Figures
Abstract
Investigation reveals that a high percentage of incident causes are ascribed to some forms of human error. To effectively prevent incidents from happening, Human Reliability Analysis (HRA), as a structured way to represent unintentional operator contribution to system reliability, is a critical issue. Human Error Reduction and Assessment Technique (HEART) as a famous HRA technique, provides a straightforward method to estimate probabilities of human error based on the analysis of tasks. However, it faces varying levels of uncertainty in assigning of weights to each error producing condition (EPC), denoted as assessed proportion of affect (APOA), by experts. To overcome this limitation and consider the confidence level (reliability or credibility) of the experts, the current study aimed at proposing a composite HEART methodology for human error probability (HEP) assessment, which integrates HEART and Z-numbers short for, Z-HEART. The applicability and effectiveness of the Z-HEART has been illustrated in the de-energization power line as a case study. Furthermore, a sensitivity analysis is fulfilled to investigate the validity of the proposed methodology. It can be concluded that Z-HEART is feasible for assessing human error, and despite the methodological contributions, it offers many advantages for electricity distribution companies.
Citation: Aghaei H, Mirzaei Aliabadi M, Mollabahrami F, Najafi K (2021) Human reliability analysis in de-energization of power line using HEART in the context of Z-numbers. PLoS ONE 16(7): e0253827. https://doi.org/10.1371/journal.pone.0253827
Editor: Dragan Pamucar, University of Defence in Belgrade, SERBIA
Received: March 9, 2021; Accepted: June 10, 2021; Published: July 1, 2021
Copyright: © 2021 Aghaei et al. This is an open access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.
Data Availability: All relevant data are within the manuscript.
Funding: This research is supported by Hamadan University of Medical Sciences (Grant No: 990202389).
Competing interests: The authors have declared that no competing interests exist.
Introduction
People of each successful company are definitely its most important assets. However, detailed investigations reveal that a high percentage of incident causes have been ascribed to some forms of this element error. On the other hand, with the rapid technological innovation, the percentage of operator error in system failure tends to become conspicuous compared to technical failure. The generic term of human error as a workable label for human functions whether done or not done, is unintended by the operational system concept and negatively contributes to risk. As a result, in order to effectively prevent accidents from happening, Human Reliability Analysis (HRA) is essential as a structured way to represent unintentional operator contribution to system reliability. The main aim of HRA includes identification of human interactions in a system, hierarchical task analysis, human error quantification, and proposed reduction measures.
Due to the poor or completely absence of statistical data on human error, correct expert judgments can be collated and mapped into human error probability, through a suitable method. Human Error Reduction and Assessment Technique (HEART) as a famous HRA technique, due to its anticipative process, provide a straightforward method to estimate probabilities of human error based on the analysis of tasks. The HEART method was formed under the assumption that the joint effect of a broad selection of error producing conditions (EPCs) from the EPC reference list derives the operator’s error [1, 2]. Notwithstanding the great simplicity, comprehensibility, and user-friendliness of HEART, it faces varying levels of uncertainty in assigning of weights to each EPC, denoted as APOA, by experts. To remove the aforementioned drawback, many efforts have been made to modify the HEART method.
However, advanced approaches cannot sufficiently address different types of uncertainty. Besides, most of these approaches are still facing an open issue, namely the lack of ability to consider the confidence level (reliability or credibility) of the experts. Indeed, HEART ignores the credibility of the analyst judgment to a large extent, which may have an effect on the APOA and consequently final results.
Although in extant literature most of the recent advances in HEART are Fuzzy based, we usually use Fuzzy set to express the restriction of one thing, and the reliability of the information provided by experts also is very crucial in decision-making. We are encountering this circumstance when we are asking two exemplary experts the following question: Determine the APOA of error promoting condition “operator overload” on the subtask “apply for permit to work”. The first expert was having a PhD degree in power electrical engineering and he had been working as a consultant in electrical power transmission and distribution systems for more than 14 years. The second was having a master’s degree in safety engineering and had been working as a risk assessor and safety auditor in a regional electric company for about six years. If it is assumed that the confidence level of expert is equal and the differences in credibility are ignored, the impact of the first expert opinion on the outcome was more significant than that of the second one. However, if it is known that the second expert has a very high level of confidence in his opinion while the second expert was not, inaccurate decision information might be achieved [3]. Therefore, the APOA can be estimated much more truth by considering reliability of experts in judgment and an extension of Z-numbers can adequately accommodate the expert reliability in their preferences. It is noteworthy that in comparison to Fuzzy numbers, Z-numbers is more powerful to explain human knowledge. This supremacy is due to Z properties to explain both restriction and reliability.
