Abstract
With the increasing demand for electricity load in China, orderly power utilization are important measures to alleviate electricity shortages during peak periods. This article establishes a multi-objective optimization model for orderly power utilization in active distribution networks is established, with the optimization objectives of minimizing the total operation cost, minimizing the cost for users, and minimizing the load fluctuation of the system. This model contains a large number of integer variables and nonlinear constraints, which is difficult to solve. To reduce computation time, convex relaxation techniques are adopted to transform the original model into a mixed-integer second-order cone programming (MISOCP) model, which has lower computational complexity. Furthermore, The improved ε-constraint method is proposed to solve the model, which can directly and quickly find the compromise optimal solution of the multi-objective problem. By using simplex search algorithm, the proposed method dose not need to traverse all grid points, which can significantly reduce computation time. Finally, case study on the the IEEE-33 bus distribution network demonstrate the effectiveness of the proposed method.
Citation: Wen X, Li H, Wu X, Li Y, Siliang L, Huang G (2024) Multi-objective optimal decision for orderly power utilization based on improved ε-constraint method in active distribution networks. PLoS ONE 19(10): e0309437. https://doi.org/10.1371/journal.pone.0309437
Editor: Emanuele Crisostomi, Università di Pisa, ITALY
Received: December 18, 2023; Accepted: August 12, 2024; Published: October 24, 2024
Copyright: © 2024 Wen et al. This is an open access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.
Data Availability: All relevant data are within the paper and its Supporting information.
Funding: This research received funding Science and Technology Project of China Southern Power Grid Corporation (GZHKJXM20210056 (080036KK52210003)).The funders play an important role in study design and decision to publish.
Competing interests: The authors have declared that no competing interests exist.
1 Introduction
With China’s economic development, the electricity load is growing rapidly [1]. When power supply is insufficient, the impact of power shortage on national economic life can be minimized through the implementation of orderly power utilization and the adoption of administrative measures, economic means or technical methods to maintain the balance of power supply and utilization [2]. Demand response [3] can be used as an auxiliary means to promote the balance between power supply and demand, but it cannot ensure the response to the power load gap during peak periods. Therefore, it is of great practical significance and application value to study the decision-making method of orderly power utilization.
At present, there have been numerous scholars to carry out research on the decision-making of orderly power utilization. Peng et al. [4] establish the objective function by summing up the compensation cost for orderly power utilization methods and the cost associated with network loss penalties. By incorporating the network loss penalty term, they prioritize the utilization of power sources during the decision-making process for orderly power utilization. Zhang et al. [5] formulate a decision-making model for orderly power utilization, which coordinates both weekly and daily time scales. The objective of this model is to minimize the combined cost of peak avoidance and the penalty associated with fluctuations in peak and valley loads. The above literature are all single objective optimization model, both of them only consider the control operation cost of orderly power utilization, but not the impact of orderly power utilization measures on users. Contrasting the single objective optimization model, the multi-objective optimization model offers numerous non-dominated solutions, also known as the Pareto optimal solutions. The decision-maker need carefully choose a compromise optimal solution from among these Pareto optimal solutions. The approaches to solving the multi-objective optimization model can be categorized into heuristic optimization methods [6, 7] and traditional optimization techniques [8, 9]. Heuristic optimization methods offer the flexibility of directly solving the model without the limitations on its characteristics. Nevertheless, their computational inefficiency renders them impractical for real-world distribution networks. As for the traditional optimization methods, they mainly include the weighted sum method and the ε-constraint method. When using traditional optimization methods, there are usually restrictions on the type of model, and it is necessary to perform convex relaxation on the model. Wang et al. [8] propose a multi-objective optimization decision model for orderly power utilization and adopt the weighted sum method to solve the proposed model. The model aims at taking maximizing the grid load rate and maximizing the energy efficiency of power utilization. Paterakis et al. [9] adopt the ε-constraint method to solve a multi-objective optimization model, which aims to determine the optimal energy and reserve volumes considering the joint energy and reserve day-ahead market. The ε-constraint method divides the range of values of εi into q-equal segments and generates distributed grid points. By traversing all grid points, the set of Pareto optimal solutions can be obtained. As the value of q increases, there will be more grid points, which will seriously affects the computation efficiency.
