Fig 1.
Current gas monitoring system in the case study mine.
(Wu et al. 2021, p.3180) [46].
Fig 2.
Organizational chart of the project stakeholder.
Table 1.
Descriptive information on focus group studies.
Table 2.
A description of demographic data collected.
Fig 3.
A three-layer architecture for demonstrating the proposed system.