Fig 1.
Markov model.
Table 1.
Cost-utility analysis results.
Fig 2.
Tornado diagram of CAPD + ICO method.
Fig 3.
Tornado diagram of APD method.
Fig 4.
Cost-effectiveness acceptability curve from the base-case analysis.
Fig 5.
Cost-effectiveness acceptability curve based on data from Yang et al.‘s study in Singapore.
Fig 6.
Cost-effectiveness plane.
Fig 7.
Model validation results.