In summary, this paper makes two contribution: 1) A multi-objective optimization model for orderly power utilization in active distribution networks with the optimization objectives of minimizing the total operation cost, minimizing the cost for users, and minimizing the load fluctuation of the system. For the nonlinear constraints in the model, convex relaxation techniques are adopted to transform the original model into a mixed-integer second-order cone programming (MISOCP) model, which has lower computational complexity. 2) The improved ε-constraint method is proposed to solve the model, which can directly and quickly find the compromise optimal solution of the multi-objective problem. Compared to the traditional ε-constraint method, the proposed method dose not need to traverse all grid points by using simplex search method, which can significantly reduce computation time.
2 Problem formulation
Means of orderly electricity use include peak transferring, peak shifting, peak clipping, and power cut. Peak transferring refers to transferring the total power load of users during a period by advancing or lagging time.The starting time of peak transferring is unset, and the advancing or lagging time should be less than the maximum allowed time of peak transferring. Peak shifting refers to shifting part of the power load of users from the peak period to the valley period, and the time of peak period and valley period is set. Peak clipping refers to restricting part of the user’s load during the peak period. Power cut forces the power supply to be stopped when the other means are exhausted and the generation and use of electricity are still unbalanced. Due to the serious impact of power cut on national economy and people’s well being, this paper does not consider this measure. Considering the impact on users’ electricity consumption behavior, peak transferring only requires appropriate adjustment of the time of electricity consumption, without reducing electricity consumption. Peak shifting requires adjustment of the power utilization plan within a day, without reducing electricity consumption. But peak clipping requires reduction in electricity consumption.
In summary, this paper considers the order of invocation of the decision-making tools for orderly power use as: peak transferring, peak shifting, and peak clipping. In this paper, the graded peak transferring and graded peak shifting are considered. Each user can participate in different grades of peak shifting, and graded peak clipping is an integer multiple of the amount of peak clipping in a single grade. At the same time, considering the distributed renewable energy field stations and energy storage power stations in the active distribution network, the system load transfer is coordinated and the wind and light resources are better absorbed by reasonably formulating the charging and discharging plan of the energy storage power stations.
2.1 Objective function
2.1.1 Minimizing total operation cost.
The total operating cost of the distribution network includes the compensation cost for orderly power utilization, the renewable energy curtailment penalty cost and the operating cost of the energy storage. Among them, the compensation cost for orderly power utilization can be further divided into the compensation cost for peak transferring, peak shifting, and peak clipping, as shown below:
(1)
Where, the subscript i denotes the user number connected to bus i. N and T are the total number of system buses and time periods. Ctrans,i, Cshift,i and Cclip,i are the peak transferring, peak shifting and peak clipping compensation cost for user i, respectively. CRES,t is the penalty cost for system renewable energy curtailment at time t, and CES,t is the operation cost of the energy storage station at time t.
The specific formula for each item in Eq (1) is given below:
(2)
Where, λtrans is the compensation cost coefficient of peak transferring per unit time period, in yuan/h.
is a 0–1 variable, and when it takes the value of 1, it means that user i peak transferring h hours. If the values of h is positive, it means that the power utilization time is advanced. If not, it means that the power utilization time is lagging. hmax,i is the maximum allowed time of peak transferring for user i.
(3)
Where, λshift is the compensation cost coefficient of peak shifting per unit time period, in yuan/MW·h. Si is the total number of peak shifting that the i-th user can participate in. ushift i,β is a 0–1 variable, and when it takes the value of 1, it means that the i-th user participates in the β-th peak shifting.
is the load correction corresponding to the β-th peak shift of user i at time t. Since the absolute value of positive and negative corrections of peak and valley shifts in a day are equal, the actual peak shifting is the sum of the absolute value of load corrections in each time period divided by two.
(4)
Where, λclip is the compensation coefficient of peak clipping per unit time period, in yuan/MW·h. Ci is the number of stages in which user i participates in peak clipping, and ΔPclip i,t is the amount of single-stage load modification in which user i participates in peak clipping at time t.
