Figure 1.

The various methods previously used in transportation of specimen.

More »

Figure 1 Expand

Figure 2.

The recommended turnaround time measured as the time from collection of a sample to receipt of the results was about 28

More »

Figure 2 Expand

Figure 3.

Estimated costs different aspects of sample analysis.

More »

Figure 3 Expand

Figure 4.

The local network that is covered by each bike.

More »

Figure 4 Expand

Figure 5.

The cost in 2010 before the network was started compared to when additional costs for start up of the transport network were added.

More »

Figure 5 Expand

Figure 6.

The projected 4 year costs once the transport network is established.

More »

Figure 6 Expand

Figure 7.

The cost at each of the 19 hubs before and after the initiation of the National sample referral transport network (NSRTN).

More »

Figure 7 Expand

Figure 8.

How Turnaround Time reduced; sample and result transit time dropped from 49 days before lab consolidation to 26 day and from 26 to 14 days due to the NSRTN.

More »

Figure 8 Expand

Figure 9.

Turnaround times for the facilities before the introduction of the transport network in July 2011.

The recommended turnaround time measured as the time from collection of a sample to receipt of the results was about 28

More »

Figure 9 Expand