Fig 1.
Flowchart.
Fig 2.
The PN of domestic ARIFT incoming operation process.
Table 1.
Meanings of places and transitions in PN of domestic ARIFT incoming operations.
Fig 3.
The adjacency matrix A for the ARIFT incoming operations process of PN model.
Table 2.
Selection, synchronization, concurrency, conflict relationships in the PN model.
Fig 4.
MC of incoming operation process in ARIFT.
Table 3.
Operation time of each transition in ARIFT for incoming operation process.
Table 4.
Operational time and implementation rate for each transition in ARIFT.
Table 5.
Marking states and included places in PN for incoming operation in ARIFT.
Table 6.
Marking probability of PN for ARIFT incoming operation.
Table 7.
Occupancy rate of places in PN for ARIFT incoming operation.
Table 8.
ECRS principles.
Table 9.
Principles of reorganization and optimization of the adjacency matrix.
Fig 5.
PN of optimized domestic inbound operations process in ARIFT.
Table 10.
Meanings of places and transitions in the optimized PN for domestic incoming operations in ARIFT.
Fig 6.
MC of the optimized incoming ARIFT.
Table 11.
Operation time for each link in the optimized incoming ARIFT.
Table 12.
Operation time and implementation rate for each link in the optimized incoming ARIFT.
Table 13.
Marking states and included places in PN for incoming operation ARIFT.
Table 14.
Marking probability in PN for optimized incoming ARIFT.
Table 15.
Place occupancy rate in PN for optimized incoming ARIFT.
Table 16.
Comparison of performance indicator of incoming operation before and after optimization.