Fig 1.
Number of fatal construction accidents from 2010 to 2021.
Fig 2.
Stakeholders in assembly construction.
Fig 3.
Research flow.
Table 1.
Assembly construction risk factors.
Fig 4.
Initial AC risk framework.
Table 2.
The profile of respondents (N = 396).
Table 3.
Variable reliability index value.
Fig 5.
Final AC risk framework.
Table 4.
Total effects of the final model.
Table 5.
SEM fit summary.
Table 6.
CRITIC weighting results.
Fig 6.
Ranking the importance of AC risk factors.
Fig 7.
Results of case analysis.
Table 7.
Accident path verification.