solar irradiance is obtained by applying Eq. (32), and the expected total output power of the photovoltaic module at a specific time period can be calculated by using Eq. (33) [48,50]:
3. Applied optimization algorithm
In this study, a robust method called MCOA is applied to address the problem of optimal installation of WTDGUs and PVDGUs in distribution networks. MCOA is a modified version of the original algorithm, COA, which has been demonstrated to have many outstanding advantages over other methods in solving a variety of optimization problems. The main advantages of COA that can be listed are (1) the good balance between exploration and exploitation of potential solutions, (2) the strong ability to maintain high diversity in the population to find quality solutions by avoiding premature convergence, (3) the great performance and stability in determining the global optimal solution and (4) the found solution quality is superior to others in the optimization fields [51–53]. Although COA is a powerful algorithm, it still has disadvantages like time-consuming data processing, low performance, and stability when solving complex problems with a large number of variables. Therefore, MCOA was developed to inherit the advantages and overcome the disadvantages of the original algorithm. Like the original COA, each individual (coyote) in the population from MCOA is also characterized by living conditions and the quality of living conditions. The living condition corresponds to the solution of the optimization task, and the quality of the living condition reports the fitness level of each solution. In this algorithm, the coyote community is separated into groups, and each group has
coyotes. Thus, the coyote population
is equal to (
). The structure of MCOA can be presented as follows [7]:
Like other population-based algorithms, the initial population is randomly produced within the constraints of the search space for possible solutions to the problem, like Eq. (34):
where, and
are maximum and minimum allowable values of each control variable in the proposed solution. In this algorithm, there are two main stages for creating the next generation. In the first-generation stage, MCOA uses the following mathematical equation for updating new solutions [7]:
The variables in the newly obtained solutions are compared to the allowable values of and
. Variables with a higher value than the maximum allowable value of
are set to the maximum value, and vice versa; variables with a smaller value than the minimum allowable value of
are set to the minimum value. Each created new solution is re-evaluated according to the fitness function
, and the comparison is executed between the old and new solutions to keep the more dominant solution and its fitness.
In the second-generation stage of producing new solution, only one new solution () is produced for each group by using Eq. (36) or Eq. (37).
are the best solutions of groups, and they are chosen randomly. The two equations have the same manner that applies the search space around the global solution to find new solutions, but they are different in using the number of increased steps. Eq. (36) uses two increased steps while Eq. (37) needs one more increased step. Thus, the application condition of the two equations is very important for finding a more effective solution than the current global solution. To have a suitable selection, a ratio between the number of close solution couple numbers (Ncc) and the maximum solution couple number (Nmc) is determined, and then it is compared to a predetermined threshold (ε). If (Ncc/ Nmc) is smaller than the ε value, Eq. (36) is applied. For another case (i.e. Ncc/ Nmc is equal to or higher than the ε value), Eq. (37) is selected [7].
4. Using proposed algorithm to solve the considered problem
4.1. Initialization for solutions
For producing the initial population as presented in Eq. (34), the boundaries of and
are defined as follows:
Once the solutions are generated, the forward-backward sweep technique (FW-BWST) [54] is applied for analysis of the power flow and the harmonic flow on all distribution lines. Based on obtained components (including branch current, bus voltage, total and individual harmonic voltage distortion violations) and their allowable limits, penalty terms for each proposed solution are calculated. Finally, the fitness function can be identified from the obtained results of the objective function and the penalty function as Eq. (40).
4.2. Generating and handling new solutions
As presented in Section 3, the suggested method, MCOA performs two generation stages for finding potential solutions, in which, new solutions in the first stage () are produced by using Eq. (35) and the new solution in the second stage (
) are generated by using Eq. (36) or Eq. (37). New solutions will be checked for determining the limit violation, if any variable in the produced solution falls outside the acceptable limits, it will be brought back to the nearest boundary limit.
4.3. The MCOA flowchart for solving the optimization problem of integrating WT-PVDGUs
An iterative algorithm by using MCOA is repeatedly implemented for finding the most suitable solution of installation of WT-PVDGUs until reaching the predetermined maximum iteration (). Applying MCOA for the considered optimization problem is briefly summarized in Fig 1.
5. Simulation results
5.1. Case 1: Considering the uncertainty of DGUs
In this paper, the six optimization algorithms, such as EO, TSO, SMA, NGO, COA and MCOA, are applied to find optimal connection of WT-PVDGUs in IEEE 33-bus and IEEE 69-bus DSs, considering the strict technical constraints. All algorithms are implemented in MATLAB (ver. 2017) on a PC with 8.0 RAM and a 1.8 GHz processor. For suggested method, the population and iteration numbers are surveyed to select the appropriate values. Specifically, Nco is equal to Ngr as 4. The ε value is chosen to be 0.2 as the result from the survey in the range of [0.0, 1.0] with the step size of 0.2 [7]. In addition, the remaining specific parameters of the used methods are selected according to the recommendations by previous studies such as EO [55], TSO [56], SMA [57], NGO [58] and COA [28]. Moreover, parameters related to calculating grid operational costs are also reported in Table 2.