Thanks to its ability to more precisely handle the expert confidence (reliability) towards their vote, the applications of Z-numbers become more and more extensive in lots of domains such as renewable energy selection [4], evolutionary games [5], psychology [6], data fusion [7], risk analysis [8, 9], control of robot [10], medicine [11, 12], and decision making process [13–16].
Up until now, according to available literature and the authors’ knowledge, the reliability or confidence of expert is not well taking into consideration in HRA techniques. Therefore, the current paper proposes a composite HEART methodology for HEP assessment which integrates HEART and Z numbers short for, Z-HEART.
The rest of the study was constructed as follows. At first, state of the art of HEART technique is reviewed. In following, basic preliminaries about classical HEART and Z-numbers are provided. Next, human error in the de-energization of the power line for maintenance was assessed to show the validity of the proposed approach. Finally, the conclusion and future directions was described.
State of the art
After four decades of researches in the HRA reams, today these methods can be arranged into three generations [17]: in the first-generation, the methodologies mainly focus on the likelihood of human error occurrences. This generation is represented by well-established techniques, such as HEART [18], THERP [19], JHEDI [20], and SLIM [21]. The second-generation methodologies that have appeared on the basis of former category and are still being developed, put stress on cognitive information-processing to explain causes of human error. The relatively salient techniques are CREAM [22, 23], MERMOS [24], and ATHEANA [25]. The third-generation, known as next-generation methodologies, is emerging to bridge the gaps of the both previous HRA generations. The last generation employed tools such as Fuzzy logic [26, 27], Bayesian network [28], multiple criteria decision making (MCDM), Montecarlo [29], Dempster-Shafer theory [30], are applied in hybrid with already existing techniques to handle a specific challenge.
To quantify unintentional human failure probability, the dearth of empirical data on failure rate has caused challenges to current HRAs. In other words, determining the probability of the human failure is shrouded in uncertainty, because many factors may contribute to them. As a last resort in this situation, a few people with experience and knowledge specific to the process under study may be invited to provide opinions about the system being evaluated. However, uncertainty is an unavoidable part of expert elicitation process since always there is an opportunity of error, biasness, and indecisiveness in judgement.
The HEP derived in HERAT, as a widely used HRAs technique, is made up of three factors (GTT, EPC, and APOA). While, the two first factors are relatively structured affair, probability of human error to a great extent depends on the accuracy of experts’ judgment during APOA derivation. In the APOA estimation, the importance of each chosen EPC on the task under study is elicited based on expert opinion. APOA as a value, which varying from 0 to 1 (0%–100%), reflect how much EPCs influence on human error and has to be decided by the analyst. However, there are some vagueness in obtained information in two aspects of experts’ opinions and sureness of expert in opinions. Thus, because of experts’ unreliable judgment, it imposed some shortages to the analysis. By the other hand, HEART does not assist analyst in a concrete manner for appraisal of APOA. However, the matter of uncertainty in APOA appraisal has not gone unnoticed in safety and HRA scholars have been proposed several methodologies to rectify this problem in many different ways. To overcome the inconsistencies related to expert judgments, for example Casamirra et al. amalgamate Fuzzy theory, HEART, and FTA analysis to study human error probability in the irradiation facilities [31]. Castiglia and Giardina [32] applied Fuzzy set concept and conventional HEART to derive HEP in pressure CV (control valve) maintenance in hydrogen stations. Akyuz and Celik [33] suggested a hybrid HEART based on AHP to obtain the EPCs proportion of effect in calculation operator error probabilities. These authors also presented an extended methodology of HEART which integrated with type-2 Fuzzy to cope with the experts’ elicitations uncertainty in the APOA appraisal [34]. Maniram Kumar et al. [35] used Fuzzy logic combining with HEART to overcome the inaccuracy of experts’ preferences in assigning the relative strength of EPCs over GTT. Mirzaei Aliabadi [27] proposed a human error analysis composite HEART and Intuitionistic Fuzzy to find HEP in furnace start-ups tasks. Using Fuzzy HEART, Mirzaei Aliabadi et al. [36] assess the probability of maintenance error in catalyst replacement of process refinery. Based on Dempster–Shafer (D-S) theory, Islam et al. [30] introduced a developed HEART, to fuse opinions of exert panel regarding the importance of each chosen EPC on the maintenance task of a condensate pump. Wang et al. [37] firstly put forward a new HEART model to assess human error probability in high-speed railway dispatching tasks with amalgamation of original HEART and Fuzzy analytic network process (FANP). To appraisal human error in daily control procedure of the steam boiler Can et al. provided an extended HEART based on advanced version of decision making trial and evaluation laboratory (AVDEMATEL) integration. Guo and Sun [38] made an endeavor to quantify the APOA values in assessing human error in the aircraft manipulation process using HEART combined with improved analytic hierarchy process (IAHP) method.
