Skip to main content
Advertisement
Browse Subject Areas
?

Click through the PLOS taxonomy to find articles in your field.

For more information about PLOS Subject Areas, click here.

< Back to Article

Fig 1.

Grid-based diversity maintenance mechanism of Pareto front.

More »

Fig 1 Expand

Fig 2.

Interval division of wind power generation.

More »

Fig 2 Expand

Fig 3.

The obtained Pareto front of AGB-MOCDE and MODE.

More »

Fig 3 Expand

Table 1.

The memberships of non-dominated schemes by AGB-MOCDE and MODE for test system 1.

More »

Table 1 Expand

Table 2.

The comparisons among different optimization methods.

More »

Table 2 Expand

Fig 4.

The output process of compromise scheme by AGB-MOCDE in test system 1.

More »

Fig 4 Expand

Table 3.

The transmission loss of five thermal-unit system.

More »

Table 3 Expand

Fig 5.

Pareto front obtained by AGB-MOCDE and MODE.

More »

Fig 5 Expand

Table 4.

The membership of non-dominated schemes between AGB-MOCDE and MODE for test system 2.

More »

Table 4 Expand

Table 5.

The comparison among different optimization methods for the DEED problem.

More »

Table 5 Expand

Table 6.

The output (MW) details of the compromise scheme obtained by AGB-MOCDE for test system 2.

More »

Table 6 Expand

Fig 6.

Interval division of output domain for wind farm #1.

More »

Fig 6 Expand

Fig 7.

Interval division of output domain for wind farm #2.

More »

Fig 7 Expand

Fig 8.

Interval division of output domain for wind farm #3.

More »

Fig 8 Expand

Fig 9.

The obtained optimal schemes in two extreme cases and in stochastic DEED.

More »

Fig 9 Expand

Table 7.

The output (MW) details of the optimal scheme of AGB-MOCDE in extreme case 1.

More »

Table 7 Expand

Table 8.

The output (MW) details of the optimal scheme of AGB-MOCDE in extreme case 2.

More »

Table 8 Expand

Table 9.

The output (MW) details of the optimal scheme of AGB-MOCDE in stochastic DEED.

More »

Table 9 Expand