Table 1.
Implementation process with the Global Trigger Tool.
Table 2.
Adapted and original feasibility criteria from the study and Orsmond and Cohn [26].
Table 3.
The level of challenge is identified by the feasibility criteria for the implementation of the GTT.
Table 4.
Recommendations regarding the facilitators (F) and the obstacles (O) in the GTT-implementation process.