It is highly difficult to find a research that specifically composite Z-numbers with HRAs technique to handle the confidence level of expert.
Based on the relevant literature review conducted on the abovementioned works, it was observed that this work contributes to the context of maintenance error assessment as follows. This is the first time to merge conventional HEART with Z-numbers, in order to properly obtain EPCs proportion of effect. Besides, in the prevailing literature, there has been no attempt to analysis human reliability in de-energization of the power line in electrical maintenance. Hence, the current article aims to remedy the gap in this particular scope using the proposed novel Z-numbers-based HEART approach (shortly, Z-HEART).
Materials and methods
Ethical statement
The study was approved by the ethics committee of Hamadan University of Medical Sciences (Ethics Committee No: IR.UMSHA.REC.1398.1087).
HEART technique
The HEART technique was first introduced in 1985 by Williams and 3 years later was outlined in detail [39]. Basically, this technique is employed to assess human tasks with given number values for human error (Generic Error Probability) specific to tasks and for environment in which operators perform (context). Considering the selected values of tasks and error producing conditions (as context) the formula of final probabilities of human error are computed. In a nutshell, the general application consisted of the following steps:
- Task analysis
- Attribute correspondent generic task type
- Assign the EPCs detriment the activity
- Assessed proportions of affect (APOA) of the assigned EPCs
- Compute the final HEP.
Given above, HEP can be found as [36]: (1) (2) Where EPCi = EPC for the ith condition, Table 1; APOAi = APOA for ith condition; HEP = Final HEP; GEPj = GEP (the Generic Error Probability is given to each GTT, Table 2) related with the to be evaluated task.
Basic preliminaries of Z numbers
Z-numbers, as an extension of Fuzzy set but more effective, opened doors to a new field developed by Zadeh [40] to provide a computation basis for uncertain information. Information uncertainty as an inevitable element of any decision-making process has a hierarchy, often consists of the following levels of confinements that handles uncertain information: confidence interval, type-1 Fuzzy sets, type-two Fuzzy sets (IT2FS), and Z-number. Fig 1 shows the hierarchy levels. The Z-number is an ordered pairwise of Fuzzy numbers denoted as where is a Fuzzy restriction on the values that XA can take, and is the reliability of value [41]. In fact, the probability of value is estimated by . For uncertain variable X in particular, a further definition can be displayed as
In which, Prob presents the probability value. As an example, the sentence “operator inexperience effect the check in no voltage condition is likely to be high” is a Z concept. The effect of the check in no voltage condition is a Fuzzy number. The effect of operator inexperience on the check in no voltage condition may be mildly high. But, “likely” is the probability of this event. It may affect the check in no voltage condition other levels in some context. In Fig 2 a simple Z-number is illustrated. and are trapezoid and triangular Fuzzy numbers which can be defined by and , respectively [42].
is a fuzzy restriction and is the reliability of value.
Given Z-number , suppose and . Parameters and indicate the trapezoidal and triangular Fuzzy membership functions, respectively. Firstly, the crisp centroid (center of gravity, COG) value of are calculated to transform reliability (right side of Z number) in to a crisp value α as follows [43]: (3)
Then, add the weights of the right side (α) to the left side (expert opinion). So, the weighted reliability is illustrated as [43]: (4)
Since the maximum height of the is α not 1, it cannot be considered as a normal Fuzzy number. According to fuzzy expectation of a fuzzy number it can be converted to regular Fuzzy number by considering reduction coefficient , denoted as [43]: (5)
It has been demonstrated that the Fuzzy expectation of is equivalent to . Fig 3 summarizes the transformation method. For details of the proof is referred to Kang et al. [43].
α is crisp value of reliability side of Z-number. is the left side of Z-number and is the final normal Fuzzy number.
Proposed Z-HEART
According to the previous section, an integrated technique based on the HEART and Z-numbers short for Z-HEART is proposed. To facilitate the application, the algorithm of this technique is summarized below. Excel software (Microsoft Excel (2007)) was used to perform all analysis. The procedure of this algorithm is depicted in Fig 4.
Task analysis
The first and common step in HRA methods is to specify the human involvement in the sociotechnical system, which obtained by the application of hierarchical task analysis. This step, among other things, determines the human’s tasks, practices to be pursued and essential tools.
Attribute GTT and EPCs to each identified task
Finding the best fit generic task type (from nine general tasks in Table 1) to task is being assessed and next selecting the generic error probability from proposal range values, is the main goal of this step. For instance, responding to “check in no voltage condition” must use Table 1, to select the fittest GTT. Considering the fact that it is not a complex duty, E could be related, with a baseline human error probability of 0.02 or 2 errors in 100 opportunities. Afterwards, the assessor ascertains which human error forcing context under the HEART methodology named error-producing conditions (EPC) that related to be evaluated task. As it apparent from Table 2, each of them has a specific weight. If for a given task more than one EPC can be considered, next step, APOA calculation is required.
