Table 1.
Studies about investment risk assessment of FDI.
Fig 1.
The evaluation index system.
Fig 2.
General framework for FDI risk evaluation.
Table 2.
The probabilistic linguistic decision matrix.
Table 3.
The normalized probabilistic linguistic decision matrix in ascending order.
Table 4.
The probabilistic linguistic ideal solutions.
Table 5.
The distance between the PLTSs.
Table 6.
The values of PLGUi, PLIRi, and PLCi.
Table 7.
The ranking results based on the different values of θ.
Table 8.
The distance between the PLTSs when the parameters λ = 1,2,3,4,5, respectively.
Table 9.
Closeness coefficients.
Table 10.
The results by using the aggregation operators.