Fig 1.
China National Grid.
Fig 2.
The Grid scheduling architecture.
Table 1.
Grid job Ai characteristics.
Fig 3.
A data transfer bandwidth variance curve.
Fig 4.
The application-aware periodic job scheduling flow.
Table 2.
The settings of simulated Grid computing center.
Table 3.
Three jobs characteristics.
Table 4.
The experimental results of job transmission time prediction.
Fig 5.
Performance impact of jobs with 60 scheduling points.
(a) Total Processing Time; (b) Average Processing Time; (c) Makespan; (d) Job Rejection Ratio.
Fig 6.
Performance impact of jobs with 120 scheduling points.
(a) Total Processing Time; (b) Average Processing Time; (c) Makespan; (d) Job Rejection Ratio.