Fig 1.
Grid point of the traditional ε-constraint method.
Fig 2.
Flow chart of simplex search algorithm.
Fig 3.
IEEE-33 bus system.
Fig 4.
Forecast active power of wind farm and photovoltaic plant.
Table 1.
Participation of all users in orderly power utilization.
Table 2.
Results of single objective optimization.
Table 3.
Comparison of multi-objective optimization results.
Table 4.
Results of orderly power utilization under different power shortages.