Assessed proportions of affect (APOA) of the assigned EPCs
In this step, the importance of each chosen EPC on the task under analysis is elicited based on expert opinion. APOA as a value, which varies from 0 to 1 (0%–100%) reflects the influence of EPCs on human error, and has to be decided by the analyst. However, there are some vagueness in obtained information in two aspects of experts’ opinions and sureness of expert in opinions. Z-number could be combined with HEART to overcome this shortcoming in APOA evaluation. The suggested APOA appraisal in the context of Z-number is summarized as below:
Stage 1: Domain expert investigation.
The purpose of this stage is to elicit two types of information from expert using Z-number: the opinion about the occurrence probability (importance of each chosen EPC on the tasks), and subjective reliability level (confidence level or credibility) of what they are saying. This information was synthesized to reach the most reasonable judgment. In addition, the effect of difference in quality of expert is presented by expert judgment ability level (from 0–1), calculated on the basis of criteria set out in Table 3. In this study, corresponding Z-applied set was utilized for estimating of APOA, which are illustrated in Table 4.
After that, for each EPC, transform subjective reliability level to α, add it to the expert opinion (left side of Z-number), and subsequently was converted the results to regular Fuzzy number. The output of this stage is to be aggregated in onward stages to get a single number.
Stage 2: Aggregation.
Because of the different opinions on the probability, fuzzified linguistic terms gathered from the previous stage were cumulated in this stage to provide a single probability. For this reason, the algorithm can be briefly described [44].
- Computing the similarity degree
The degree of similarity S(Ai, Aj) between the opinions Ai and Aj of two experts was evaluated. Given Ai = (a1, a2, a3, a4) and Aj = (b1, b2, b3, b4) are the two Z standard trapezoid Fuzzy numbers, similarity scores were estimated in accordance with the following equation [45]: (6) - Computing the Average Agreement AA (Ei) degree for each of the experts [45]: (7)
- The Relative Agreement RA (Ei) degree, of all experts was found as follows [45]: (8)
- Likewise, the consensus coefficient degree C (Ei) of the experts was yielded as follows [45]:
(9)
where, β ∈ [1,0], as dominance factor shows the priority of judgment ability level of experts over relative agreement. - Computing aggregation results, according to the following equation [45]:
(10)
where, RAGZ is an aggregate Fuzzy number of EPC, and is the regular Fuzzy number (Eq 5).
Computing the final HEP
After calculating APOAs based on Z-number, the Eqs 1 and 2 are applied to obtain human error probability of all sub-tasks.
Human error probability in de-energization of power line
Performing maintenance on overhead power lines really is a daring job that requires comprehensive hazard awareness of the performed tasks and safe working practices. In the United States, during the years 2003–2007, exposure with overhead power lines resulted 43% of all on-the-job fatal electrocutions [46]. Statistical records of eight years, in Iran show that from 2007 to 2015, 119 electrical accidents happened and worker failure was found as the cause of 75 percent of them [47]. In working on electrical lines, where coming in contact with live line can lead to death or severe injuries, the most basic safety approach is to de-energize lines. Deenergizing, also known as clearing, requires more than merely turning a switch off. In order to prevent this accident, strict safety measures must be provided before beginning work. Given the hazardous nature involved, a human failure in de-energization process can lead to severe injuries and fatalities. Hence, it is expected human reliability analysis help improve safety by providing procedural recommendations. The case study was conducted in an electrical distribution company in Iran. In this company, more than 35 maintenance groups are daily involved with the maintenance and most of these groups have three maintainers.
Task analysis
De-energization power line can be decomposed into five main tasks, on the basis of hierarchical task analysis, including:
- Request to de-energize: The maintenance crew shall make a request of the operation unit to de-energize a given portion of distribution line.
- De-activation: The most basic action is to open all energy control devices feeding the sections of the distribution line, which workers may be exposed, operation crew.
- Test/checks: Conduct voltage measurements and visual inspections to verify all line is de-energized. To verify that the line is de-energized and safe, voltage measurements shall be made at the disconnected line.
- Discharge: Discharge any hazardous energy accumulated in the de-energized lines. An extremely simple way to discharge an overhead line without leaving the ground is wire gun tester application.
- Install temporary grounds: Safety temporary grounds shall be installed to ensure the presence of an equipotential working zone.
Distribution of main tasks made up 26 subtasks, as summarized in Table 5. The potential of human error is calculated for all of these subtasks, which provided by HTA.