As mentioned, this study applies the Weibull and Beta pdfs for estimating the probability distribution of wind speed and solar radiation. The Weibull and Beta pdfs have been widely used in previous studies and have proven effective in predicting wind speed and solar radiation, respectively. For calculating the probability distribution of wind speed and solar radiation, actual measurement data at the study area with the coordinates of 56.4907o N and 4.2026o W (Scotland) are obtained through using POWER Data Access Viewer v2.0.0 [60]. In addition, to improve the accuracy in predicting wind speed and solar radiation, data for three consecutive years from 2018 to 2020 are collected. The concerned period is one year, separated into four seasons, in which each season is represented by one day with 24 one-hour intervals. Thus, the mean wind speed as well as the mean solar radiation and its standard deviation of representative days are reported in S3, S4 and S5 Tables in S1 File. Technical parameters of the wind turbine and photovoltaic module are also shown in S6 Table in S1 File [61] and S7 Table in S1 File [44] in the Supplementary Material, respectively. For modeling load demand in test systems, load factors of IEEE RTS-96 are used and presented in S8 Table in S1 File [44]. In this case, three PVDGUs and three WTDGUs are considered for connection to systems, with the minimum and maximum numbers for each connection location supposed to be in the limits of (01 wind turbine and 15 wind turbines) and (1,000 photovoltaic modules and 20,000 photovoltaic modules). The rated power of each wind turbine and each photovoltaic module is 100 kW and 75 W, respectively, and the inverters of these units are also assumed to be able to work at the lagging power factor of 0.9, as in previous studies [36,62]. As stated, the study examines the occurrence of harmonic distortions on the power grid. Harmonics can significantly affect the performance and reliability of grid-connected components such as transformers, capacitors, etc. When nonlinear loads introduce harmonic currents into the network, the distorted waveform increases the current flowing through the electrical equipment. For transformers, harmonics can lead to increased losses, overheating, insulation ageing, and reduced service life [63]. Besides, capacitors are also affected by harmonics. Capacitors tend to draw harmonic currents, which can lead to overcurrent and increased dielectric stress. In some cases, resonance that amplifies harmonics also increases voltage distortion [64]. In addition to directly impacting individual equipment, harmonics also contribute to increased network losses on distribution lines [65]. For these reasons, assessing harmonic distortions by considering harmonic criteria is essential to maintaining power quality and ensuring reliable system operation in modern power systems with the increasing use of power electronics. Therefore, this study evaluates the impact of harmonics, which are produced by nonlinear loads, with the harmonic spectrum, including harmonic magnitude and phase angle, as referenced from [66], as given in Table 3. Therefore, FW/BWST is applied to address power flow and harmonic flow problems in all test systems [54]. Firstly, at the fundamental frequency, the power flow is computed to find node voltage and line power loss, and then, at each higher frequency order, the admittance matrix is determined according to the frequency. Finally, the node voltages and line losses at the considered frequency orders are calculated based on the corresponding admittance matrices and harmonic current injections. From the obtained results, harmonic indices, including THD and IHD, can be determined by using the above Eqs. (19) and (20).
5.1.1. The simulation results for IEEE 33-bus DS.
In this section, IEEE 33-bus DS is used as a test system to find the optimal solution of the placement of WTDGUs and PVDGUs. The system’s configuration is shown in Fig 2, and its data are shown in S1 Table in S1 File [9], and five nonlinear loads are located at buses No. 15, 20, 24, 29, and 32.
The best total cost from the implemented methods of EO ($13.0499 million), TSO ($13.1642 million), SMA ($13.0717 million), NGO ($13.1231 million), COA ($13.0278 million) and MCOA ($13.0156 million) in 40 trials is presented as six bars in Fig 3. Obviously, the bar of the suggested method, MCOA is the shortest with $13.0156 million, and its value is less than those of EO, TSO, SMA, NGO and COA by $34.3 thousand, $148.6 thousand, $56.1 thousand, $107.5 thousand and $12.2 thousand, respectively. In other words, the total cost difference between the compared methods (EO, TSO, SMA, NGO, and COA) and the suggested method is equivalent to 0.26%, 1.14%, 0.43%, 0.82% and 0.094%. Although these differences are not significant, they contribute to reflecting the effectiveness of MCOA compared to the original method and others. Moreover, to clearly show the economic benefit from integrating WT-PVDGUs into the grid compared to the base system, the obtained results have also been presented in Table 4. Before connecting WT-PVDGUs, the total cost () at the original system, including energy loss cost on branches ($388.695 thousand) and energy purchase cost for loads ($17.3329 million) over 20 years, is $17.7217 million. However, thanks to WT-PVDGUs being integrated into the system by using the applied algorithms, the total cost from the found optimal solutions is much lower than that of the base system. Specifically, MCOA sharply cut the total cost from $17.7217 million to $13.0156 million with the reduction of $4.7060 million, corresponding to 26.56% in cost savings. The cost saving values compared to the base case from the remaining methods are not as good as that of MCOA, but it is still significant. In detail, it ranges from 25.72% (saving to $4.5574 million) at the worst method (TSO) to 26.48% (saving to $4.6938 million) at the second-best method (COA). This demonstrates the huge economic benefit from the proper connection of WTDGUs and PVDGUs in the distribution network.
All costs related to the objective function are also analyzed specifically in Table 4. The costs ( and
) from the solution of MCOA, EO, TSO, SMA, NGO and COA are ($6.3884 million and $6.5353 million), ($6.3621 million and $6.5764 million), ($6.1816 million and $6.8583 million), ($6.3591 million and $6.5812 million), ($6.2410 million and $6.7655 million), and ($6.3714 million and $6.5619 million), respectively. Obviously, the costs of investment and OM from MCOA are higher than the five compared methods, but the cost of purchasing electricity from the main grid of MCOA is more economical than all other methods. Besides, the cost (
) from MCOA ($91.830 thousand) is also lower than EO ($111.398 thousand), TSO ($124.417 thousand), SMA ($131.515 thousand), NGO ($116.645 thousand), and COA ($94.540 thousand). In other words, the optimal solution of the suggested method has higher investment and OM costs, but it brings better economics compared to other methods in terms of electricity import cost and power loss cost. As mentioned, the most important value is the total cost for implementing this project, and MCOA has found the best solution in the economic aspect, considering technical requirements, compared to others. Therefore, it can be affirmed that MCOA is the most effective method for the optimization problem in this case.
