The PLOS One Editors issue this Editorial Note because this article [1] was identified as one of a series of submissions for which we have concerns related to the peer review process. Readers are encouraged to approach the article [1] with careful consideration. In following up on this matter, PLOS did not evaluate the article’s integrity or scientific validity.
The Editors do not have concerns regarding the authors’ conduct during the peer review process.
Reference
Citation: The PLOS One Editors (2026) Editorial Note: Multi-objective optimization of dual resource integrated scheduling problem of production equipment and RGVs considering conflict-free routing. PLoS One 21(7): e0353811. https://doi.org/10.1371/journal.pone.0353811
Published: July 15, 2026
Copyright: © 2026 The PLOS One Editors. This is an open access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.