The electric vehicle (EV) is considered a premium solution to global warming and various types of pollution. Nonetheless, a key concern is the recharging of EV batteries. Therefore, this study proposes a novel approach that considers the costs of transportation loss, buildup, and substation energy loss and that incorporates harmonic power loss into optimal rapid charging station (RCS) planning. A novel optimization technique, called binary lightning search algorithm (BLSA), is proposed to solve the optimization problem. BLSA is also applied to a conventional RCS planning method. A comprehensive analysis is conducted to assess the performance of the two RCS planning methods by using the IEEE 34-bus test system as the power grid. The comparative studies show that the proposed BLSA is better than other optimization techniques. The daily total cost in RCS planning of the proposed method, including harmonic power loss, decreases by 10% compared with that of the conventional method.
Citation: Islam MM, Shareef H, Mohamed A (2017) Improved approach for electric vehicle rapid charging station placement and sizing using Google maps and binary lightning search algorithm. PLoS ONE 12(12): e0189170. https://doi.org/10.1371/journal.pone.0189170
Editor: Xiaosong Hu, Chongqing University, CHINA
Received: August 24, 2017; Accepted: November 20, 2017; Published: December 8, 2017
Copyright: © 2017 Islam et al. This is an open access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.
Data Availability: All relevant data are within the paper and its Supporting Information files.
Funding: The authors gratefully acknowledge the UAEU under Research Start-up (3) 2015. The funder had no role in study design, data collection and analysis, decision to publish, or preparation of the manuscript.
Competing interests: The authors have declared that no competing interests exist.
Introduction
Electric vehicles (EVs) have gained increasing attention in recent years because of the enormous amount of carbon dioxide gas released from conventional vehicles. Dependency on imported crude oil and the depletion of fossil fuel resources lead to the search for alternative energy sources that are efficient, economical, and environment friendly for transportation systems. EVs do not generate any form of emission and pollution. However, the main obstacle to the widespread deployment of EVs from the customer perspective is the lack of charging stations (CSs). EV users urgently need a charging solution for long-distance driving. Therefore, a sufficient number of rapid CSs (RCSs) are important for rapid charging and for alleviating charge anxiety. Rapid charging may cause massive loading in a distribution network when EVs connect to an RCS. Therefore, finding an optimal location and sizing for RCSs that generate few adverse impacts on power distribution grids and that reduce transportation energy loss (TEL) is an essential requirement for the widespread deployment of EVs.
Recent studies have focused on the optimal placement and sizing of public CSs. These studies have considered two aspects: economics and power grid-related concepts. From the economic perspective, the authors of [1] developed a CS placement method based on grid partition that minimizes transportation cost by using a genetic algorithm (GA) to access a CS. Nonetheless, cost functions, such as fixed, land, and operating costs, were disregarded in optimizing the system. In [2], particle swarm optimization (PSO) was applied to identify an optimal location for a CS based on construction and running costs and by considering geographic information and traffic flow as constraint conditions. A mixed-integer programming model was proposed in [3] to determine CS locations for diminishing range anxiety and minimizing traveling distance from an EV to a CS. The authors of [4] developed a model for CS placement and sizing that relies on fast charging demand distribution and road network structure; they applied CPLEX software to solve the problem.