5.1.2. The simulation results for IEEE 69-bus DS.
In this case, WTDGUs and PVDGUs are considered for connection in the IEEE 69-bus DS. The whole data of the system are shown in S2 Table in S1 File, and its configuration is plotted in Fig 4 [20]. The nonlinear loads are also located at buses No. 8, 12, 18, 22, 24, 34, 46, 55, and 65.
Fig 5 presents the best total cost in the trials of the implemented methods, including EO ($13.2609 million), TSO ($13.3089 million), SMA ($13.2854 million), NGO ($13.3021 million), COA ($13.2539 million), and MCOA ($13.2419 million). Clearly, the total cost from the suggested method, MCOA, is the most economical compared to the other methods. The difference in total cost between the suggested method and the compared methods of EO, TSO, SMA, NGO, and COA is up to $19.0 thousand (0.14%), $67.0 thousand (0.51%), $43.5 thousand (0.33%), $60.2 thousand (0.45%), and $12.0 thousand (0.09%), respectively. Although this difference is not large, it still indicates the excellent performance of MCOA compared to the original algorithm and other algorithms. In addition, the economic benefit of applying the optimal solution from the methods compared to the base case is also analyzed in Table 5. In the initial system, without penetration of PVDGUs and WTDGUs in the grid, the total cost includes $17.7384 million from purchasing electricity from the main grid and $412.4749 million from power loss during operation, so the total cost to be paid over 20 years is up to $18.1508 million. However, by using the optimal solution from the implemented methods for placing PVDGUs and WTDGUs in the grid, the total cost is reduced to $13.2609 million, $13.3089 million, $13.2854 million, $13.3021 million, $13.2539 million, $13.2419 million for EO, TSO, SMA, NGO, COA, and MCOA, respectively. Obviously, the solution from MCOA is the most economical, with a cost saving of up to $4.9090 million (equivalent to 27.05%) compared to the base case. Meanwhile, the other solutions only save 26.94% (EO), 26.67% (TSO), 26.81% (SMA), 26.71% (NGO), and 26.98% (COA). In other words, the solution found by the suggested method is better than other methods in addressing the problem of integration of PVDGUs and WTDGUs in the distribution grids.
All the costs considered in this study are also presented in detail in Table 5. The costs ( and
) for EO, TSO, SMA, COA and MCOA are ($6.6092 million and $6.5603 million), ($6.5006 million and $6.7297 million), ($6.5797 million and $6.6064 million), ($6.5354 million and $6.6755 million), ($6.6079 million and $6.5622 million) and ($6.6095 million and $6.5597 million), respectively. These numerical results show that the optimal solution from MCOA has higher investment and OM costs but lower electricity import costs from the main grid compared to other methods. Besides, the cost of
from MCOA is $72.6193 thousand, which is also lower than the remaining methods, such as EO of $91.4831 thousand, TSO of $78.5694 thousand, SMA of $99.3829 thousand, NGO of $91.2897 thousand, and COA of $83.8065 thousand. All these results have proven that the solution from MCOA, although having higher investment and OM, has a more economical electricity purchase cost and power loss cost than all other methods in this case. In summary, since the target of total cost for implementing this project by applying the optimal solution from the suggested method is better than other compared methods, it can be affirmed that MCOA is an effective method in addressing optimization problems in different distribution networks.
The location and the number of installed WTDGUs and PVDGUs by using the solution from applied methods for the two systems are given in S9 Table in S1 File. Selected installation locations by all methods are not the same for both PVDGUs and WTDGUs; however, the total number of wind turbines is the same for all methods with 23 and 24 wind turbines are respectively taken for the first and second systems. Besides, the total power of PVDGUs is not identical, and in fact, the minimum and maximum total power values are 989,400 W and 1,214,400 W for the first system, and 1,087,125 W and 1,205,500 W for the second system. The hourly output power of WTDGUs and PVDGUs is also plotted in S1 and S2 Figures in S1 File, respectively.
5.1.3. The Contributions of WT-PVDGUs to distribution systems.
As proven in the two sections above, the connection of WT-PVDGUs in two test systems could bring economic benefits effectively. Thus, this section expresses advantages derived from the installation of WT-PVDGUs in distribution systems from a technical aspect. Specifically, Fig 6 and Fig 7 show the highest current of distribution lines during the considered period in the geographic visualization of IEEE 33-bus DS before and after placing WT-PVDGUs. The two figures are the same in that the current of the base system is much higher than that of the integrated system. For instance, the peak current of line 01 in the base IEEE 33-bus DS is 0.4624 pu, while that is 0.3217 pu in the integrated IEEE 33-bus DS. This has proven to be one of the benefits of installing WT-PVDGUs in reducing the branch current in the power system.
