Optimal allocation of distributed energy storage systems to enhance voltage stability and minimize total cost

  • Ramy Mohamed Hany ,

    Roles Data curation, Formal analysis, Investigation, Methodology, Resources, Visualization, Writing – original draft

    r.hany@sha.edu.eg

    Affiliation Department of Electrical Power and Machines Engineering, The Higher Institute of Engineering, Elshorouk City, Egypt

  • Tarek Mahmoud,

    Roles Conceptualization, Data curation, Resources, Supervision, Writing – review & editing

    Affiliation Department of Electrical Engineering, Al- Azhar University, Cairo, Egypt

  • El Said Abd El Aziz Osman,

    Roles Conceptualization, Investigation, Supervision, Visualization, Writing – review & editing

    Affiliation Department of Electrical Engineering, Al- Azhar University, Cairo, Egypt

  • Abo El Fotouh Abd El Rehim,

    Roles Investigation, Supervision

    Affiliation Department of Electrical Power and Machines Engineering, The Higher Institute of Engineering, Elshorouk City, Egypt

  • Hatem M. Seoudy

    Roles Conceptualization, Formal analysis, Methodology, Software, Writing – review & editing

    Affiliation Department of Electrical Power and Machines Engineering, The Higher Institute of Engineering, Elshorouk City, Egypt

Abstract

The enhancement of energy efficiency in a distribution network can be attained through the adding of energy storage systems (ESSs). The strategic placement and appropriate sizing of these systems have the potential to significantly enhance the overall performance of the network. An appropriately dimensioned and strategically located energy storage system has the potential to effectively address peak energy demand, optimize the addition of renewable and distributed energy sources, assist in managing the power quality and reduce the expenses associated with expanding distribution networks. This study proposes an efficient approach utilizing the Dandelion Optimizer (DO) to find the optimal placement and sizing of ESSs in a distribution network. The goal is to reduce the overall annual cost of the system, which includes expenses related to power losses, voltage deviation, and peak load damand. The methods outlined in this study is implemented on the IEEE 33 bus distribution system. The outcomes obtained from the proposed DO are contrasted with those of the original system so as to illustrate the impact of ESSs location on both the overall cost and voltage profile. Furthermore, a comparison is made between the outcomes of the Ant Lion Optimizer (ALO) and the intended Design of Experiment DO, revealing that the DO has obtained greater savings in comparison to the ALO. The recommended methodology’s simplicity and efficacy in resolving the researched optimization issue make the acquired locations and sizes of ESSs favorable for implementation within the system.

1. Introduction

Significant changes are being forced upon the present distribution networks by a number of related factors, including demand management, integration of renewable energy, power quality standards, targets for reducing greenhouse gas emissions, network growth, and reliability [112]. According to the U.S. Electric Power Research Institute (EPRI), outages caused by problems with the distribution system are expected to cost approximately 100 billion USD annually [13]. The issues caused by power oscillations, disruptions to the distribution and transmission networks as well as sudden changes in load are anticipated to be successfully resolved by ESSs [1416]. ESSs are being inserted in distribution networks to achieve Improvements in power quality, network expansion, cost savings, operating reserves, and a decrease in greenhouse gas emissions.

Additional benefits of ESSs include peak shaving, load shifting, load levelling, and voltage deviation mitigation [1724]. Even while producing electricity from renewable energy is more ecologically beneficial, a strong reliance on it might impair the reliability of power distribution networks. With the help of energy-storage systems (ESSs), this issue with the integration of renewable energy sources may be resolved by reducing output variations, coordinating supply and demand, and balancing network power flow. Consequently, there is great potential for ESS implementation from the utility and consumer perspectives. In distribution networks, incorrect ESS location or sizing can have an impact on load management, frequency and voltage regulation, power quality, and reliability [2537].

