Skip to main content
Advertisement
Browse Subject Areas
?

Click through the PLOS taxonomy to find articles in your field.

For more information about PLOS Subject Areas, click here.

< Back to Article

On the possible use of hydraulic force to assist with building the step pyramid of saqqara

Fig 15

Summary of the study.

North Saqqara map showing the relation between the Abusir water course and the Step Pyramid construction process (Inset). The arrows figuring the flow directions are approximate and given for illustrative purposes based on the Franco-Egyptian SFS/IGN survey [52]. Satellite image: Airbus Pléiades, 2021-07-02, reprinted from Airbus D&S SAS library under a CC BY license, with permission from Michael Chemouny, original copyright 2021.

Fig 15

doi: https://doi.org/10.1371/journal.pone.0306690.g015