Similarly, the highest current of distribution lines during the considered period in the IEEE 69-bus DS before and after placing WT-PVDGUs is also presented in the geographic visualization as Fig 8 and Fig 9, respectively. The peak current of Line 01 in the base IEEE 69-bus DS is 0.4902 pu while that is 0.3441 pu in the integrated IEEE 69-bus DS. In this regard, the advantage of the WT-PVDGUs is to reduce the current on branches, and this can mitigate transmission power congestion as well as save cost for changing the grid configuration in case of increased load demand due to economic development.
Furthermore, Figs 10–13 also presents the voltage profile of the whole system over four seasons. Specifically, the lowest voltage is increased from 0.9051 pu to 0.9523 pu for the IEEE 33-bus DS as plotted in Figs 10 & 11, and from 0.9105 pu to 0.9558 pu for IEEE 69-bus DS as plotted in Figs 12 & 13, based on the penetration of WT-PVDGUs. Overall, during the considering period, the voltage of buses only fluctuates in the range of [0.9523, 1.0223] (pu) in the first system and in the range of [0.9558, 1.0215] (pu) in the second system. Obviously, the two integrated systems fully satisfied the given constraints of [0.95, 1.05] (pu), and this has also contributed to demonstrating the technical benefit of voltage improvement due to the penetration of generation sources into the power grids.
Additionally, Figs 14–17 also show the maximum values of total and individual harmonic distortion (THD and IHD) before and after connecting WT-PVDGUs in the two test systems. The view during the considering period sees that base systems always have much higher values of THD and IHD than the integrated systems with WTDGUs and PVDGUs, even though these base systems violated the standard of IEEE 519. In detail, these values are 5.7491% and 3.7295% in IEEE 33-bus DS, and 5.2646% and 3.4025% in IEEE 69-bus DS for THD and IHD, respectively, at the base case as shown in Figs 14 & 15. However, in the integrated systems, they always satisfy the standard of IEEE 519 with specific values of 4.2180% and 2.7365% in the first system, and 4.4783% and 2.8943% in the remaining system, as shown in Figs 16 & 17. In other words, thanks to the reasonable penetration of WTDGUs and PVDGUs, the harmonic indices such as THD and IHD are significantly reduced and satisfy the standard of IEEE 519 of 5% (for THD) và 3% (for IHD) as the established constraints. This is also considered an additional benefit from the application of the optimal solution regarding the determination of the installation of distributed sources in the distribution grids.
5.1.4. Computation speed from applied algorithms.
The optimal solution for integrating wind turbine and photovoltaic distributed generation units is successfully determined by the implemented methods, as shown in S7 Table in S1 File. However, to ensure a fair and objective evaluation, the initial setup parameters and the data processing speed in loops for each method are also compared.
Specifically, the number of iterations and populations are surveyed, respectively, within the range from 130 to 170 (the step size is 20) and from 16 to 24 (the step size is 4) for applied methods in the test cases, and the appropriate tuning values are clearly reported in Table 6. In the first test system, EO, TSO, SMA, and NGO are configured with an iteration limit of 150 and a population size of 20, while those of COA and MCOA are 150 and 16. For the second system, the loop setup is adjusted by increasing the iteration count to 170 for all methods, while the population settings remained similar to the first system to ensure the best convergence of methods. As mentioned, MCOA is an improved version of COA with more efficient solution generation equations; therefore, MCOA has inherited the outstanding features of the original algorithm, and they have the same characteristic in producing a solution number for each iteration. In detail, these two algorithms divided the population into four groups with four members in each group, and they produced four more new solutions in addition to their population. In brief, all methods have the same number of evaluations for one run, and the settings are fair for all algorithms. However, due to the unique characteristics, the mean computation time for each method is different. For the first system, it takes MCOA about 0.8345 hours for each trial, while it takes others a longer time, from 0.8479 to 1.7011 hours for COA, TSO and NGO. For the second system, the time spent by MCOA is about 1.6156 hours for each trial, while it is from 1.6329 hours to 3.3528 hours for COA, TSO and NGO. Obviously, it can be seen that for a larger system, a greater number of iterations and longer simulation time are required to achieve the optimal solution. Additionally, in both cases, the computation time has not improved significantly, but it has also helped demonstrate the superiority of MCOA over the original method and others. In summary, MCOA is superior to other algorithms in terms of robustness, stability, and search speed.
5.2. Case 2: Considering the fixed output of DGUs
To evaluate effectiveness of the introduced method in the research trends of this field, this study implemented an additional simulation considering the fixed output of DGUs at the peak load level, with the population as reported in Table 6, and the number of iterations are selected as 100 and 140 from the survey for IEEE 33- bus and IEEE 69- bus DSs, respectively. In this case, the optimal results are compared with recently published studies (from 2017 to 2025) in both first and second systems, with the main objective of minimizing total power loss from the penetration of three DGUs. The achieved result is compared to other published methods as presented in Table 7.
