Skip to main content
Advertisement
Browse Subject Areas
?

Click through the PLOS taxonomy to find articles in your field.

For more information about PLOS Subject Areas, click here.

< Back to Article

Fig 1.

Map of Tuojiang River basin (the map was created by our team using standard maps obtained from the Ministry of Natural Resources of the People’s Republic of China (https://www.mnr.gov.cn/) using ArcMap 10.8).

These maps with approval numbers can be accessed free of charge from the agency’s public website GS(2023)2765 (http://bzdt.ch.mnr.gov.cn /browse.html?picId = %224o28b0625501ad13015501ad2bfc2190%22), Sichuan S(2021)00056 (https://scsm.mnr.gov.cn/StandMaps/mapDetails.html).

More »

Fig 1 Expand

Fig 2.

Overall methodological framework.

More »

Fig 2 Expand

Fig 3.

Water demand in the Tuojiang River basin from 2005 to 2020.

More »

Fig 3 Expand

Table 1.

Water demand forecasting indicator system.

More »

Table 1 Expand

Table 2.

Descriptive statistics of data.

More »

Table 2 Expand

Fig 4.

Flow chart of the GA-BP neural network.

More »

Fig 4 Expand

Fig 5.

Comparison of boxplot before and after outlier processing.

More »

Fig 5 Expand

Fig 6.

Correlation heatmap of parameters influencing water demand.

More »

Fig 6 Expand

Table 3.

Main parameter of the artificial intelligence models.

More »

Table 3 Expand

Fig 7.

Comparison of predicted and actual values based on (a)GA-BP; (b)GPR; (c)SVR; (d)ELM; (e)RF for agricultural water demand.

More »

Fig 7 Expand

Table 4.

Performance evaluation results for each model for agricultural water demand.

More »

Table 4 Expand

Fig 8.

Comparison of predicted and actual values based on (a)GA-BP; (b)GPR; (c)SVR; (d)ELM; (e)RF for industrial water demand.

More »

Fig 8 Expand

Table 5.

Performance evaluation results for each model for industrial water demand.

More »

Table 5 Expand

Fig 9.

Comparison of predicted and actual values based on (a)GA-BP; (b)GPR; (c)SVR; (d)ELM; (e)RF for domestic water demand.

More »

Fig 9 Expand

Table 6.

Performance evaluation results for each model for domestic water demand.

More »

Table 6 Expand

Fig 10.

Comparison of predicted and actual values based on (a)GA-BP; (b)GPR; (c)SVR; (d)ELM; (e)RF for ecologial water demand.

More »

Fig 10 Expand

Table 7.

Performance evaluation results for each model for ecological water demand.

More »

Table 7 Expand

Fig 11.

Map of water demand in the Tuo River basin in 2025 ((the map was created by our team using standard maps obtained from the Ministry of Natural Resources of the People’s Republic of China (https://www.mnr.gov.cn/) using ArcMap 10.8)).

These maps with approval numbers can be accessed free of charge from the agency’s public website GS(2023)2765 (http://bzdt.ch.mnr.gov.cn /browse.html?picId = %224o28b0625501ad13015501ad2bfc2190%22), Sichuan S(2021)00056 (https://scsm.mnr.gov.cn/StandMaps/mapDetails.html).

More »

Fig 11 Expand

Table 8.

Comparison of water demand of six regions in 2020 and 2025.

More »

Table 8 Expand