-
Loading metrics
Prediction of cost and schedule performance in post-hurricane reconstruction of transportation infrastructure
- Elnaz Safapour,
- Sharareh Kermanshachi,
- Behzad Rouhanizadeh
x
- Published: March 29, 2023
- https://doi.org/10.1371/journal.pone.0282231