Fig 1.
Parallel simulation and optimization framework based on RSS-PeMS.
Fig 2.
General simple manufacturing process model [25].
Fig 3.
Emergency production process simulation model.
Table 1.
Real scenario elements and simulation model elements corresponding to FlexSim.
Fig 4.
Parallel implementation mechanism for surging demand.
Table 2.
Processing time of each process.
Fig 5.
Production line scenario simulation model.
Fig 6.
Scenario staging area "Time-Capacity".
Fig 7.
Scenario 0 (left), Model 0 (right) Staging Area "Time-Capacity".
Fig 8.
Model 0~Model 4 demand trend evolution.
Fig 9.
Comparison of AvgWIP and AvgStaytime before and after Model 4 optimization.
Fig 10.
Model 5 staging area "Time-Capacity".