In [5], a multi-objective, multivariate optimal planning model was proposed in terms of investment costs and feeder energy losses with other constraint conditions to solve the optimal CS planning problem that includes power system issues. The proposed approach was tested on the IEEE 33-node distribution system by using an improved GA and then compared with a traditional GA. A GA with the Pareto optimal front was utilized in [6] to minimize traveling and power loss costs using the IEEE 14-bus test system. A GA was also adopted in [7] to find the best parameters among three different models of ultra-capacitors for an EV energy management system based on model accuracy, complexity, and robustness [7]. Meanwhile, the state of charge (SOC) of ultra-capacitors was studied in [8]. A cost model was suggested in [9] by considering the operating costs of a CS, the investment costs of a distribution transformer, and network loss. This model considers different constraints, such as the distance between a substation and EV location, the number of EVs, and the installation costs of CS. PSO was applied to optimize the system. Nevertheless, the prediction of charging demand was neglected in optimizing the model. The authors of [10] proposed a cost-optimal control model to minimize the daily operational expenses of a plug-in hybrid EV charging from a grid, fuel consumption during on-road driving, and battery aging by using convex programming (CP). Similar studies were conducted in [11]; however, integrated CP was utilized to improve computational efficiency. A traffic-constrained poly-objective pattern was introduced in [12] by considering traffic system and power loss for optimal CS placement. This method applied data employment analysis to determine the best candidate solution and cross-entropy algorithm for solving the optimization problem. These techniques effectively reduce power loss, voltage deviation, and travel distance to a CS. The authors of [13] developed an EV model that combined constant power and voltage-dependent load to find optimal CS locations in a power grid based on voltage stability margins, grid power loss, and cable flow ratings. Similarly, an EV model was developed in MATLAB Simulink in [14] with a combination of constant power and voltage-dependent and negative exponential components. The model was simulated on the IEEE 43-bus test distribution system. In [15], the authors found optimal CS sites by considering environmental factors and maximum service coverage. A cost function, including power system loss cost, was developed to determine the optimal sizing of CSs. The method was utilized on the IEEE 123-node test feeder system by adopting a modified primal–dual interior point algorithm. The authors of [16] identified an optimal CS location on a distribution grid by minimizing total costs and real power loss while adopting power system security and traffic flow as constraints. Ant colony optimization was used to find the best CS location on an existing distribution grid. The IEEE 69-bus system was utilized to validate this technique. Existing optimal placement and sizing approaches for CSs are discussed in [17, 18]; and different types of impacts, current issues, challenges of EVs, and technical development of batteries are described in detail in [18, 19]. Besides, the utilization of plug-in EVs along with home battery storage system for smart home energy management is presented in [20, 21].
Previous authors have mainly focused on economic parameters and neglected other parameters, such as a real city transportation network for calculating time and distance from an EV to a CS and SOC for calculating transportation and harmonic power losses caused by EV charging [22]. Accordingly, a novel approach that considers transportation loss (which introduces Google Maps JavaScript API to calculate the real time and distance from the current location of an EV to a CS in consideration of SOC), buildup (BU) cost (which incorporates the costs of the distribution transformer, underground cable, and charger in addition to other costs), and grid power loss cost (which comprises harmonic power loss) is proposed in this study to determine the optimal placement and sizing of RCSs. A new optimization technique, called binary lightning search algorithm (BLSA) [23], is utilized as an optimization tool to solve the RCS planning problem. A comparative study is conducted using the method presented in [24], and an assessment was performed to highlight the importance of factors that affect the RSC planning considered in the proposed method.
Problem formulation for optimal RCS planning
Decision vector, objective functions, and optimization constraints are important elements for binary optimization. These elements, with respect to the RCS placement and sizing problem, are described in the following subsections.
Decision vector
Each possible RCS position in a road network system during the optimization process is selected by using the decision vector, called the RCS placement (RCSP) vector. RCSP is an n bit binary string, in which bit 0 (zero) indicates that no RCS needs to be constructed and bit 1 (one) indicates that an RCS should be installed at a specified site in the road network. Hence, the RCSP vector can be mathematically represented as
(1)
where NRCS is the number of RCSs that are considered possible RCS sites.
Multi-objective functions
For the optimal placement and sizing of RCS, different cost functions, namely, TEL, BU, and substation energy loss (SEL) costs, are considered.
TEL cost.
EV users have to travel a long distance by utilizing an enormous amount of energy to reach an RCS, which can be considered TEL. Google Maps JavaScript API is used in this study to obtain realistic data, such as time and distance from the origin, i.e., the current location of an EV, to the destination, i.e., an RCS. Fig 1 shows the pseudo code of the Google Maps API system for calculating distance and time. In the figure, the URL address holds links that have the information of the distance matrix, i.e., time and distance. Table 1 presents sample time and distance data from an EV to various RCS destinations achieved using Google Maps API. Reaching an RCS located at a long distance within a short time is occasionally possible, as shown in Table 1. Hence, time is considered in TEL cost calculation due to environmental factors, such as traffic on the road.