In a previous study [38], a multi-objective optimization problem was introduced, which integrates economic and technological objectives, with the aim of identifying the most optimal ESSs for distribution networks. The authors have presented a multi-objective function that incorporates network losses, bus voltage and energy cost in their work [39, 40]. The utilization of a particle swarm optimization (PSO) algorithm has been documented in previous studies [41, 42]. Previous research have shown the application of a genetic algorithm (GA) [43, 44]. The goal function, which incorporates the whole annual cost, was optimized using a Grey Wolf Optimizer (GWO) in the study done by [45]. The cost in question encompasses three components: the cost of energy not supplied, the cost of investing in ESSs, and the cost of operating the ESSs.

The suggested Dandelion Optimizer (DO)-based approach for optimal ESS location and scaling in the distribution network is demonstrated in this research. DO was chosen because to the necessity for easy implementation, quick reaction, and fewer controlling factors. A restricted objective function of the yearly cost (minimum) that incorporates the power loss cost, voltage variation cost, and peak demand cost has been constructed. The proposed approach is applied to the 33-bus system. A comparison is made between the findings acquired with the DO and those obtained with the ALO [46]. The proposed technique results in a lower total cost.

2. Ess modelling in distribution networks

In order to make up for the energy deficit that occurs when the electric networks operate outside of normal parameters, ESSs are technological devices designed to store electrical energy. As previously stated, the increased focus on ESSs may be attributed to their role in enhancing network dependability, augmenting network load capacity, and mitigating the intermittency of renewable energy sources. Fig 1(A) shows a standard bus connected to AC grid with Vt as terminal voltage and δ as angle supplies a load defined with active and reactive power PL and QL, while Fig 1(B) shows the standard bus with the use of an inverter is employed to establish a connection between the ESSs and the bus. This is achieved by converting the DC output voltage of the battery into AC voltage.

thumbnail
Fig 1.

Depicts a distribution network segment (a) without and (b) with ESS.

https://doi.org/10.1371/journal.pone.0296988.g001

The transmission of both reactive and active power between the inverter terminal and the bus may be managed by regulating the AC voltage that the inverter derives. Consequently, the bus voltage and inverter terminal voltage magnitudes and angles determine how much active and reactive energy an ESS may create or consume. Considering the analysis presented above, it is possible to conceptualize ESSs as either generators or regulated loads due to their ability to store energy during the charging process and subsequently release it during discharge. The load level has an impact on the charging/discharging process. The state of ESSs is contingent upon the daily energy consumption. Consequently, during periods of insufficient energy supply, particularly when the demand is at its peak, ESSs operate as generators, redistributing the load among themselves. On the other hand, ESSs are presently in the process of being charged to store energy for excess power, particularly during periods of low demand. In the realm of load management, it is observed that ESSs are efficiently disengaged from the power grid when the load levels are within the specified range including the maximum and minimum load levels.

Based on the typical ESS performance provided in [42], Fig 2 shows the lowest and maximum load levels, which were chosen to be 50% and 75%, respectively. The hypothesis states that the network’s producing units can only supply 75% of the reference load, or the total installed load for a given day. Positive active power is detected during the discharging phase and negative active power is noticed during the charging phase of the (ESS), which is represented in the system as a PQ bus. Reactive power may show a positive or negative number in each of the provided scenarios.

thumbnail
Fig 2. Typical ESS performance dependent on load level based on [42].

https://doi.org/10.1371/journal.pone.0296988.g002

The charging and discharging rates of ESSs are calculated as [47]: (1) (2) (3)

Where EB is the battery energy, ΔEB is the change in the battery energy. it is assumed that the charging efficiency (ηch) and the discharging efficiency (ηdisch) are the same. The charging power Pch(t) is usually positive while the discharging power Pdisch(t) is usually negative. Δt represents the sampling time interval. In this research the ESSs efficiency is assumed to be 85%.

The optimal energy storage system size is shown as: (4) where DoDmax is the maximum depth of discharge assumed to be 80%, while EBmax and EBmin are the maximum value and the minimum value of energy respectively.