Thanks to the optimal solution for connecting DGUs that operate at unity power factor, the total power loss in the 33-bus DS is strongly decreased with a reduction in losses (PLR) of up to 65.51%. However, the determined PLR values from optimal solutions of published methods, such as MOTA [67], HGWO [39], EMA [68], WCA [69], SSA [70], CSCA [71], CMSFS3 [72], WOA [73], WSA [74] and NSGA-II [75], are only varied between 52.4% and 65.50% as presented in Table 7. Obviously, the PLR value of MCOA is the highest, so it can be declared that MCOA is the best method compared to other methods in this case. Similarly, the optimal result from MCOA is also compared with those of many other methods in the larger-scale IEEE 69-bus DS. As shown in Table 7, the total power loss after the penetration of three DGs is significantly reduced, and its PLR value reached approximately 69.17%. Meanwhile, this value only ranged from 68.12% to 69.14% for nine published methods, including HGWO [39], WCA [69], SSA [70], CSCA [71], CMSFS3 [72], TSO [76], WOA [73], WSA [74] and NSGA-II [75]. This indicates that the suggested method yielded the best result with the highest PLR value, making it a truly robust method for solving the optimization problem compared to recently published methods. As mentioned, with the proper integration of DGUs in the distribution grid, the total losses on the network branches have also been minimized as shown in Fig 18. In detail, total branch losses are decreased from 211.0 kW to 72.7827 kW (the reduction amount of 138.2173 kW) for the first system and from 224.5 kW to 69.2065 kW (the reduction amount of 155.2935 kW) for the second system. This is considered a significant benefit by the DGUs connection. Besides the advantage of cutting losses, the optimal solution for integration of DGUs in power grids from the suggested method also offers benefits in terms of voltage enhancement and harmonic mitigation. Specifically, the weakest voltage in the system is pulled up from 0.9038 (pu) to 0.9687 (pu) and from 0.9092 (pu) to 0.9790 (pu) for the 33- bus DS and the 69- bus DS, respectively, as plotted in Fig 19, and this satisfies the bus voltage constraint of 0.950 (pu) to 1.050 (pu). Moreover, harmonic indices of THD and IHD are also reduced, as shown in Figs 20 and 21. Specifically, the THD and IHD indices in the first system are mitigated from (5.7491% and 3.7295%) to (4.2884% and 2.7826%), and from (5.2647% and 3.4025%) to (3.6346% and 2.3482%) in the second system, respectively. The obtained results for harmonic distortion also meet the IEEE 519 standard of 5.0% for the THD index and 3.0% for the IHD index. Based on these numerical results, it can be affirmed that the suitable integration of DGUs can bring multiple benefits in reducing losses, increasing voltage, and reducing harmonics in distribution power grids.
6. Conclusions
In this study, a novel powerful MCOA was applied to solve the optimization problem of integrating wind turbines and photovoltaic distributed generation units in the distribution systems with high impacts of nonlinear loads. The study examined two cases, including the consideration of the uncertainty of DGUs and the consideration of the fixed output of DGUs. In the first case, the main purpose is to reduce the total system costs and also meet the stated technical constraints after placing WT-PVDGUs concerning the wind speed and solar irradiance uncertainties. Weibull and Beta pdfs were also used to estimate the hourly wind speed and solar irradiance based on collected historical data from the actual research site. The collected results from the suggested algorithm indicated a significant reduction in total costs, from $17.7217 million to $13.0156 million (equivalent to 26.56% in cost reduction) for the IEEE 33-bus DS and from $18.1508 million to $13.2419 million (equivalent to 27.05% in cost reduction) for the IEEE 69-bus DS. In addition, the technical constraints are not only fully satisfied but also significantly improved, such as the weakest node voltage is increased from (0.9051 pu to 0.9523 pu) and (0.9105 pu to 0.9558 pu), the maximum THD is mitigated from (5.7491% to 4.2180%) and (5.2646% to 4.4783%), and the maximum branch current is also reduced from (0.4624 pu to 0.3217 pu) and (0.4902 pu to 0.3441 pu) for the first and second systems, respectively. In the second case, the suggested method resulted in a reduction in power loss of up to 65.51% for the first system and 69.17% for the second system, with the satisfaction of all constraints. These numerical results from both cases have proven the enormous economic-technical benefits of implementing the project of integrating WT-PVDGUs into the traditional distribution grid. Moreover, by comparing the optimal solution from MCOA with five effective implemented methods and ten recently published methods, the obtained results also confirmed that the suggested method is better and more stable than others in tackling the considered problem. The simulation results from this study have greatly contributed to affirming the multi-benefits from appropriately determining the penetration of DGUs in the power grid and beyond, also introducing a useful algorithm for solving various optimization problems.
Although this study analyzed the influence of harmonics in the distribution systems, only harmonic sources from nonlinear loads are considered. In fact, harmonics may be produced from both nonlinear loads and power conversion devices of WT-PVDGUs while connected to the grid. Therefore, in the future, harmonics from all potential sources will be considered. Besides, the high penetration of electric vehicle charging stations (EVCSs) and energy storage systems (ESSs) has seriously affected the existing grid. So, further consideration of EVCSs and ESSs, along with the presence of WT-PVDGUs, will be implemented. Besides, the integration of harmonic filters and smart inverters to enhance power quality and maximize renewables generation without technical violations is also considered in the future. Finally, novel optimization techniques such as reinforcement learning-based methods and recent data-driven approaches will be implemented to expand the problem-solving models in dynamically changing environments and large-scale historical datasets. Furthermore, hybrid optimization methods combining meta-heuristics with machine learning or mathematical programming will also be developed to improve both solution quality and computational efficiency. These are evaluated as promising directions for the next study.
Supporting information
S1 File. This file contains Tables S1–S9 and Figures S1–S2.
Tables S1–S7 provide the data of the IEEE 33-bus and IEEE 69-bus distribution systems, average wind speed, average solar irradiance, standard deviation of irradiance, characteristics of the wind turbine and photovoltaic module, IEEE RTS-96 load profile, and the optimal solutions obtained by the applied methods. Figures S1–S2 present the hourly output power of PVDGUs and WTDGUs for the IEEE 33-bus and IEEE 69-bus distribution systems.
https://doi.org/10.1371/journal.pone.0355399.s001
(DOCX)
References
- 1. Wang G, Sbai E, Wen L, Selena Sheng M. The impact of renewable energy on extreme volatility in wholesale electricity prices: evidence from organisation for economic co-operation and development countries. Journal of Cleaner Production. 2024;484:144343.