Attribute GTT and EPCs to each identified task
The subtask of de-energization of power line is assigned to suitable GTTs based on duty descriptions. Afterward, based on specific operational conditions, a set of associated EPCs is selected of supplied EPCs. The results are presented in Table 6.
Assessed proportions of affect (APOA) of the assigned EPCs
According to the employed experts’ opinion, the corresponded Z-numbers of degrading effect of each EPC in relation to subtasks is elicited (for example Z-numbers extracted for EPC1 of subtask T1 are displayed graphically in Fig 5). The right part of Z-numbers is a trapezoid Fuzzy number based on what the experts voted regarding the degrading effect of each EPC. The reliability part of Z-number presents the expert confidence towards their vote. Table 4 presents the Fuzzy number description exploited to describe the linguistic terms for the right and left part in representing Z-numbers for EPC degrading effect evaluation. In electrical distribution practice, as other industries, the expert quality of person increased with the accumulation of education backgrounds and service time. For reasons of anonymity, the identities of the experts who participated in this work have not been wide open, and they have therefore been labeled as E1, E2, E3, E4, E5, and E6. The classical method [47] is employed to obtain a weight to present the expert judgment ability as reported in Table 7. In the next step, the elicited Z-numbers are transformed into normal Fuzzy numbers and aggregate the expert opinion using Eqs 3–5 and 6–11, respectively. Finally, for each EPC a Z-number is formed which is as follows:
In light of the above research method, as an example the EPC1 for the subtask 1 are aggregated and results are tabulated in Table 8, which contains the computations such as similarity degree S(Ai, Aj), average agreement AA(Ei) degree, relative agreement (RAD) degree, etc. Moreover, the similar degree was obtained through all expert opinions, the average agreement, and the relative agreement of other EPC.
Compute the final HEP
The corresponding multiplier of the chosen GTT, EPC, and APOA of EPC1 related to subtask 2 inputted into the Eqs (1 and 2) as exhibited in Table 9. Using the same procedure, the HEP values for operation steps of switching of (de-energization) power line are provided in Table 6.
Sensitivity analysis
With a view of the attempt will take during the process of expert elicitation, it must be proved using sensitivity analysis on the forehand, if the accuracy of the input parameters is sufficiently affecting the final outcome of the analysis. Therefore, to checking the fruitfulness and robustness of the suggested algorithm of Z-HEART, a sensitivity analysis applied under different possible confidence levels. Each member of expert panel could provide their level of confidence in five linguistic terms as very low (VL), low (L), medium (M), high (H), and very high (VH). So, the set of all possible combinations of level of confidence that may be elicited from six experts would be 15625 cases which about 1000 cases are randomly chosen to display the variation of the HEPs. Towards this purpose, T10 and T20, respectively as the most and least vulnerable subtasks to human error, are taken into account to perform sensitivity analysis. As it reported in Fig 6 the HEP of T10 is widely varied by varying confidence level. Given the random assignment of confidence level in Z-HEART for T10, the maximum HEP is 1.09E-01, and the minimum is equal to 4.11E-02. It is visible that the yielded HEPs are sufficiently apart from each other. Also, in a similar form the maximum and minimum HEP values of the T20 are 4.76E-02 and 3.01E-02, respectively.
Based on the above analysis, it is confirmed that the results are reasonably sensitive to the proper selection of confidence level and hence, the introduced framework in this study can provide suitable contributions in safety measures advice.
Results and discussion
The results of the implementation of the Z-HEART and Fuzzy HEART for de-energization power line are presented in Table 6.and Fig 7. As can be seen here, there are some differences between HEP derived by Z-HERAT and those calculated by Fuzzy version-based. This is mainly because Fuzzy based algorithms do not take into account the reliability/sureness of propositions. In particular, ignoring reliability of propositions, lead to overestimation of HEP values in HEART Fuzzy based approach. In other words, the Z-HERAT approach considers both objective and subjective reliability of expert evaluation during the APOA estimation process. Existed Fuzzy based approach employed classical Fuzzy values for attributing a linguistic term to a linguistic variable. The reliability of this attribution cannot be set out with the same Fuzzy value (not even type-two Fuzzy sets as they represent the uncertainty in Fuzzy terms themselves instead of the reliability of the propositions) [9].