3. Main concepts of dandelion optimizer (do)

The dandelion optimizer (DO), a strategy inspired by natural processes, was introduced by Shijie Zhao in 2022 [48]. The dandelion, classified as a perennial herb in the Asteraceae family, is scientifically referred to as Herba taraxaci (see to Fig 3). The plants in question have a height that exceeds 20 centimeters at their greatest growth stage. The structures of dandelion heads have a resemblance to inflorescences. The seeds often comprise an achene, a beak, and many crested hairs. The dispersal of seeds by wind facilitates the establishment of new organisms upon reaching their complete developmental stage.

thumbnail
Fig 3.

Dandelions in nature (a) growing (b) floating in the wind.

https://doi.org/10.1371/journal.pone.0296988.g003

The three phases that dandelion seeds go through are listed below:

  1. A vortex forms above the dandelion seed during the rising stage, and it rises while being propelled higher by wind and sunlight. There are no eddies above the seeds on a rainy day. In this instance, local searches are the only options.
  2. After reaching a particular height, seeds begin to gradually drop during the descending stage.
  3. Dandelions ultimately descend to the earth at random during the landing stage, where they will sprout into new plants in response to the weather and wind.

Dandelions employ a series of stages to facilitate the evolution of their population, mostly through the dispersal of their seeds to subsequent generations.

Step 1: Initialization

In the DO algorithm, each dandelion seed represents a potential solution. A DO’s population based on the dimension (dim) of the problem to be solved and the number of the generated population considering the population size and the variable’s dimension. Each potential solution between the upper bound (UB) and lower bound (LB) of the given issue is generated at random, considering dim of the problem [48].

According to the DO algorithm, the first elite member is defined as the person with the greatest fitness value, representing the optimal setting for the growth of a dandelion seed.

Step 2: Rising step

In order for seeds to float away from their parent plants during the rising stage, they must reach a certain height. Depending on factors like wind speed, air humidity, etc., dandelion seeds can grow to different heights. In this case, there are two meteorological conditions, which are as follows.

Case1:

Wind speeds may be assumed as having a lognormal distribution on a clear day. A dandelion seed’s height is influenced by the speed of the wind. The dandelion flies higher and its seeds disperse further when the wind is stronger. (5) where Xs displays the randomly chosen position at iteration t upon upper and lower boundaries UB and LB, Xt displays the location of the dandelion seed at iteration t and Ѳ is a random number varies in the range of [-π, π]. The expression for the position that was created at random is shown as: (6)

lnY shows a lognormal distribution subject to mean value μ = 0 and variance σ2 = 1. (7) where y shows the standard normal distribution (0, 1).

(8)

The coefficients of the dandelion’s lift component are shown by vx and vy, whereas α represents a random perturbation between [0, 1].

Case2:

Humidity and resistance of air make dandelions difficult to pull appropriately in the breeze on a wet day.

(9)

The domain (q) can be obtained as: (10)

Finally, the mathematical formula for the ascending stage of the dandelion seed is: (11)

The normal distribution is followed by the random number produced by the function randn ().

Step 3: Descending step

Dandelion seeds growth to a certain height during this stage, after which they begin to slowly drop (exploration phase). In DO, Brownian motion is used to mimic the trajectory of a moving dandelion. (12) where βt is the Brownian motion, pop is the population size.

Step 4: Landing step

In this final phase, the Dandelion algorithm centers on exploitation. Established on the outcomes of the previous two steps, the dandelion seed chooses a random spot for its landing. The more iterations there are, the closer the algorithm should go to the ideal outcome.

Finally, population evolution yields the following globally ideal response: (13) where Xelite represents the seed’s optimal position. S has a fixed constant of 0.01 whereas b is a random number with values ranging from 0 to 2, t and w are arbitrary numbers between [0, 1]. S is mathematically represented as: (14)

The value of β is 1.5, and δ can be found as: (15)

Fig 4 provides the dandelion optimizer algorithm’s flow chart.