(5)
Where, λRES is the penalty cost coefficient of renewable energy curtailment, in yuan/MW·h. Ns and Nw are the total number of photovoltaic power stations and wind farms, respectively. Psf,i,t and Pwf,i,t are the predicted active output of photovoltaic power stations and wind farms at time t, respectively. And Ps,i,t and Pw,i,t are the scheduled output of photovoltaic power stations and wind farms at time t, respectively. The predicted output is always larger than the scheduled output, and the difference between them is the amount of renewable energy curtailment.
(6)
Where, λES is the charging and discharging operation cost coefficient of the energy storage station, in yuan/MW·h. Pc,i,t and Pd,i,t are the charging active power and discharging active power of the energy storage plant at moment t, respectively.
2.1.2 Minimizing the cost for users.
The cost of electricity to the user is the sum of the cost of electricity purchased by all users of the system, as shown in the following equation:
(7)
Where, cgrid,t is the time-of-day tariff. PLi,t is the actual load value of user i in time period t, as shown in the following equation:
(8)
Where, PLi,t,0 is the initial load value of user i at time t.
,
and
are the load corrections for peak transferring, peak shifting and peak clipping for user i at time t, respectively.
2.1.3 Minimizing system load standard deviation.
For the load fluctuation of the distribution network, the standard deviation of load active power can be expressed. The system load standard deviation reflects the smoothness of the load active power [10]. In order to alleviate the system peak load demand and reduce the peak-valley difference, the system load standard deviation should be minimized, and its calculation equation is shown below:
(9)
2.2 Objective function
2.2.1 Power flow equations.
The AC current equation is used to describe the power balance constraints at each bus in the distribution network as shown in the following equation:
(10)
Where, PRES,t and QRES,t are the active and reactive power of the renewable energy field station at time t, respectively. QLi,t is the reactive load of bus i at time t, PES,t is the active power of the energy storage power station at time t. Vi,t is the voltage amplitude of bus i at time t. Gij and Bij are the mutual conductance/susceptance between buses i and j, respectively. θij,t is the voltage phase difference between buses i and j at time t. If bus i is connected to a renewable energy station or an energy storage station, the formulas for PRES,t, QRES,t and PES,t in Eq (10) are shown in Eq (11). Otherwise, they take the value of 0.
(11)
Where, Qs,i,t and Qw,i,t are the scheduled reactive power output of the PV plant and wind farm at time t, respectively.
2.2.2 Constraints of renewable energy station operation.
The operation constraints of renewable energy station are shown in Eqs (12) and (13). Assume that the wind farm operate in the constant power factor mode.
(12)
(13)
Where, Ss,i is the apparent power of the photovoltaic power station. φs,i and φw,i are the power factor angles of photovoltaic power station and wind farm, respectively.
2.2.3 Constraints of energy storage operation.
When the energy storage power station is in operation, the charging and discharging power must be smaller than its maximum operating power. Also, charging and discharging cannot be carried out at the same time, and the remaining power should be within the specified power range.
(14)
Where, PES,max is the maximum operating power of the energy storage plant. Ei,t is the remaining power of the energy storage plant at time t. ηc and ηd are the charging and discharging efficiencies of the energy storage plant, respectively. Emax is the maximum storage power of the energy storage plant. SOCmin and SOCmax are the minimum and maximum values of the charging state, respectively.
2.2.4 Constraints of peak transferring.
For all users, the number of hours participating in peak transferring in a day is unique. In particular, when , it means that the user has 0 hour of time peak transferring.
2.2.5 Constraints of peak shifting.
Where, ushift i,0 is a 0–1 variable that, when taking the value of 1, indicates that user i participates in peak shifting and when taking the value of 0, indicates that user i does not participate in peak shifting.
2.3 Convex relaxation of the model
The above equations constitute a multi-objective optimization model for orderly power utilization in active distribution networks. The model contains a large number of 0–1 variables, and there are nonlinear terms in Eq (10) and the third constraint in Eq (14). Therefore, the model is a mixed integer nonlinear programming, which is complex and takes a long time to solve. In order to improve the computer efficiency, the non-convex constraints in the model are subjected to convex relaxation.