As the procedure of line de-energization composed of five main tasks with 26 sub-tasks, quantification of human reliability require the total HEP calculation based on sub-task dependency [48]. As can be seen from HTA, DE1 consists of three sequent subtasks (T1- T3) which shall be performed satisfactorily in order to accomplish the authorized de-energization. This implies that, DE1 will fail if any of three subtasks fails. As a result, the HEP value for the DE1 is taken as the maximum value of the three sub-tasks that is 1.36E-02. Analogously, the DE2 will fail in case any of four subtasks (T4- T7) fails. Thus, the HEP value for main task 2 was found to be 6.54E-02. Because of the low dependency among the five subtasks, the HEP value can be assigned 7.53E-02 for DE3 (T8-T12). Moreover, whole main task four, DE4 (T13- T19) fails to operate if any one of its individual subtasks fails (serial system with high dependency). Hence, the HEP value can be yielded as 3.34E-02. Similarly, the same situation was observed in DE5 (T20-T26), with HEP value 5.49E-02. To determine final HEP value for de-energization of power line, five main maintenance tasks should achieve individually (for operation total to succeed). This indicates that de-energization of power line will not be carried out correctly if any of the five main task fails. Numerically, the final value of HEP was obtained to be 7.53E-02.
Reliability by definition is the probability of operating successfully in a given unit of time, and is the automatically the complement to “1” of the probability of cumulative failure. Thus, the equation of R(t) = 1−F(t) signifies the relation between cumulative failure F(t) and reliability R(t), which are complementary. In other words, the sum of two values is equal to one (or 100%). Therefore, R(t) = 1 − (6.72E − 02) = 9.25E − 01, demonstrates that the final HEP value for de-energization of power line is rather high.
In light of the findings, task #T10 (check in no voltage condition) is the most vulnerable subtask in view of human failure in de-energization power line operations, with a HEP of 7.53E-02. The main cause of that is direction of operator attention to other subtasks. Also, this error occurs when the same person disconnect the related feeder and carries out the test voltage. Besides the clearing of distribution line by disconnecting feeder, voltage measurement is a critical task. There are many situations that may induce voltage condition in network, for example malfunction of recloser in the path of a consumer generator, and get back electricity to disconnected network. Moreover, the subtasks #T6 (lock and tag) obtain the second highest HEP value. One of the maintenance practices performed in this company is the lockout/tagout of the energy source. Since the operation may be carried out considerably fast, there could be a time shortage. However, the operator who is in charge to install lockout/tagout at feeder may skip the task in the time allowed. Additionally, the large volume of work resulting may cause inadequate crew relaxation and not enough time with the family, resulting in mental and physical tiredness of the crew. Also, the high HEP value in subtasks #T25 (install temporary ground, also at the other end of de energized section) can be attributed to same reasons.
Accordingly, subtask #20 (sitting the location of inserting ground electrode) has a low contribution to the HEP value. As one can see this subtask is relatively easier in compared with other. It is noteworthy that, among the 26 subtasks, 6 of them had higher HEP value than the average HEP (i.e., 1.41E-02).
Conclusion
In this paper, we proposed a hybrid human reliability analysis that merged conventional HEART technique with Z-numbers. Although Fuzzy-based HEART technique is an advanced tool for deriving HEP, it does not assist analyst in a concrete manner for calculation of assessed proportion of affect (APOA). Indeed, it ignores the reliability (confidence) of the analyst judgment to a large extent, which may have an effect on the final results. Z-numbers rectify this limitation by taken into account the expert reliability in their judgements, so the Z-numbers employed during APOA estimation in the proposed hybrid approach. It is demonstrated that Z-HEART is feasible for assessing human error and aside from methodological contributions there are many practical benefits for electricity distribution companies in this study. An illustrative example concerning the human error probability was performed for the de-energization of power line. Based on the results, the subtask “check in no voltage condition” is the most vulnerable activity to human error. By observing the obtained results, the overall human reliability value during the whole operation was 9.25E-01. This implied that the reliability of maintenance group was acceptable. Also, the proposed algorithm is a trend toward the formalization of rational decision-making ability of a human expert in uncertainty conditions. Further, validity of the proposed framework was realized through a sensitivity analysis and ensures logical information in development of potential control procedures. Depending on the characteristics of subtasks, control measures can be formulated to eliminate or minimize the risk of unintentional human contributions in electricity distribution companies.
The on-going study has some limitations. The proposed method is heavily relies on domain experts. Hence, produced results from that are only according to the employed expert preferences, which would vary between respondents. Additionally, the findings of the research are based on the opinion elicited from the experts working in the electricity distribution company in Iran.
Our subsequent research goal will focus on the effects of various versions of Fuzzy membership functions for restriction and reliability on the human reliability approximated by the Z-HEART. Moreover, although Z-number has enough power to handle the expert confidence towards their vote, confidence level can be taken into account as an attribute in obtaining specific weightings of selected experts using Fuzzy analytic hierarchy process (FAHP) as well. We plan to conduct the FAHP version-based HEART, followed by making a lucid comparison between the computed results from the present study and HEART-FAHP based results.
References
- 1. Kandemir C, Celik M. Determining the error producing conditions in marine engineering maintenance and operations through HFACS-MMO. Reliab Eng Syst Saf. 2021;206.