4. The proposed optimization problem

4. 1. Objective function

With today’s remarkable technological advancements, the power systems must be operated optimally. Energy storage devices are becoming increasingly important as the use of renewable sources of energy in power grids grows.

The size and location of ESSs are the variables needed to be optimal in a multi-objective optimization problem consisting of many cost objectives [49]. The objective of this optimization issue is to minimize the total cost of the system comprising Power Losses Cost (PLC), Voltage Variation Cost (VVC), and Peak Demand Cost (PDC) [50].

(16)

Where Nl is the maximum number of power lines that can be connected in the distribution system, GK is the transmission line k conductance value. The sending end and the receiving end line voltages are represented as Vi and Vj, the voltage angles of the lines can be expressed as δi and δj. Pmax is the peak value of the actual power applied to the reference bus for a specific period.

The costs associated with line losses, voltage deviation and peak demand are represented by the variables Closs, CDev and Cpeak respectively. The cost rates are assumed to be Closs = 284 $/MWh, CDev = 142 $/MWh and [47].

4.2. The proposed constraints

The optimization method takes into account only the location (buses) of the energy storage units and their capacity as optimization variables. The constraints outlined in this problem can be categorized into four distinct groups: load flow restrictions, bus voltage restrictions, transmission line restrictions, and (ESS) restrictions.

The following subsections provide a comprehensive description of each of these elements.

(17)(18)(19)

4.2.1. Energy storage constraints.

The energy storage limitations outlined in Eqs (17) and (18) are designed to make sure that the charging power does not drop below the smallest energy storage capacity PBmin, and the discharging power does not beyond the energy storage system’s maximum power capacity PBmax. The range of values for the minimum and maximum capacities should correspond to the energy storage capacity, as indicated in Eq (19).

(20)

4.2.2. Bus voltage constraints.

Each bus voltage over time should be between 95% and 105% of what it is rated for.

(21)

4.2.3. Transmission lines constraints.

The maximum loading for each line Slmax should not be exceeded over time.

(22)(23)

4.2.4. Power constraints.

According to the capacity limitations, the reactive and active powers of each power plant should fluctuate between their permitted maximum and minimum limits.

5. Simulation results and analysis

The effects of the proposed ESS deployment on system voltage profile, system performance, and cost containment are examined in this section. Three different case studies are examined for the performance analysis: Case 1 is the basic scenario (without ESSs), scenario 2 is the placement of ESSs using ALO optimization algorithm, and Case 3 is the placement of ESSs using the proposed DO optimizer. In this simulation, the IEEE 33 bus test system is utilized (S1 Table) [51]. The bus system’s organizational structure includes 33 bus radials, 32 lines, 1 slack bus at 12.66 kV base voltage and 100 MVA base power. 3.71 MW is the total real power, and 2.31 MVAr is the reactive power. An IEEE 33 bus is depicted in a single line diagram in Fig 5.

Fig 6 shows the bus voltage for three cases: first, without installing ESSs; second, after installing the ESSs via ALO optimization algorithm and third, the voltage profile acquired by the implemented (DO) technique. The analysis of Fig 6 reveals that the installation of (ESS) has a positive effect on the voltage profile of the network. Fig 7 illustrates the voltage change in the buses resulting from the three circumstances, whereas Figs 810 depict the individual bus voltages for each respective case.

thumbnail
Fig 6.