- 2. Zhong J, Bollen M, Rönnberg S. Towards a 100% renewable energy electricity generation system in Sweden. Renewable Energy. 2021;171:812–24.
- 3. Cheng C, Blakers A, Stocks M, Lu B. 100% renewable energy in Japan. Energy Conversion and Management. 2022;255:115299.
- 4. Debanjan M, Karuna K. An overview of renewable energy scenario in india and its impact on grid inertia and frequency response. Renewable and Sustainable Energy Reviews. 2022;168:112842.
- 5. Zhang S, Chen W. China’s energy transition pathway in a carbon neutral vision. Engineering. 2022;14:64–76.
- 6. Ranga J, Jalli RK, Muthusamy SK, Sundaresan V, Ramesh S, Palanisamy R, et al. Multi-objective integrated approach for distributed generation placement and sizing to enhance performance of radial power distribution system. AEEE. 2025;23(3).
- 7. Pham TD, Kien LC, Nguyen TT. Minimize renewable distributed generator costs while achieving high levels of system uniformity and voltage regulation. Ain Shams Engineering Journal. 2024;15(6):102720.
- 8. Adefarati T, Bansal RC. Integration of renewable distributed generators into the distribution system: a review. IET Renewable Power Gen. 2016;10(7):873–84.
- 9. Grisales-Noreña LF, Gonzalez Montoya D, Ramos-Paja CA. Optimal sizing and location of distributed generators based on PBIL and PSO techniques. Energies. 2018;11(4):1018.
- 10. Pham LH, Phan TT, Nguyen VTN, Phan KDT, Nguyen PH. Optimizing the efficiency of photovoltaic distributed generation in the distribution system. J ADV ENG COMPUT. 2024;8(1).
- 11. Mohanty A, Babu P. Fuzzy based optimal network reconfiguration of distribution system with electric vehicle charging stations, distributed generation, and shunt capacitors. AEEE. 2023;21(2).
- 12.
Mahesh K, Nallagownden PA, Elamvazuthi IA. Optimal placement and sizing of DG in distribution system using accelerated PSO for power loss minimization. In: 2015 IEEE Conference on Energy Conversion (CENCON), 2015. 193–8. https://doi.org/10.1109/cencon.2015.7409538
- 13. Kansal S, Kumar V, Tyagi B. Hybrid approach for optimal placement of multiple DGs of multiple types in distribution networks. International Journal of Electrical Power & Energy Systems. 2016;75:226–35.
- 14.
Tolba MA, Tulsky VN, Zaki Diab AA. Optimal sitting and sizing of renewable distributed generations in distribution networks using a hybrid PSOGSA optimization algorithm. In: 2017 IEEE International Conference on Environment and Electrical Engineering and 2017 IEEE Industrial and Commercial Power Systems Europe (EEEIC / I&CPS Europe), 2017. 1–7. https://doi.org/10.1109/eeeic.2017.7977441
- 15.
Nagaballi S, Bhosale RR, Kale VS. A Hybrid Fuzzy and PSO based Optimum Placement and Sizing of DG in Radial Distribution System. In: 2018 International Conference on Smart Electric Drives and Power System (ICSEDPS), 2018. 272–5. https://doi.org/10.1109/icsedps.2018.8536057
- 16. Abu-Mouti FS, El-Hawary ME. Optimal distributed generation allocation and sizing in distribution systems via artificial bee colony algorithm. IEEE Trans Power Delivery. 2011;26(4):2090–101.
- 17. Al-Ammar EA, Farzana K, Waqar A, Aamir M, Ul Haq A, et al. ABC algorithm based optimal sizing and placement of DGs in distribution networks considering multiple objectives. Ain Shams Engineering Journal. 2021;12(1):697–708.
- 18.
Biswas S, Chatterjee A, Goswami SK. An artificial bee colony based optimal placement and sizing of distributed generation. In: Proceedings of The 2014 International Conference on Control, Instrumentation, Energy and Communication (CIEC), 2014. 356–60. https://doi.org/10.1109/ciec.2014.6959109
- 19. Mohandas N, Balamurugan R, Lakshminarasimman L. Optimal location and sizing of multiple dgs to enhance the voltage stability in the distribution system using a chaotic ABC algorithm. IJCA. 2015;128(2):10–26.
- 20. Duong M, Pham T, Nguyen T, Doan A, Tran H. Determination of optimal location and sizing of solar photovoltaic distribution generation units in radial distribution systems. Energies. 2019;12(1):174.
- 21. Ghaffarzadeh N, Sadeghi H. A new efficient BBO based method for simultaneous placement of inverter-based DG units and capacitors considering harmonic limits. International Journal of Electrical Power & Energy Systems. 2016;80:37–45.
- 22. Sambaiah KS, Jayabarathi T. Optimal allocation of renewable distributed generation and capacitor banks in distribution systems using salp swarm algorithm. International Journal of Renewable Energy Research. 2017;9(1):96–107.
- 23. Hachemi A, Sadaoui F, Arif S. Optimal location and sizing of capacitor banks in distribution systems using grey wolf optimization algorithm. Lecture Notes in Networks and Systems. Springer International Publishing. 2023. 719–28.