For Eq (10), the second order cone convex relaxation method [11] is used. Introduce variables Rij,t = Vi,tVj,tcosθij,t, Tij,t = Vi,tVj,tsinθij,t, Ui,t = V2 i,t, and then Eq (10) can be transformed into Eq (19).
For the third constraint in Eq (14), it can be linearized by using the big M method [12] and transformed into Eq (20) as follows:
(20)
Where, M is a large constant and ζi,t are auxiliary binary variables introduced by the big M method.
After performing the convex relaxation process, the model is transformed into a mixed-integer second-order cone programming. For descriptive convenience, the model is expressed in the compact form shown in Eq (21).
(21)
Where, x denotes all the variables in the model. g(x) and h(x) denote the equation constraints and inequality constraints in the model, respectively.
3 Model solution
The ε-constraint method is a multi-objective optimization algorithm [13], also known as the main objective method. Its main idea is to select a main objective function, and transform the rest of the objective functions into constraints, and the multi-objective optimization problem is transformed into a single-objective optimization problem.
3.1 Main objective selection
The objectives in a multi-objective optimization problem are usually in conflict with each other and cannot reach the optimum at the same time. In order to make the resulting Pareto solution set more uniformly distributed, one of the most conflicting objectives can be selected as the main objective [14]. In this paper, the Pearson correlation coefficient is used to calculate the relationship between the objective functions, and the value of Pearson correlation coefficient is in the range of [-1,1], and when its value is closer to -1, it indicates that the negative correlation between the two objective functions is stronger [15], i.e., the conflict is stronger.
First, single-objective optimization is performed for each objective and the corresponding optimal solution xn*, n = 1,2,3. At this time, xn* is substituted into the other objective functions, and the payment matrix can be obtained, as shown in Eq (22). Next, the Pearson correlation coefficients between any two objective functions are calculated by Eq (23), and for the three-objective optimization problem, it is obvious that two Pearson correlation coefficients exist for each objective function. Finally, the objective function with the smallest sum of Pearson correlation coefficients is selected as the main objective function, when the main objective function is conflict with the other two objectives.
(22)
(23)
Where, ρfi,fj denotes the Pearson correlation coefficient of the objective function fi and fj, and
and
are the average values of the different optimal solutions xn* corresponding to the objective function fi and fj, which can be calculated by Eqs (24) and (25), respectively.
3.2 Improved ε-constraint method
After determining the main objective function, the rest of the objective functions can then be transformed into constraints. For the sake of illustration, f1 is selected as the main objective function. Based on the ε-constraint method, the original model Eq (21) can be transformed into a single objective optimization model as follows:
(26)
Where, εi is the upper bound of each objective function fi(x) except the main objective function. The range of values of εi can be determined by solving min fi(x) and max fi(x) to obtain fimin and fimax. The traditional ε-constraint method divides the range of values of εi into q-equal segments, resulting in uniformly distributed grid points, as shown in Fig 1. Each grid point corresponds to a set of values of εi, and solving Eq (26) at different values of εi can obtain the corresponding Pareto solution. By traversing all the uniformly distributed grid points, the set of Pareto solutions can be obtained, from which a solution is selected as the compromise optimal solution of the multi-objective optimization problem.
Obviously, as the value of q increases, the number of the grid points will increase rapidly, and the comprehensive optimization degree of the selected compromise optimal solution is higher. However, the increasing number of the grid points will seriously affect the computation efficiency. To address this problem, this paper proposes an improved ε-constraint method to transform the original model Eq (21) into the two-layer optimization model shown in Eq (27).