IEEE 33 Bus voltage profile a) with no ESSs b) with ALO ESSs optimizer c) with proposed DO ESSs optimizer.

https://doi.org/10.1371/journal.pone.0296988.g006

thumbnail
Fig 7. Dissimilarity of voltage profile for IEEE 33 bus with and without ESSs using ALO and DO.

https://doi.org/10.1371/journal.pone.0296988.g007

thumbnail
Fig 8. Deviation of voltage profile for IEEE 33 bus without ESSs.

https://doi.org/10.1371/journal.pone.0296988.g008

thumbnail
Fig 9. Deviation of voltage profile for IEEE 33 bus with ESSs using ALO algorithm.

https://doi.org/10.1371/journal.pone.0296988.g009

thumbnail
Fig 10. Deviation of voltage profile for IEEE 33 bus with ESSs using DO algorithm.

https://doi.org/10.1371/journal.pone.0296988.g010

The effectiveness of the suggested methodology is assessed by comparing the system outcomes with those obtained from an alternative strategy, such as the ALO method. Table 1 displays a comprehensive examination of the results acquired from the original system and the later integration of ESSs employing ALO and the suggested methodology for assessing power loss, minimum voltage, and operational expenses of the system. The results show that the DO achieves net saving of 1.7% in total cost than ALO with better voltage profile.

thumbnail
Table 1. Optimum size and location of ESSs for IEEE 33 bus system.

https://doi.org/10.1371/journal.pone.0296988.t001

Table 2 illustrates the impact of altering the number of ESS on the 33-bus system’s optimal solution.

thumbnail
Table 2. Size and placement of ESSs optimal for IEEE 33 bus systems.

https://doi.org/10.1371/journal.pone.0296988.t002

6. Conclusion

The installation of ESSs into a distribution network has the potential to dramatically improve the network’s overall energy efficiency. It is possible to increase the overall performance of the network by intelligently sizing and installing these ESSs in the proper areas. This will be possible if you follow the steps outlined in this paper. The capacity of these ESSs to meet peak energy demand, make use of renewable energy sources, ensure power quality, and save costs associated with the installation of distribution networks is contingent on their being adequately sized and strategically positioned. The Dandelion Optimizer (DO) is utilized in the suggested method that is presented in this article in order to realize this objective as its ultimate destination. An IEEE 33 bus distribution system was utilized in the evaluation of the method, and the findings demonstrated that its performance was superior to that of the initial system achieving lower cost, better voltage profile and even superior to that of the Ant Lion Optimizer (ALO). Because of how easy it is to implement this technique and how well it handles the difficulties involved with optimization, the selected ESS sites and sizes have the potential to be used in the real deployment of the distribution networks.

Supporting information

S1 Table. IEEE 33 bus distribution test system bus data [51].

https://doi.org/10.1371/journal.pone.0296988.s001

(DOCX)

