Fig 1.

An illustration of preceding and succeeding sets of blocks for a base block .

More »

Fig 1 Expand

More »

Expand

Fig 2.

Section view of the mining-based perturbation for swapping the mining periods of blocks and .

More »

Fig 2 Expand

Fig 3.

Graphical representations of different perturbations.

More »

Fig 3 Expand

Table 1.

Block model and waste dump parameters.

More »

Table 1 Expand

Table 2.

Economic and technical parameters.

More »

Table 2 Expand

Table 3.

Operational parameters (capacities per period).

More »

Table 3 Expand

Table 4.

Number of variables and constraints before and after applying the variable reduction technique.

More »

Table 4 Expand

Table 5.

Performance evaluation of the proposed algorithm compared to the exact method.

More »

Table 5 Expand

Table 6.

Production plan produced by the exact method for Case A.

More »

Table 6 Expand

Table 7.

Production plan produced by the SA-based algorithm for Case A.

More »

Table 7 Expand

Fig 4.

Evolution of NPV over execution time.

More »

Fig 4 Expand

Fig 5.

The distribution of NPV improvement instances across different perturbation types.

More »

Fig 5 Expand

Fig 6.

Change in temperature with improvement in NPV.

More »

Fig 6 Expand

Table 8.

Material flows produced by the initial solution (HVS heuristic).

More »

Table 8 Expand

Table 9.

Material flows produced by the proposed SA-based algorithm.

More »

Table 9 Expand

Fig 7.

Cut-off grade in each period before and after SA.

More »

Fig 7 Expand