Pseudo code for attaining time and distance from an EV to RCSs using Google Maps API.
Hence, time taken (ti) from a specific EVi location to all available RCSs can be represented as
(2)
and the minimum time (Ti_min) from the EVi location to the nearest RCS can be obtained as
(3)
Obtaining Ti_min and the current SOC of EVi ensures that the remaining charge percentage in the EVi battery in terms of SOC at an RCS can be expressed as
(4)
where
is the SOC after time Ti_min,
is the SOC at the current position, Dbat is the battery discharge rate, and Cbat is the battery capacity.
In this study, an EV is assumed to stop when the minimum SOC (SOCmin) limit is reached. This limit is predefined as 20%. Therefore, an approximate number of EVs that utilize a specific RCS () based on the calculated SOC (
) after time Ti_min, and SOCmin for all EVs can be obtained as
(5)
where RCSP is the RCS placement decision vector,
is the SOC after time Ti_min, and NEV is the number of EVs.
If is negative, then EVi cannot reach the RCS. Hence, a high cost should be included for other services (e.g., tow trucks) to tow the EV to the RCS. The TEL cost for EVi to access the nearest RCS can be expressed as
(6)
The TEL for EVi that cannot access the nearest RCS when SOC reaches below SOCmin can be represented as
(7)
where PE is the electricity price in $/ kWh, Dbat is the battery discharge rate in kWh, Li is the distance from EVi to the nearest RCS in km, and CEV is the extra cost in $/km.
The normalized total TEL cost (TELnorm) is expressed as
(8)
where TELmax is the maximum TEL cost when a single RCS is selected as the optimal RCS site.
BU cost.
Station BU cost incorporates the costs of land, chargers, and distribution transformers. This cost should also include operational and underground distribution cable costs. As shown in Fig 2, for every vehicle to access a charger, a station generally needs a 4.9 m × 2.75 m area and will overhang the curb by up to 0.08 m. Parking vehicles should avert the EV supply equipment, and users should cautiously move in front of vehicles. An electrical conduit to an RCS can be placed beneath the landscaping. If more than one charger is required, then a space equal to 0.9 m to 1.5 m is necessary among the chargers. In this study, a single charger area, including landscaping and sidewalk, is considered 30 m2, and all the investment costs of the station are assumed to be covered for 10 years. However, the total land area and equipment cost necessary for a specific RCS depend on the number of chargers to be installed. Hence, the number of chargers (Ncha) required for RCSj is obtained as
(9)
and the capacity (Scap) of RCSj can be calculated as
(10)
where
is the maximum permissible number of chargers for any RCS, and Pcha is the rated power of a charger in kW.
When the aforementioned information is considered, the BU cost for RCSj is calculated as
(11)
where
(12)
(13)
(14)
where station fixed cost Cfixed implies that the cost associated with facilities should establish RCSj, Clan is the land cost based on local price and land shape in $/m2, Ccha is the charger BU cost in $/kW, Cugc denotes the distribution cable cost, and
is the conductor cost of the underground cable in $/km. The conductor cost depends on the conductor diameter that relies on power drawn through it, Dj is the distance between RCSj and the nearest substation in km, Cx-former is the step-down transformer cost,
is the transformer cost in $/KVA, VAj is the transformer rating based on the load demand of RCSj, Coper implies the operational cost, and
stands for the costs of materials, maintenance, and staff salaries of RCSj. Therefore, the normalized total BU cost (BUnorm) can be derived from Eq (11) as
(15)
where BUmax is the maximum cost when all RCSs are selected.
SEL cost.
Power follows a pattern change, which is due to the nonlinear behavior of EV charging, when a new RCS is connected to a substation. An EV charging system generally injects fundamental and multiple harmonic currents into a distribution network with different magnitudes and phase angles at various frequencies. When EVs are charged, RCSs are considered loads for a substation and induce additional power loss.
