Fig 1.

Classification of NIMBY facilities.

The column on the left of the picture shows the criteria for the classification of NIMBY facilities. The column on the right of the picture is a detailed description of the classification of NIMBY facilities.

More »

Fig 1 Expand

Table 1.

PPP operation mode.

More »

Table 1 Expand

Fig 2.

Confirmation process of the index system.

The picture shows the confirmation process of the index system from top to bottom. It is worth noting that if the experts have different opinions on the 30 indicators, they will re-discuss and re-score them until they reach a consensus and proceed to the next step.

More »

Fig 2 Expand

Table 2.

Operation method measurement standard system of NIMBY facility PPP projects.

More »

Table 2 Expand

Table 3.

The relative importance of a standard.

More »

Table 3 Expand

Table 4.

NIMBY facility PPP project operation mode selection measurement index weight.

More »

Table 4 Expand

Table 5.

Relative progress of each mode of operation πi.

More »

Table 5 Expand

Table 6.

Information of the experts.

More »

Table 6 Expand

Table 7.

Comparison of the results of different methods.

More »

Table 7 Expand