In the inner layer optimization model, auxiliary variables μ2 and μ3 are introduced and satisfy μ2, μ3∈[0,1], then the values of ε2 and ε3 can be uniquely determined by μ2 and μ3. Each time the inner layer optimization model is solved, the Pareto solution corresponding to a certain set of auxiliary variables (μ2, μ3) is obtained and this solution is transferred to the outer layer optimization model. In the outer layer optimization model, each objective function is normalized to avoid the influence caused by the value range, as shown in Eq (28). Since the three objectives cannot achieve the optimal value at the same time, the Utopia point is an unattainable ideal optimal solution. If the Euclidean distance between a solution and the Utopia point is smaller than other solutions, it can be considered as the highest degree of comprehensive optimal solution. Therefore, the objective function of the outer optimization model is to find a set of (μ2, μ3) that minimizes the Euclidean distance between the corresponding Pareto solution and the Utopia point (f1min,f2min,f3min). In this paper, a simplex search algorithm [16] is used to directly search for the optimal set of (μ2, μ3) within the range of values of μ2 and μ3. By solving the two-layer optimization model, the comprehensive optimal solution can be obtained directly, and it is no longer necessary to traverse every grid points. Therefore, the computation efficiency of the proposed method is significantly improved.
The simplex search algorithm was proposed by mathematicians J.A.Nelder and R.Mead, and its solution idea is as follows: let the optimization problem contain n independent variables, firstly, select n+1 points in the feasible solution space to form the initial simplex, then solve the objective function value corresponding to each point of the simplex and sort, and then get the better points in the feasible solution space through reflection and contraction methods to replace the worst points in the initial simplex, and then get the new simplex. The worst point in the feasible solution space is obtained by reflection and contraction, and the new simplex is obtained. By repeating the above process, the simplex is transferred, deformed and shrunk, and gradually approaches the optimal point. The iterative process of the algorithm ends when the difference between the objective function values of the points in the simplex is less than the set value, and the optimal point of the simplex is then taken as the optimal solution.
The flowchart of the algorithm is shown in Fig 2 with the following steps:
- Step 1: Generate the initial simplex. Considering that the outer optimization model contains two independent variables, μ2 and μ3, three points Xj(μ2,μ3) in the feasible solution space are selected, j = 1,2,3. Substituting and solving the inner optimization model, the Euclidean distances, d(Xj), from the Pareto solution to the Utopia point corresponding to each initial point are obtained, and the initial simplex is generated.
- Step 2: Convergence judgment of iteration. According to the Euclidean distance d(Xj) to rank, determine the optimal point XL, the next best point XG and the worst point XH. Calculate the root mean square error of the Euclidean distance corresponding to each point in the simplex, as shown in Eq (29). If the RMSE is less than the set accuracy τ, the iteration ends, and the Pareto solution corresponding to the optimal point XL at this point is taken as the compromise optimal solution. Otherwise, go to Step 3.
(29)
- Step 3: Calculate the reflection center XC. Calculate the form center of the remaining points in the simplex, except the worst point, as the reflection center XC according to Eq (30). In general, the direction of the worst point XH pointing to the reflection center XC is considered to be the direction in which the objective function is more optimal.
(30)
- Step 4: Calculate the reflection point XR. Calculate the reflection point XR according to the reflection Eq (31) and check whether it is within the feasible solution space, i.e., whether it satisfies μ2, μ3∈[0,1]. If it is not in the feasible solution space, recalculate it according to the contraction Eq (32) until a reflection point XR in the feasible solution space is obtained.
(31)
(32)
- Step 5: Generate a new simplex. Calculate d(XR) corresponding to the reflection point XR and compare d(XR) with d(XH) corresponding to the worst point XH. If d(XR) > d(XH), return to Step 4 and calculate the new reflection point according to the contraction Eq (32). If d(XR) < d(XH), replace the worst point XH of the original simplex with the reflection point XR to form the new simplex and return to Step 2.