The EV load (LEV) for RCSj is calculated as
(16)
where Pr is the power requirement for each EV battery.
Additional power loss APLEV due to RCS is then obtained as
(17)
where TPLEV and TPLh are the power losses with EV loads induced by fundamental and harmonic currents, respectively, when RCSs are connected to a substation with the original load; TPLorigin is the total power loss without connected RCS load; and Nh is the number of odd harmonics.
The SEL cost for a substation (busj) with EV load is obtained as
(18)
where tef, j is the effective operating hours of RCSs connected to busj. tef is important to accurately calculate the power loss of a substation. Hence, tef for charging EVs via busj is formulated as
(19)
where tevj indicates the total number of EVs charged via busj, tcj denotes the total number of chargers connected to busj, and T is the average charging time of an EV battery.
The normalized total SEL cost (SELnorm) is expressed as
(20)
where Nbus is the number of bus, and SELmax is the maximum SEL cost.
The weighted sum method is used to aggregate Eqs (8), (15) and (20) to form the overall objective function. Thus, the final multi-objective function for solving the optimization problem is expressed as
(21)
All the sub-objective functions in Eq (21) are transformed into per-unit functions by normalizing each component to keep the values between 0 and 1. In Eq (21), wi represents the fixed-weight factors defined to the individual sub-objective function, where ∑wi = 1 and 0<wi<1. The same weight factors (wi = 1/3) are considered for all sub-objectives to ensure equal priority.
System constraints
The following constraints should be fulfilled during objective function evaluation to obtain the optimal number of RCSs. An RCS is essential for EVs. Therefore, at least one RCS should be selected from the predefined possible locations where RCS should be placed, as follows:
(22)
Moreover, at least one charger should be considered for each selected RCS, as follows:
(23)
The permitted capacity of RCSj should not exceed the maximum allowable capacity for each station, as follows:
(24)
where
is the maximum capacity of RCSj.
The allowable voltage limits for each bus to maintain power system voltage stability are regarded as
(25)
The allowable power limits for each distribution line are regarded as
(26)
where Pl is the apparent power, line l must not exceed its maximum thermal limits, Pl-max denotes under steady-state operation, and Nline is the number of distribution lines.
BLSA as an optimization tool
An important issue in an optimization algorithm is that a single algorithm cannot find the best solution for all real-world optimization problems. Hence, new optimization algorithms must be continuously searched to advance the field of computational intelligence optimization. BLSA is a novel metaheuristic optimization algorithm that was first introduced by Islam et al. [23] based on the mechanism of step leader propagation by using the concept of fast particles, also known as projectiles. In BLSA, three projectile types, namely, the transition projectiles that create the first step leader population, the space projectiles (PS) that attempt to become the leader, and the lead projectile (pL) that represents the projectile fired from the best-positioned step leader, are used. The updating procedure for space projectiles is expressed as
(27)
where exprand is an exponential random number, and μi represents the distance between the lead projectile pL and the space projectile
under consideration.
The updated position of pL at step+1 can be written as
(28)
where normrand is a random number generated by the normal distribution function, and μL is the current value of pL and is the scale parameter that exponentially decreases as it finds the best solution. The detailed BLSA can be found in [23]. Space and lead projectile positions are initially determined for BLSA according to Eqs (27) and (28), respectively. A suitable probability function should be defined to force the projectile to make one of two decisions, “0” or “1,” to update each projectile position in BLSA. In this study, the probability transfer function Tf (pi) is designed according to Eq (29) to map a binary search space. By contrast, the projectile position at step+1 is updated following the probability function with a condition shown in Eq (30).
(29)
(30)
where rand is a uniform random variable in interval [0, 1].
The proposed BLSA technique is utilized to minimize the proposed objective function given in Eq (21) subject to the constraints in Eqs (22)–(26) to determine the optimal placement and sizing of an RCS in the adjoining township of Bangi, Malaysia. Fig 3 presents the implementation procedure for determining the optimal placement and sizing of an RCS using BLSA.
