-
Loading metrics
Optimization on construction machinery considering sequence-dependent setup times and personnel fatigue based on the improved gray wolf and whale algorithm
- Dawei Wang,
- Bo Gao,
- Lei Zhang
x
- Published: May 21, 2025
- https://doi.org/10.1371/journal.pone.0320753