Skip to main content
Advertisement
Browse Subject Areas
?

Click through the PLOS taxonomy to find articles in your field.

For more information about PLOS Subject Areas, click here.

< Back to Article

Figure 1.

Cost-weighted distance modeling.

(A) Example 3 km×3 km landscape with a pixel size of 3 m (from [15]). Two habitat patches (green) are embedded in a matrix of land cover types with differing resistance to movement. Resistances range from 1 (white) to 100 (dark grey); complete barriers with infinite resistance (e.g., linear features representing roads and highways) are shown in black. (B) Cost-weighted distance (CWD) from leftmost patch, with darker shades representing higher cumulative resistance from the patch. (C) CWD from rightmost patch, with darker shades representing higher cumulative resistance from the patch. (D) Modeled least-cost corridor produced by adding CWD surfaces shown in panels B and C (best 20% of study area shown). The least-costly path (traced in green) has a cumulative least-cost distance (LCD) of 124,443 weighted meters.

More »

Figure 1 Expand

Figure 2.

Detail of resistance and CWD surfaces with circular moving window.

For a window with a diameter of 60 m (20 pixels) centered on the barrier, the arrows show the pixels in the window that have the lowest CWD to each patch (values shown are in weighted meters). Because the lowest CWD values from each patch will always be found on the edge of a moving window, only pixels on the perimeter need to be examined, increasing processing efficiency.

More »

Figure 2 Expand

Figure 3.

Barrier analysis of landscape.

(A) Improvement scores (ΔLCD) for a 60 m search diameter using an enhanced version of Linkage Mapper software ([40]). Only positive values (indicating barriers whose removal would reduce isolation) are shown. To facilitate visualization of the barriers, scores were mapped so that they filled the search window (i.e. the maximum ΔLCD value within the search radius of each pixel is displayed). The greatest improvement potential was detected crossing the highway. Note that a natural corridor is bisected by the highway at the point with the highest improvement potential (see detail in Figure 2). (B) Creating a new gap in the barrier where restoration potential is highest re-routes the modeled least-cost corridor and greatly reduces resistance between the patches (LCD = 78,503 weighted meters compared with an LCD of 124,443 pre-restoration). Best 20% of study area shown. (C) Barrier detection at 60 m search diameter after restoration.

More »

Figure 3 Expand

Figure 4.

Barrier analyses integrating across multiple scales and patch pairs.

(A) Results of barrier analysis with original patch pair at 12 m search diameter, which detects restoration opportunities equal to or less than 12 m across (e.g., local roads). (B) Maximum per-meter improvement value across 10 search window sizes (from 6 m to 60 m, with 6 m steps between search diameters). The map highlights where actions at different scales would have highest impact per meter restored. (C) Maximum per-meter improvement value across same window sizes and 5 patches, showing where greatest improvement could be achieved for any single pair of patches. (D) Sum of improvement scores among 5 patches (green). As in Panels A–C, the maximum per-meter improvement score was calculated for each patch pair at each scale. These were then summed across patch pairs to incorporate cumulative benefit for multiple patch pairs across multiple scales. The area scoring highest (bright yellow) had high improvement scores for multiple patch pairs; we interpret this area as having high ‘barrier centrality,’ i.e. being an important restoration opportunity for keeping the overall network connected. Note that the area occurs at a road intersection; if practical, placing a wildlife crossing structure here would re-route four corridors connecting the two leftmost patches to both the central and upper-right patch.

More »

Figure 4 Expand

Figure 5.

Corridor analysis in a landscape undergoing active conservation planning.

(A) 60 km by 80 km study area in eastern Washington, USA, containing two natural landscape blocks to be connected (green). (B) Resistance map used to model corridors in a recent multi-partner connectivity analysis across the Columbia Plateau Ecoregion [41]; values range from 1 (white) to 1000 (black). Low resistance areas include native grassland and shrub-steppe, whereas high resistance areas include roads, developed areas, and agriculture.

More »

Figure 5 Expand

Figure 6.

Reanalysis of connectivity modeling results using barrier detection algorithm.

(A) Corridor connecting natural landscape blocks, showing least-cost movement routes. Best 20% of study area shown. (B) Barriers detected at diameters from 200 m to 2 km, with original least-cost path shown in green for reference. Mitigating barriers along the least-cost path (i.e., intersecting the green line) would improve the existing corridor without changing its location; mitigating barriers away from the path would re-route the best modeled corridor. (C) Restoring a 1 km2 (500 m×2 km) swath spanning the barrier indicated by the arrow establishes a new least-cost corridor to the North. (D) A barrier analysis incorporating the simulated restoration indicates opportunities to substantially improve the new corridor with additional restorations.

More »

Figure 6 Expand