Implementation procedure for obtaining the optimal placement and sizing of an RCS using BLSA.
Description of road and power system networks
Road and power system networks are described in detail in this section. A road network is where an RCS is likely to be installed, whereas a power system network is where an RCS can obtain electric power.
Road network
The geographical area considered for RCS placement is the 256 km2 area in the adjoining township of Bangi, Malaysia, as shown in Fig 4. The figure presents the population density, number of EVs, and land price. A total of 1000 EVs (Table A in S1 File) are considered to be charged each day. EV locations in the entire area are generated depending on the population density of particular areas. The area is urban, and 20 RCSs (Table B in S1 File) are assumed to be possible if they are placed at a distance of approximately 2.5 km from one another. Fig 5 shows the road network in the adjoining township of Bangi, Malaysia considered for optimal RCS placement study. In Fig 5, the green rectangle shows the location of RCSs considered in this study. Table 2 presents the parameters utilized to calculate the objective function.
View of adjoining township of Bangi, Malaysia.
Predefined RCS locations in the adjoining township of Bangi, Malaysia.
Power system
EV charging systems produce harmonic pollution problems in the distribution system. These harmonics generally increase power losses due to the amplified root-mean-square value of the current in power lines. In this study, backward/forward sweep-based harmonic power flow is used to calculate power loss in the IEEE 34-bus test systems [25]. EVs are assumed to be connected in this bus system during rapid charging. Fig 6 shows the IEEE 34-bus radial test systems. No RCS is currently available in Malaysia; therefore, the data of injected harmonic current magnitudes and angles for the Nissan Leaf for rapid charging are obtained from Watson et al. [26].
IEEE 34-bus radial test system with original RCS loads.
Test results and discussion
The BLSA technique is applied by using the proposed objective function to determine optimal RCS placement and sizing. The results of the proposed BLSA are compared with the results of GA and binary PSO (BPSO). For the same purpose, BLSA is also implemented by using the conventional objective function developed in [24] for the same road network and power system, and the results are compared with those of GA and BPSO. For a fair comparison, population size and maximum iteration are set as 80 and 50, respectively, in all cases. The BLSA algorithm-dependent parameter, i.e., channel time, is set as 10; the selection and mutation rates are set as 0.5 and 0.07, respectively, for GA; and c1, c2, minimum weight, and maximum weight are set as 1, 1, 0.2, and 0.9, respectively, for BPSO. The results of using this function are compared with the results of using the conventional function to evaluate the effectiveness of the proposed objective function in optimal RCS planning.
Test results for optimal RCS placement and sizing
This section presents the optimization results of RCS placement and sizing by using the proposed and conventional objective functions. Table 3 shows the three objectives that consider possible combinations of sub-objective functions. The sign (√) that shows a particular sub-objective function is considered in the optimization problem, and the symbol (×) indicates that the sub-objective function is not considered in the problem. Table 4 provides the best optimization results of optimal RCS planning by using the proposed and conventional objective functions obtained using the BLSA, GA, and BPSO techniques. The shaded figure shown in Table 4 corresponds to the components that are not considered in the objective function during optimization. The results of using the proposed and conventional objective functions for the three objectives are summarized as follows.
Objective 1.
In Objective 1, the desired objective function is to minimize BU, TEL, and SEL costs. The results of the proposed objective function in Table 4 show that BU cost provides 52% (0.1891 pu) of the total cost, whereas TEL and SEL costs constitute over 38% (0.1383 pu) and 10% (0.0368 pu) of the total cost, respectively. The BLSA techniques, using the proposed objective function, identify six RCSs to be installed at locations 2, 4, 7, 13, 17, and 19 based on the lowest fitness value to cover the entire area, as shown in Fig 7A. The balloon marker represents the EV positions, whereas the different colors characterize the group of EV locations to the nearest RCS based on time taken to reach an RCS. The corresponding station capacities are 288, 480, 192, 384, 384, and 288 kW, as shown in Table 4. This table also indicates that power losses without and with only EV loads are 221.7 kW and 69.98 kW, respectively. The BLSA techniques, using the conventional objective function, identify 10 RCSs, as shown in Fig 7B. In the figure, the blue points indicate the EV positions, whereas the red lines represent the Euclidean distance of EVs to the nearest RCS. The contributions of BU, TEL, and SEL costs to the total cost are 55%, 39%, and 6%, respectively. In the conventional objective function, the power loss due to only EV load is 43.43 kW because harmonic currents are not considered.