4 Case study
4.1 Parameters of the case study
The IEEE-33 bus system is used to demonstrate the effectiveness of the proposed method, as shown in Fig 3. The line parameters are shown in the S1 Table of S1 File [17]. The used computer is a PC with an Intel(R) Core(TM) i7-12700 and 32GB of RAM, and the computing platforms are MATLAB 2018b and Gurobi 9.0.2. Bus 18 and bus 30 are connected to photovoltaic power plant and wind farm, and the maximum active output is 6MW and 8MW, respectively. The predicted value of active output is shown in Fig 4. Bus 24 and bus 30 are connected to the energy storage station, and the capacity is 2.5 MW·h. The distribution network is connected to the main grid from bus 1, and by adjusting the power injected from the main grid to the distribution network, the results of the schedule of orderly power utilization can be analyzed under different power gaps. The active load pattern of each user is taken from eight typical load curves in the S2 Table of S1 File [18]. The participation of each user in orderly power utilization is shown in Table 1. To ensure the order of the measures of orderly power utilization, the compensation cost coefficient of peak transferring, peak shifting, peak clipping are set as λtrans = 300 yuan/h, λshift = 500 yuan/MW·h, λclip = 700 yuan/MW·h. The penalty cost coefficient of renewable energy curtailment is set as λRES = 200 yuan/MW·h. And the charging and discharging operation cost coefficient of the energy storage station is set as λES = 150 yuan/MW·h.
4.2 Multi-objective optimization for orderly power utilization
Considering that there is a 10% power gap in the distribution network at the peak of power utilization, a multi-objective optimization model is carried out. First, single objective optimization is carried out for three objective functions respectively, as shown in Table 2. Calculating the Pearson correlation coefficients between each objective and other objectives, the values of ρf1,f2, ρf1,f3 and ρf2,f3 are -0.94, -0.63 and 0.33, respectively. It can be seen that the Pearson correlation coefficients between f1 and f2, and between f1 and f3 are closer to -1, so f1 is selected as the main objective.
Next, the proposed improved ε-constraint method is used to solve the multi-objective optimization model, and the values of each objective function of the resulting compromised optimal solution are 58.36×103yuan, 33.62×104yuan, and 12.51×103MW, respectively. Compared with the results in Table 2, it can be seen that the compromised optimal solution is closer to the single-objective optimal value of each objective, and it is a comprehensively optimized solution with a higher degree of optimization. By solving the proposed multi-objective optimization, an orderly power utilization schedule can be obtained. This schedule simultaneously reduces the total operation cost and the cost for users, which can improve the economic benefits of the system operation. Moreover, it reduces the fluctuation of system load in the distribution network and enhances the operation security of the system.
4.3 Comparison of different multi-objective optimization methods
To illustrate the effectiveness of the proposed algorithm, it is compared with the traditional ε-constraint method. In this case, the traditional ε-constraint method is divided into 10 equal parts, 20 equal parts, and 40 equal parts for the range of values of each objective, which corresponds to the need to solve 121 (11 × 11), 441 (21 × 21), and 1681 (41 × 41) grid points, respectively. Solving Eq (26) yields a Pareto solution corresponding to a grid point, and the set of Pareto solutions can be obtained by traversing all the grid points, and then the solution with the smallest distance from the utopia point is selected from the solution set as the compromise optimal solution. The computational results are shown in Table 3.
It can be seen that for the traditional ε-constraint method, the number of solutions in the Pareto solution set increases significantly as the number of equal parts increases. Although the obtained compromise optimal solution has higher degree of comprehensive optimization, the computation time also increases significantly. Compared with the traditional ε-constraint method, the CPU time of the improved ε-constraint method is smaller. Based on several initial points, the proposed method generates the simplex in the feasible solution space and obtain the compromise optimal solution, which avoids solving a large number of Pareto solutions corresponding to all the mesh points. Therefore, the computation efficiency can be significantly improved. In addition, compared with the traditional ε-constraint method, the value of each objective function is better and the distance d between the compromise optimal solution and the Utopia point is also smaller. This is because the direct search algorithm takes points continuously in the feasible solution space, while the traditional algorithm takes points discretely in a grid, which is easy to miss the more optimized solutions existing between the discrete points. In summary, the proposed method significantly reduces computation time while obtaining a better compromise optimal solution.
4.4 Analysis of orderly power utilization under different power shortages
In order to analyze the schedule of orderly power utilization under different power shortages, the proposed model are carried out by considering the existence of 5% and 15% power shortages in the peak period, as shown in Table 4.