- 2. Reddy K, Byrne D, Breen D, Lydon S, O’Connor P. The application of human reliability analysis to three critical care procedures. Reliab Eng Syst Saf. 2020;203. pmid:33432256
- 3. Yazdi M, Hafezi P, Abbassi R. A methodology for enhancing the reliability of expert system applications in probabilistic risk assessment. J Loss Prev Process Ind. 2019;58: 51–59.
- 4. Chatterjee K, Kar S. A multiicriteria decision making for renewable energy selection using zznumbers in uncertain environment. Technol Econ Dev Econ. 2018;24: 739–764.
- 5. Kang B, Chhipi-Shrestha G, Deng Y, Hewage K, Sadiq R. Stable strategies analysis based on the utility of Z-number in the evolutionary games. Appl Math Comput. 2018;324: 202–217.
- 6. Aliev R, Memmedova K. Application of Z -number based modeling in psychological research. Comput Intell Neurosci. 2015;2015. pmid:26339231
- 7. Jiang W, Xie C, Zhuang M, Shou Y, Tang Y. Sensor data fusion with Z-numbers and its application in fault diagnosis. Sensors (Switzerland). 2016;16. pmid:27649193
- 8. Zhang X, Mohandes SR. Occupational Health and Safety in green building construction projects: A holistic Z-numbers-based risk management framework. J Clean Prod. 2020;275.
- 9. Pasman HJ, Rogers WJ. How to treat expert judgment? With certainty it contains uncertainty! J Loss Prev Process Ind. 2020;66.
- 10. Abiyev RH, Akkaya N, Gunsel I. Control of omnidirectional robot using z-number-based fuzzy system. IEEE Trans Syst Man, Cybern Syst. 2019;49: 238–252.
- 11. Wu D, Liu X, Xue F, Zheng H, Shou Y, Jiang W. A new medical diagnosis method based on Z-numbers. Appl Intell. 2018;48: 854–867.
- 12. Chai J, Xian S, Lu S. Z-uncertain probabilistic linguistic variables and its application in emergency decision making for treatment of COVID-19 patients. Int J Intell Syst. 2021;36: 362–402.
- 13. Peng HG, Wang JQ. A Multicriteria Group Decision-Making Method Based on the Normal Cloud Model with Zadeh’s Z-Numbers. IEEE Trans Fuzzy Syst. 2018;26: 3246–3260.
- 14. Kang B, Wei D, Li Y, Deng Y. Decision making using Z-numbers under uncertain environment. J Comput Inf Syst. 2012;8: 2807–2814.
- 15. Wang J qiang, Cao Y xi, Zhang H yu. Multi-Criteria Decision-Making Method Based on Distance Measure and Choquet Integral for Linguistic Z-Numbers. Cognit Comput. 2017;9: 827–842.
- 16. Yaakob AM, Gegov A. Interactive TOPSIS Based Group Decision Making Methodology Using Z-Numbers. Int J Comput Intell Syst. 2016;9: 311–324.
- 17. Braglia M, Di Donato L, Gabbrielli R, Marrazzini L. The house of safety: A novel method for risk assessment including human misbehaviour. Saf Sci. 2018;110: 249–264.
- 18.
Williams JC. Heart—a Proposed Method for Assessing and Reducing Human Error. Proceedings—Advances in Reliability Technology Symposium. 1986. https://ci.nii.ac.jp/naid/10004187786/.
- 19. Corlett EN. Handbook of human reliability analysis with emphasis on nuclear power plant applications. Appl Ergon. 1981;12: 36.
- 20. Kirwan B. The development of a nuclear chemical plant human reliability management approach: HRMS and JHEDI. Reliab Eng Syst Saf. 1997;56: 107–133.
- 21. Islam R, Yu H, Abbassi R, Garaniya V, Khan F. Development of a monograph for human error likelihood assessment in marine operations. Saf Sci. 2017;91: 33–39.
- 22. Chen D, Fan Y, Li W, Wang Y, Zhang S. Human reliability prediction in deep-sea sampling process of the manned submersible. Saf Sci. 2019;112: 1–8.
- 23. Giardina M, Buffa P, Dang V, Greco SF, Podofillini L, Prete G. Early-design improvement of human reliability in an experimental facility: A combined approach and application on SPES. Saf Sci. 2019;119: 300–314.
- 24. Le Bot P. Human reliability data, human error and accident models—Illustration through the Three Mile Island accident analysis. Reliab Eng Syst Saf. 2004;83: 153–167.
- 25.
Cooper SE, Ramey-Smith AM, J. Wreathall, Parry GW, Bley DC, Luckas WJ, et al. A Technique for Human Error Analysis. 1996.