(a) Location of RCSs for Objective 1 using proposed objective function and (b) Location of RCSs for Objective 1 using conventional objective function.
The total cost of using the proposed objective function decreases by over 10% compared with that using the conventional objective function, in which BU cost decreases by over 15% because of four less RCSs. The TEL cost decreases by over 12% in spite of the fewer number of RCSs than that using the conventional objective function.
Objective 2.
Objective 2 assumes that the power system loss component is insignificant in RCS planning. The total cost of Objective 2 increases by more than 26% with SEL cost compared with the normalized results of the proposed objective function, as shown in Table 4. However, the number of RCSs decreases from 10 to 4, as shown in Fig 8A. Total power loss sharply increases from 291.68 kW to 475.9 kW, in which the loss incurred by only EV loads is 254.2 kW. Compared with Objective 1, Objective 2 presents exactly the same total cost as using the conventional objective function.
(a) Location of RCSs for Objective 2 using proposed objective function and (b) Location of RCSs for Objective 2 using conventional objective function.
In Objective 2, the number of optimal RCSs is identified based on TEL and BU costs. The total costs of TEL and BU using the proposed objective function are reduced by 15%, in which TEL cost is reduced by 8% due to the fewer number of RCSs than that using the conventional objective function.
Objective 3.
The effect of TEL cost is disregarded in Objective 3. The comparison of the results of Objectives 3 and 1 shows that the same number of RCSs but slightly different RCS locations are identified by the BLSA techniques using the proposed objective function, as shown in Table 4 and Fig 9A. Only one large RCS is identified at optimal location 7 by using the conventional objective function, as shown in Fig 9B, with 1920 kW capacity.
(a) Location of RCSs for Objective 3 using proposed objective function and (b) Location of RCSs for Objective 3 using conventional objective function.
The total costs of SEL and BU by using the conventional objective function decrease by 20% compared with those by using the proposed objective function because only one RCS is identified for the conventional objective function. Only one RCS is selected because EV SOC is not considered. In such case, an EV can reach any RCS location although it is far from the EV position. However, this assumption is considered unrealistic.
Table 5 shows the performance of the BLSA, GA, and BPSO techniques in determining the optimal placement and sizing of RCS in relation to fitness value, optimized number of RCS, consistency of results, and minimum number of iterations in which the optimization results start to converge with the best fitness value. All the optimization techniques are executed 30 independent times by using the proposed and conventional objective functions for each objective. The performance of these optimization techniques is also depicted in Fig 10A and 10B.
(a) Convergence characteristic curves of the BLSA, GA, and BPSO techniques in solving Objectives 1, 2, and 3 using proposed objective function and (b) Convergence characteristic curves of the BLSA, GA, and BPSO techniques in solving Objectives 1, 2, and 3 using conventional objective function.
Table 5 indicates that the BLSA, GA, and BPSO techniques can determine the best fitness value for Objective 1 by using the proposed and conventional objective functions. However, the BSLA technique (93.3% and 86.6%) is more consistent than the GA technique (90% and 83.3%) and the BPSO technique (13.3% and 30%). The BLSA requires less computational times and exactly half and one-third iterations compared with those of GA and BPSO, respectively, to determine the best fitness value for the proposed objective function, as shown in Fig 10A and Table 5. BLSA also requires less number of iterations and computational time (7 iterations and 1629.95 s) than those of GA (9 iterations and 1746.74 s) and BPSO (12 iterations and 1692.09 s) for the conventional objective function, as shown in Fig 10B and Table 5.