It can be seen that when the power shortage is only 5%, all users of the system do not need to participate in peak clipping, but only through peak transferring and peak shifting. When the power shortage expands to 10%, the load adjustment caused by all kinds of orderly power utilization measures increases. Among them, the adjustment amount of peak shifting is larger than the adjustment amount of peak transferring. This is because in response to the power shortage, peak transferring is the first orderly use of electricity measures taken, and as the shortage increases, the space for users to adjust the peaking has been very small, so the adjustment amount of peak shifting is more varied. When the power shortage continues to expand to 15%, more users need to participate in peak clipping to achieve active power balance.
5 Conclusion
This paper establishes a multi-objective optimization model for orderly power utilization in active distribution networks. Convex relaxation techniques are adopted to transform the original model into a MISOCP model, and the improved ε-constraint method is proposed to solve the model efficiently. Compared with the traditional single objective optimization model, the solution of multi-objective optimization is a solution with a high degree of comprehensive optimization. Compared with the traditional ε-constraint method, the objective value of the proposed method has been improved by 15.9% and the computation time is significantly reduced by 92.4% in the case studies.
References
- 1.
Xinhua. Peak electricity consumption is approaching, and energy supply is in full swing [EB/OL]. 2022-06-08.
- 2.
National Development and Reform Commission. Circular of the National Development and Reform Commission on Measures for the Management of Orderly Electricity Consumption. [R]. Beijing: National Development and Reform Commission, 2011.
- 3. Zhukui TAN, Ming ZENG. Real time demand response theory based on load regulation capability model [J]. Southern Power System Technology, 2022,16(01):58–66.
- 4. Tingting LU, Ciwei GAO, Weihua SU, et al. Research on drafting of optimal peak averting planning for ordered power utilization [J]. Power System Technology, 2014, 38(09):2315–2321.
- 5. Bo PENG, Yiwei QIU, Junquan CHEN, et al. A comprehensive decision method for orderly power utilization considering network constraints [J]. Power System Technology, 2015,39(03):797–803.
- 6. Mingming ZHANG, Junquan CHEN, Ke WANG, et al. A centralized decision method for multi-time scale coordinated orderly power consumption [J]. Automation of Electric Power Systems, 2014,38(22):70–77.
- 7. Yan WANG, Jianxi LIU, Dewei HE, et al. Research of the intelligent decision system for orderly electricity use with multi⁃objective optimization [J]. Power Demand Side Management, 2015,17(03):16–20.
- 8. Qingguo YAN, Xing TONG, Ning ZHANG, et al. A dynamic multi-level temporal and spatial coordination method for orderly power [J]. Power System Technology, 2016,40(02):425–432.
- 9. Yining WANG, Jianyong DING, Shiming TIAN, et al. An Orderly Power Utilization Mode Based on Intelligent Multi-agent Apanage Management System [J]. Power System Technology, 2019,43(05):1802–1814.
- 10. Wei GONG, Junyong LIU, Xingqi HE, et al. Load restoration considering load fluctuation rate and load complementary coefficient [J].Power System Technology, 2014,38(09):2490–2496.
- 11. Xiaowen LAI, Xiaowei MA, Yang BAI, et al. Dynamic reactive power optimization method based on mixed integer second-order cone programming [J]. Automation of Electric Power Systems, 2017,41(17):37–42.
- 12.
Lee J., Leyffer S. Mixed integer nonlinear programming [M].Springer,2012.
- 13. Haimes Y. Integrated system identification and optimization [J]. Control and Dynamic System: Advances in Theory and Application, 1973, 10: 435–518.
- 14. Hui WU, Shunjiang LIN, Guansheng FAN, et al. Solution for multi-objective security constrained unit commitment with wind power [J]. Power System Technology, 2021,45(02):542–553.
- 15.
Yaoting ZHANG. Introduction to Multivariate Statistical Analysis [M]. Science Press,1982.
- 16. Nelder J., Mead R. A simplex method for function minimization [J]. The Computer Journal, 1965, 7(4):308–311
- 17. Tian Z., Wu W., Zhang B. A mixed integer quadratic programming model for topology identification in distribution network[J]. IEEE Transactions on Power Systems, 2016,31(1):823–824, 2016.
- 18. Yuteng HUANG, Fang HOU, Qin ZHOU, et al. A new combinational electrical load analysis method for demand side management[J]. Power System Protection and Control, 2013,41(13):20–25.