Fig 1.
Map of the Mara River Basin, catchments and sites.
Fig 2.
Stage height to discharge rating curves for Emarti extrapolated over the full range of measured stage height.
Outliers that were removed are presented as a triangle. 95% confidence intervals are in red.
Fig 3.
Stage height to discharge rating curves for December 2012 –December 2014 at NMB extrapolated over the full range of measured stage height.
Outliers that were removed are presented as a triangle. 95% confidence intervals are in red.
Fig 4.
Turbidity to suspended sediment concentration rating curve for Emarti and NMB.
95% confidence interval is shaded in red.
Fig 5.
Hydrograph for Emarti and NMB during/across eight time blocks from 2011 to 2014.
Table 1.
Monthly mean discharge (m3 s-1), lower and upper 95% confidence intervals (CI), minimum discharge, maximum discharge and coefficient of variation (CV) for Emarti and NMB.
Table 2.
Richards-Baker Flashiness Index.
Fig 6.
Turbidity from Emarti and NMB during the eight time blocks from 2001 to 2014.
Fig 7.
Mean monthly suspended sediment flux (tonne day-1) for Emarti and NMB sites.
95% confidence intervals are provided.
Table 3.
Sediment yields.
Table 4.
Hippo pool sampling summary statistics.