- 24. Henrique LF, Silva WN, Silva CCA, Dias BH, Oliveira LW, Almeida MC. Optimal siting and sizing of distributed energy resources in a Smart Campus. Electric Power Systems Research. 2023;217:109095.
- 25. Murty VVVSN, Kumar A. Optimal DG integration and network reconfiguration in microgrid system with realistic time varying load model using hybrid optimisation. IET Smart Grid. 2019;2(2):192–202.
- 26. Ahmed AJ, Alkhafaji MH, Mahdi AJ. Performance enhancement of a low-voltage microgrid by measuring the optimal size and location of distributed generation. ACTA IMEKO. 2022;11(3):1.
- 27. Hakimi SM, Hasankhani A, Shafie‐khah M, Catalão JPS. Optimal sizing and siting of smart microgrid components under high renewables penetration considering demand response. IET Renewable Power Gen. 2019;13(10):1809–22.
- 28.
Pierezan J, Coelho LDS. Coyote optimization algorithm: a new metaheuristic for global optimization problems. In: 2018 IEEE Congress on Evolutionary Computation (CEC), 2018. 1–8. https://doi.org/10.1109/CEC.2018.8477769
- 29. Mekhmoukh Taleb S, Meraihi Y, Gabis AB, Mirjalili S, Zaguia A, Ramdane-Cherif A. Solving the mesh router nodes placement in wireless mesh networks using coyote optimization algorithm. IEEE Access. 2022;10:52744–59.
- 30. Chin VJ, Salam Z. Coyote optimization algorithm for the parameter extraction of photovoltaic cells. Solar Energy. 2019;194:656–70.
- 31. Chang GW, Cong Chinh N. Coyote optimization algorithm-based approach for strategic planning of photovoltaic distributed generation. IEEE Access. 2020;8:36180–90.
- 32. Petchrompo S, Wannakrairot A, Parlikad AK. Pruning pareto optimal solutions for multi-objective portfolio asset management. European Journal of Operational Research. 2022;297(1):203–20.
- 33. Gampa SR, Das D. Optimum placement and sizing of DGs considering average hourly variations of load. International Journal of Electrical Power & Energy Systems. 2015;66:25–40.
- 34. Biswas PP, Suganthan PN, Amaratunga GAJ. Optimal power flow solutions incorporating stochastic wind and solar power. Energy Conversion and Management. 2017;148:1194–207.
- 35. HassanzadehFard H, Jalilian A. Optimal sizing and location of renewable energy based DG units in distribution systems considering load growth. International Journal of Electrical Power & Energy Systems. 2018;101:356–70.
- 36. Hung DQ, Mithulananthan N, Lee KY. Optimal placement of dispatchable and nondispatchable renewable DG units in distribution networks for minimizing energy loss. International Journal of Electrical Power & Energy Systems. 2014;55:179–86.
- 37. Oda ES, Hamed AMAE, Ali A, Elbaset AA, Sattar MAE, Ebeed M. Stochastic optimal planning of distribution system considering integrated photovoltaic-based DG and DSTATCOM under uncertainties of loads and solar irradiance. IEEE Access. 2021;9:26541–55.
- 38. Mahmoud K, Yorino N, Ahmed A. Optimal distributed generation allocation in distribution systems for loss minimization. IEEE Trans Power Syst. 2016;31(2):960–9.
- 39. Sanjay R, Jayabarathi T, Raghunathan T, Ramesh V, Mithulananthan N. Optimal allocation of distributed generation using hybrid grey wolf optimizer. IEEE Access. 2017;5:14807–18.
- 40. Pandi VR, Zeineldin HH, Xiao W. Determining optimal location and size of distributed generation resources considering harmonic and protection coordination limits. IEEE Trans Power Syst. 2013;28(2):1245–54.
- 41. Hung DQ, Mithulananthan N, Lee KY. Determining PV penetration for distribution systems with time-varying load models. IEEE Trans Power Syst. 2014;29(6):3048–57.
- 42. Hashem M, Abdel-Salam M, El-Mohandes MTh, Nayel M, Ebeed M. Optimal placement and sizing of wind turbine generators and superconducting magnetic energy storages in a distribution system. Journal of Energy Storage. 2021;38:102497.
- 43. Ghorbani MJ, Mokhtari H. Impact of harmonics on power quality and losses in power distribution systems. IJECE. 2015;5(1):166.
- 44. Atwa YM, El-Saadany EF, Salama MMA, Seethapathy R. Optimal renewable resources mix for distribution system energy loss minimization. IEEE Trans Power Syst. 2010;25(1):360–70.
- 45. Liu Z, Wen F, Ledwich G. Optimal siting and sizing of distributed generators in distribution systems considering uncertainties. IEEE Trans Power Delivery. 2011;26(4):2541–51.
- 46. Mahmood FH, Resen AK, Khamees AB. Wind characteristic analysis based on Weibull distribution of Al-Salman site, Iraq. Energy Reports. 2020;6:79–87.
- 47. Biswas PP, Suganthan PN, Mallipeddi R, Amaratunga GAJ. Optimal reactive power dispatch with uncertainties in load demand and renewable energy sources adopting scenario-based approach. Applied Soft Computing. 2019;75:616–32.
- 48. Kien LC, Van Hien T, Ngoc Tram HD, Pham TD. Optimal integration of renewable energy–based distributed generation units in radial distribution system. International Transactions on Electrical Energy Systems. 2025;2025(1).