- 26. Li PC, Chen GH, Dai LC, Zhang L, Zhao M. Fuzzy logic-based approach for identifying criticality of human error risk. Yuanzineng Kexue Jishu/Atomic Energy Sci Technol. 2010;44: 571–577.
- 27. Aliabadi MM. Human error analysis in furnace start-up operation using HEART under intuitionistic fuzzy environment. J Loss Prev Process Ind. 2021;69. pmid:33173256
- 28. Abrishami S, Khakzad N, Hosseini SM. A data-based comparison of BN-HRA models in assessing human error probability: An offshore evacuation case study. Reliab Eng Syst Saf. 2020;202.
- 29. Galfano A, Ascione A, Grimaldi S, Petralia G, Strada E, Bocciardi AM. A new anatomic approach for robot-assisted laparoscopic prostatectomy: A feasibility study for completely intrafascial surgery. Eur Urol. 2010;58: 457–461. pmid:20566236
- 30. Islam R, Anantharaman M, Khan F, Abbassi R, Garaniya V. A hybrid human reliability assessment technique for the maintenance operations of marine and offshore systems. Process Saf Prog. 2020;39.
- 31. Casamirra M, Castiglia F, Giardina M, Tomarchio E. Fuzzy modelling of HEART methodology: Application in safety analyses of accidental exposure in irradiation plants. Radiation Effects and Defects in Solids. 2009. pp. 291–296.
- 32. Castiglia F, Giardina M. Analysis of operator human errors in hydrogen refuelling stations: Comparison between human rate assessment techniques. Int J Hydrogen Energy. 2013;38: 1166–1176.
- 33. Akyuz E, Celik M. A hybrid human error probability determination approach: The case of cargo loading operation in oil/chemical tanker ship. J Loss Prev Process Ind. 2016;43: 424–431.
- 34. Akyuz E, Celik E. A modified human reliability analysis for cargo operation in single point mooring (SPM) off-shore units. Appl Ocean Res. 2016;58: 11–20.
- 35. Maniram Kumar A, Rajakarunakaran S, Arumuga Prabhu V. Application of Fuzzy HEART and expert elicitation for quantifying human error probabilities in LPG refuelling station. J Loss Prev Process Ind. 2017;48: 186–198.
- 36. Aliabadi MM, Mohammadfam I, Salimi K. Identification and evaluation of maintenance error in catalyst replacement using HEART technique under fuzzy environment. Int J Occup Saf Ergon. 2021; 1–34. pmid:33648429
- 37. Wang W, Liu X, Qin Y. A modified HEART method with FANP for human error assessment in high-speed railway dispatching tasks. Int J Ind Ergon. 2018;67: 242–258.
- 38. Guo Y, Sun Y. Flight safety assessment based on an integrated human reliability quantification approach. PLoS One. 2020;15. pmid:32298311
- 39.
Williams JC. Data-based method for assessing and reducing human error to improve operational performance. IEEE Conference on Human Factors and Power Plants. 1988. pp. 436–450.
- 40. Zadeh LA. A Note on Z-numbers. Inf Sci (Ny). 2011;181: 2923–2932.
- 41. Božanić D, Jurišić D, Erkić D. LBWA—Z-MAIRCA model supporting decision making in the army. Oper Res Eng Sci Theory Appl. 2020;3: 87–110.
- 42. Božanić D, Tešić D, Milić A. Multicriteria Decision Making Model with Z-Numbers Based on FUCOM and MABAC model. Decis Mak Appl Manag Eng. 2020;3: 19–36.
- 43. Kang B, Wei D, Li Y, Deng Y. A method of converting Z-number to classical fuzzy number. J Inf Comput Sci. 2012;9: 703–709. Available: http://www.joics.com.
- 44. Mirzaei Aliabadi M, Pourhasan A, Mohammadfam I. Risk modelling of a hydrogen gasholder using Fuzzy Bayesian Network (FBN). Int J Hydrogen Energy. 2020;45: 1177–1186.
- 45. Yan F, Xu K, Yao X, Li Y. Fuzzy Bayesian network-bow-tie analysis of gas leakage during biomass gasification. PLoS One. 2016;11. pmid:27463975
- 46.
Bureau of Labor Statistics, US Department of Labor. National Census of Fatal Occupational Injuries in 2010 (Preliminary Results). 2011.
- 47. Rahmani A, Khadem M, Madreseh E, Aghaei HA, Raei M, Karchani M. Descriptive study of occupational accidents and their causes among electricity distribution company workers at an eight-year period in Iran. Saf Health Work. 2013;4: 160–165. pmid:24106647
- 48. Akyuz E, Celik M. Application of CREAM human reliability model to cargo loading process of LPG tankers. J Loss Prev Process Ind. 2015;34: 39–48.