Fig 1.

Relationship diagram of virtual and physical commissioning.

More »

Fig 1 Expand

Fig 2.

Design process of DT-based electrical control system.

More »

Fig 2 Expand

Fig 3.

DT maturity evaluation factors.

More »

Fig 3 Expand

Table 1.

Maturity factors essential for control system design.

More »

Table 1 Expand

Fig 4.

EET Basic software interface.

More »

Fig 4 Expand

Fig 5.

Elevator composition diagram.

More »

Fig 5 Expand

Fig 6.

The overall flowchart of the control program.

More »

Fig 6 Expand

Fig 7.

EET Basic software configuration.

More »

Fig 7 Expand

Fig 8.

S7-PLCSIM Advanced software configuration.

More »

Fig 8 Expand

Fig 9.

TIA Portal software configuration.

More »

Fig 9 Expand

Fig 10.

Data exchange configuration.

More »

Fig 10 Expand

Fig 11.

Operational interface of EET Basic.

More »

Fig 11 Expand

Fig 12.

Scoring interface of elevator virtual commissioning.

More »

Fig 12 Expand

Fig 13.

Results of iterative commissioning.

More »

Fig 13 Expand