- 49. Soroudi A, Aien M, Ehsan M. A probabilistic modeling of photo voltaic modules and wind power generation impact on distribution networks. IEEE Systems Journal. 2012;6(2):254–9.
- 50. Chakraborty S, Verma S, Salgotra A, Elavarasan RM, Elangovan D, Mihet-Popa L. Solar-based DG allocation using harris hawks optimization while considering practical aspects. Energies. 2021;14(16):5206.
- 51. Venkatasatish R, Chittathuru D. Coyote optimization algorithm-based energy management strategy for fuel cell hybrid power systems. Sustainability. 2023;15(12):9638.
- 52. Zhang Q, Bu X, Zhan Z-H, Li J, Zhang H. An efficient optimization state-based coyote optimization algorithm and its applications. Applied Soft Computing. 2023;147:110827.
- 53. Abdallah EM, El Sayed MI, Elgazzar MM, Hassan AA. Coyote multi-objective optimization algorithm for optimal location and sizing of renewable distributed generators. IJECE. 2021;11(2):975.
- 54. Teng J-H, Chang C-Y. Backward/forward sweep-based harmonic analysis method for distribution systems. IEEE Trans Power Delivery. 2007;22(3):1665–72.
- 55. Faramarzi A, Heidarinejad M, Stephens B, Mirjalili S. Equilibrium optimizer: a novel optimization algorithm. Knowledge-Based Systems. 2020;191:105190.
- 56. Qais MH, Hasanien HM, Alghuwainem S. Transient search optimization: a new meta-heuristic optimization algorithm. Appl Intell. 2020;50(11):3926–41.
- 57. Li S, Chen H, Wang M, Heidari AA, Mirjalili S. Slime mould algorithm: a new method for stochastic optimization. Future Generation Computer Systems. 2020;111:300–23.
- 58. Dehghani M, Hubalovsky S, Trojovsky P. Northern goshawk optimization: a new swarm-based algorithm for solving optimization problems. IEEE Access. 2021;9:162059–80.
- 59. Zou K, Agalgaonkar AP, Muttaqi KM, Perera S. Distribution system planning with incorporating DG reactive capability and system uncertainties. IEEE Trans Sustain Energy. 2012;3(1):112–23.
- 60.
POWER Data Access Viewer v2.0.0. https://power.larc.nasa.gov/data-access-viewer/
- 61.
Norvento nED100. https://www.norvento.com/en/new-ned100/. 2023.
- 62. Hsu C-T, Korimara R, Cheng T-J. Power quality analysis for the distribution systems with a wind power generation system. Computers & Electrical Engineering. 2016;54:131–6.
- 63. Seddik MS, Eteiba MB, Shazly J. Evaluating the harmonic effects on the thermal performance of a power transformer. Energies. 2024;17(19):4871.
- 64. Pejovski D, Najdenkoski K, Digalovski M. Impact of different harmonic loads on distribution transformers. Procedia Engineering. 2017;202:76–87.
- 65. Masoum MAS, Fuchs EF. Interaction of harmonics with capacitors. Power Quality in Power Systems and Electrical Machines. Elsevier. 2015. 429–88.
- 66.
Harmonic spectrum. https://github.com/tshort/OpenDSS/blob/master/Test/indmach%20test/Spectrum.DSS. Accessed 2023 October 1.
- 67. Meena NK, Swarnkar A, Gupta N, Niazi KR. Multi‐objective Taguchi approach for optimal DG integration in distribution systems. IET Generation Trans & Dist. 2017;11(9):2418–28.
- 68. Daneshvar M, Babaei E. Exchange market algorithm for multiple DG placement and sizing in a radial distribution system. Journal of Energy Management and Technology. 2018;2(1):54–65.
- 69. El-Ela AAA, El-Sehiemy RA, Abbas AS. Optimal placement and sizing of distributed generation and capacitor banks in distribution systems using water cycle algorithm. IEEE Systems Journal. 2018;12(4):3629–36.
- 70. Sambaiah KS, Jayabarathi T. Optimal allocation of renewable distributed generation and capacitor banks in distribution systems using salp swarm algorithm. International Journal of Renewable Energy Research. 2019;9(1):96–107.
- 71. Selim A, Kamel S, Jurado F. Efficient optimization technique for multiple DG allocation in distribution networks. Applied Soft Computing. 2020;86:105938.
- 72. Duong TL, Nguyen PT, Vo ND, Le MP. A newly effective method to maximize power loss reduction in distribution networks with highly penetrated distributed generations. Ain Shams Engineering Journal. 2021;12(2):1787–808.
- 73. Subbaramaiah K, Sujatha P. Optimal DG unit placement in distribution networks by multi-objective whale optimization algorithm & its techno-economic analysis. Electric Power Systems Research. 2023;214:108869.
- 74. Le MH, Pham TD, Nguyen TT. Optimal economic analysis of electric vehicle charging stations, renewable energy technologies, and capacitor banks in distribution networks. IET Generation Trans & Dist. 2025;19(1).
- 75. Prasad KRKV, Kollu R, Ramkumar A, Ramesh A. A multi-objective strategy for optimal DG and capacitors placement to improve technical, economic, and environmental benefits. International Journal of Electrical Power & Energy Systems. 2025;165:110491.
- 76. Bhadoriya JS, Gupta AR. A novel transient search optimization for optimal allocation of multiple distributed generator in the radial electrical distribution network. International Journal of Emerging Electric Power Systems. 2021;23(1):23–45.