Fig 1.
Testing timeline: testing period at baseline and after the intervention.
ST = experimental group (performing ST + soccer training from week 2–7; SO = soccer training group (soccer training from week 2–7).
Table 1.
Baseline and post intervention values for YoYo IR1, CV, D' and 30-m sprint performances (±SD) for the experimental and control group (P < 0.05).