For the results of Objectives 2 and 3 shown in Table 5 and Fig 10A and 10B, BLSA is more consistent and requires less number of iterations and computational times than GA and BPSO by using the proposed and conventional objective functions.
The optimal placements of RCSs connected in the IEEE 34-bus test system for each objective using the proposed and conventional objective functions are shown in Fig 11. The green rectangle indicates the RCS optimal location number, as shown earlier in Fig 6. The black, red, and gray rectangles represent the optimal RCS locations obtained using the proposed objective function, whereas the blue, orange, and olive green rectangles represent the optimal RCS locations obtained using the conventional objective function for Objectives 1, 2, and 3, respectively.
Optimal RCS loads for Objectives 1, 2, and 3 using the proposed and conventional objective functions.
Discussion
The comparison between the total costs of the proposed and conventional objective functions shows that the total cost of Objective 1 for both objective functions is less than those of all the other objectives. In Objective 1, however, the total cost of using the proposed objective function decreases by over 10% compared with that of using the conventional objective function. Therefore, Objective 1 of the proposed objective function can be utilized by decision makers to consider and minimize all costs that arise from different situations. Objectives 2 and 3 are unrealistic. For Objective 2, SEL cost as a result of enormous power loss during rapid charging is inevitable. For Objective 3, EV users need to travel a long distance and pay high recharging fees. Hence, TEL and SEL costs should be considered in RCS planning for the convenience of EV users and RCS developers.
Conclusion
This study suggests a novel approach for optimal RCS placement and sizing by considering Google Maps API, battery SOC, traffic density, and harmonic load flow. The optimization problem is formulated by relying on three cost functions (TEL, BU, and SEL) and is solved by utilizing the BLSA technique. The optimization technique is also applied by using the conventional objective function under the same road and power networks. The results of the proposed technique using the proposed and conventional objective functions are compared with the results of GA and BPSO. The outcomes of the proposed objective function are compared with the outcomes of the conventional objective function. The case study shows that the proposed optimization technique and the proposed objective function can be beneficial for EV users and RCS developers in determining optimal RCS placement and sizing with minimum total cost and without stressing the power grid.
Supporting information
S1 File.
Table A. Electrical vehicles (EVs) location addresses. Table B. Rapid charging stations (RCSs) location addresses.
https://doi.org/10.1371/journal.pone.0189170.s001
(DOCX)
References
- 1.
Ge S, Feng L, Liu H. The planning of electric vehicle charging station based on grid partition method. In Proc. 11th IEEE Electrical and Control Engineering Conference. 2011; 2726–2730.
- 2.
Zi-fa L, Wei Z, Xing J, Ke L. Optimal planning of charging station for electric vehicle based on particle swarm optimization. In Proc. IEEE Innovative Smart Grid Technologies Conference. 2012; 1–5.
- 3.
Andrews M, Dogru MK, Hobby JD, Jin Y, Tucci H. Modeling and optimization for electric vehicle charging infrastructure. In Proc. IEEE Innovative Smart Grid Technologies Conference. 2013; 1–10.
- 4.
Jia L, Hu Z, Liang W, Tang W, Song Y. A novel approach for urban electric vehicle charging facility planning considering combination of slow and fast charging. International Conference on Power System Technology. 2014; 3354–60.
- 5.
Yan X, Duan C, Chen X, Duan Z. Planning of electric vehicle charging station based on hierarchic genetic algorithm. Transportation Electrification Asia-Pacific (ITEC Asia-Pacific), IEEE Conference and Expo. 2014; 1–5.
- 6. Islam MM, Shareef H, Mohamed A. Optimal quick charging station placement for electric vehicles. Appl Mech Mate. 2015; 785: 697–701.
- 7. Zhang L, Wang Z, Hu X, Sun F, Dorrell DG. A comparative study of equivalent circuit models of ultra-capacitors for electric vehicles. J Power Sources. 2015; 274: 899–906.
