Fig 1.
The railway service network.
Fig 2.
Beijing-Guangzhou railway line.
Fig 3.
Service network for testing the model.
Table 1.
Information on the shipments.
Table 2.
Information on the train services.
Table 3.
The average transfer time of Wuhan North Station and Hengyang North Station from 2005 to 2014.
Table 4.
Transfer time between arc m and arc n.
Table 5.
Results of the car-to-train assignment.
Table 6.
Workloads of the express train arcs.
Fig 4.
Assignment results of a part of the arcs.