Skip to main content
Advertisement
Browse Subject Areas
?

Click through the PLOS taxonomy to find articles in your field.

For more information about PLOS Subject Areas, click here.

< Back to Article

Fig 1.

Corporate operational risk early warning indicator system.

More »

Fig 1 Expand

Fig 2.

The construction process of the FCM clustering algorithm.

More »

Fig 2 Expand

Fig 3.

Construction process of RF.

More »

Fig 3 Expand

Table 1.

The parameter settings of the RF algorithm after parameter optimization.

More »

Table 1 Expand

Fig 4.

CRITIC weight calculation results for corporate operational risk warning indicators.

More »

Fig 4 Expand

Fig 5.

Clustering evaluation results of the FCM algorithm.

More »

Fig 5 Expand

Fig 6.

The membership distribution of various indicators in different risk categories by the FCM algorithm (Note: Clustering categories (Medium risk (2, 3)/ High risk (5)/ Risk-free (1)/ Low risk (4)).

More »

Fig 6 Expand

Fig 7.

Corporate operational risk indicator statistical differences results.

More »

Fig 7 Expand

Table 2.

Model performance comparison under different parameter settings.

More »

Table 2 Expand

Fig 8.

Parameter optimization results of the RF model improved by FCM clustering.

More »

Fig 8 Expand

Fig 9.

Risk prediction results of the RF model improved by FCM clustering ((a) Different risk prediction results; (b) Prediction results of different models).

More »

Fig 9 Expand

Fig 10.

Feature importance ranking results of model risk indicators.

More »

Fig 10 Expand

Table 3.

The robustness test results of the model.

More »

Table 3 Expand