- 8. Zhang L, Hu X, Wang Z, Sun F, Dorrell DG. Fractional-order modeling and State-of-Charge estimation for ultra-capacitors. J Power Sources. 2016; 314: 28–34.
- 9. Kou LF, Liu ZF, Zhou H. Modeling algorithm of charging station planning for regional electric vehicle. Modern Electric Power. 2010; 27:44–48.
- 10. Hua X, Martinez CM, Yang Y. Charging, power management, and battery degradation mitigation in plug- in hybrid electric vehicles: A unified cost-optimal approach. Mech Syst Signal Pr. 2017; 87: 4–16.
- 11. Hu X, Moura SJ, Murgovski N, Egardt B, Cao D. Integrated optimization of battery sizing, charging, and power management inp-in hybrid electric vehicles. IEEE Trans. Control Syst Tech. 2016; 24: 1036–1043.
- 12. Wang G, Xu Z, Wen F, Wong KP. Traffic-constrained multi-objective planning of electric vehicle charging stations. IEEE Trans. Power Deliver. 2013; 28: 2363–2372.
- 13.
Dharmakeerthi CH, Mithulananthan N, Saha TK. Modeling and planning of EV fast charging station in power grid. IEEE Power and Energy Society General Meeting, San Diego. 2012: 1–8.
- 14. Dharmakeerthi CH, Mithulananthan N, Saha TK. Impact of electric vehicle fast charging on power system voltage stability. Int. J Elec Power Energ. System. 2014; 57: 241–249.
- 15. Liu Z, Wen F, Ledwich G. Optimal planning of electric-vehicle charging stations in distribution systems. IEEE Trans. Power Deliver. 2013; 28: 102–110.
- 16. Phonrattanasak P, Leeprechanon N. Optimal location of fast charging station on residential distribution grid. Int. J. Innovation Management Technol. 2012; 3: 675–681.
- 17. Islam MM, Shareef H, Mohamed A. A review of techniques for optimal placement and sizing of electric vehicle charging stations. Elect. Review. 2015; 91: 122–126.
- 18. Shareef H, Islam MM, Mohamed A. A review of stage of art electric vehicle charging technologies, placement methodologies and various impacts. Renew. Sustain. Energy Rev. 2016; 64: 403–420.
- 19. Hu X, Zou C, Zhang C, Li Y. Technological developments in batteries: a survey of principal roles, types, and management needs. IEEE Power Energy Magazine. 2017; 15(5): 20–31.
- 20. Wu X, Hu X, Moura S, Yin X, Pickert V. Stochastic control of smart home energy management with plug-in electric vehicle battery energy storage and photovoltaic array. J Power Sources. 2016; 333: 203–212.
- 21. Wu X, Hu X, Teng Y, Qian S, Cheng R. Optimal integration of a hybrid solar-battery power source into smart home nanogrid with plug-in electric vehicle. J Power Sources. 2017; 363: 277–283.
- 22. Islam MM, Shareef H, Mohamed A. Optimal siting and sizing of rapid charging station for electric vehicles considering Bangi city road network in Malaysia. Turk J Elect Eng. Comput. Sci. 2016; 24: 3933–3948.
- 23. Islam MM, Shareef H, Mohamed A, Wahyudie A. (2016). A binary variant of lightning search algorithm: BLSA. Soft Compt. 2017; 21: 2971–2990.
- 24. Barzani PS, Ghahnavieh AR, Karegar HK. Optimal fast charging station placing and sizing. Appl. Energ. 2014; 125: 289–299.
- 25. Teng JH, Chang CY. Backward/Forward Sweep-Based Harmonic Analysis Method for Distribution Systems. IEEE Trans. Power Deliver. 2007; 22: 1665–1672.
- 26.
Watson NR, Watson JD, Watson RM, Sharma K, Santos-Martin D, Lemon S, Wood A, Miller A. Impact of electric vehicle chargers on a low voltage distribution system. In Proc. EEA Conference and Exhibition, 2015; 1–28.