References

  1. 1. Bouffard F. and D. Kirschen S. J. E. p., "Centralised and distributed electricity systems," vol. 36, no. 12, pp. 4504–4508, 2008.
  2. 2. Pool R. J. P. E., "Distributed generation: embrace the change," vol. 18, no. 2, pp. 12–13, 2004.
  3. 3. Strbac G. J. E. p., "Demand side management: Benefits and challenges," vol. 36, no. 12, pp. 4419–4426, 2008.
  4. 4. Taylor L. and Short T. A., Distribution reliability and power quality. Crc Press, 2018.
  5. 5. Schienbein L. A. and DeSteese J. G., "Distributed energy resources, power quality and reliability-Background," Pacific Northwest National Lab.(PNNL), Richland, WA (United States)2002.
  6. 6. Kumar K. and Jaipal B. J. E. G. M., "The role of energy storage with renewable electricity generation," 2022.
  7. 7. T. J. J. I. J. o. E. P. Hammons and E. Systems, "Integrating renewable energy sources into European grids," vol. 30, no. 8, pp. 462–475, 2008.
  8. 8. Carrasco J. M. et al., "Power-electronic systems for the grid integration of renewable energy sources: A survey," Industrial Electronics, IEEE Transactions on, vol. 53, no. 4, pp. 1002–1016, 2006.
  9. 9. Sedghi M., Aliakbar-Golkar M., Haghifam M.-R. J. I. J. o. E. P, and E. Systems, "Distribution network expansion considering distributed generation and storage units using modified PSO algorithm," vol. 52, pp. 221–230, 2013.
  10. 10. Carrano E. G., Guimarães F. G., Takahashi R. H., Neto O. M., and Campelo F. J. I. T. o. P. S., "Electric distribution network expansion under load-evolution uncertainty using an immune system inspired algorithm," vol. 22, no. 2, pp. 851–861, 2007.
  11. 11. Zubo R. H. et al., "Operation and planning of distribution networks with integration of renewable distributed generators considering uncertainties: A review," vol. 72, pp. 1177–1198, 2017.
  12. 12. Das C. K., Bass O., Kothapalli G., Mahmoud T. S., Habibi D. J. R., and Reviews S. E., "Overview of energy storage systems in distribution networks: Placement, sizing, operation, and power quality," vol. 91, pp. 1205–1230, 2018.
  13. 13. Amin S. M. and Gellings C. W. J. E., "The North American power delivery system: balancing market restructuring and environmental economics with infrastructure security," vol. 31, no. 6–7, pp. 967–999, 2006.
  14. 14. Srivastava A. K., Kumar A. A., and Schulz N. N. J. I. S. J., "Impact of distributed generations with energy storage devices on the electric grid," vol. 6, no. 1, pp. 110–117, 2012.
  15. 15. Bolund B., Bernhoff H., Leijon M. J. R., and Reviews S. E., "Flywheel energy and power storage systems," vol. 11, no. 2, pp. 235–258, 2007.
  16. 16. Wade N. S., Taylor P., Lang P., and Jones P. J. E. p., "Evaluating the benefits of an electrical energy storage system in a future smart grid," vol. 38, no. 11, pp. 7180–7188, 2010.
  17. 17. Ghiassi-Farrokhfal Y., Rosenberg C., Keshav S., and Adjaho M.-B. J. I. J. o. S. A. i. C., "Joint optimal design and operation of hybrid energy storage systems," vol. 34, no. 3, pp. 639–650, 2016.
  18. 18. Koohi-Kamali S., Tyagi V., Rahim N., Panwar N., Mokhlis H. J. R., and Reviews S. E., "Emergence of energy storage technologies as the solution for reliable operation of smart power systems: A review," vol. 25, pp. 135–165, 2013.
  19. 19. Mahlia T., Saktisahdan T., Jannifar A., Hasan M., Matseelar H. J. R., and s. e. reviews, "A review of available methods and development on energy storage; technology update," vol. 33, pp. 532–545, 2014.
  20. 20. Kousksou T., Bruel P., Jamil A., El Rhafiki T., Zeraouli Y. J. S. E. M., and Cells S., "Energy storage: Applications and challenges," vol. 120, pp. 59–80, 2014.
  21. 21. Farhadi M. and O. J. I. T. o. I. Mohammed A., "Energy storage technologies for high-power applications," vol. 52, no. 3, pp. 1953–1961, 2015.
  22. 22. Lai C. S. et al., "A comprehensive review on large-scale photovoltaic system with applications of electrical energy storage," vol. 78, pp. 439–451, 2017.
  23. 23. Zame K. K., Brehm C. A., Nitica A. T., Richard C. L., Schweitzer III G. D. J. R., and Reviews S. E., "Smart grid and energy storage: Policy recommendations," vol. 82, pp. 1646–1654, 2018.
  24. 24. Chauhan A., Saini R. J. R., and Reviews S. E., "A review on Integrated Renewable Energy System based power generation for stand-alone applications: Configurations, storage options, sizing methodologies and control," vol. 38, pp. 99–120, 2014.
  25. 25. Evans A., Strezov V., Evans T. J. J. R., and s. e. reviews, "Assessment of utility energy storage options for increased renewable energy penetration," vol. 16, no. 6, pp. 4141–4147, 2012.
  26. 26. Li H., Li F., Xu Y., Rizy D. T., and J. D. J. I. T. o. P. Kueck S., "Adaptive voltage control with distributed energy resources: Algorithm, theoretical analysis, simulation, and field test verification," vol. 25, no. 3, pp. 1638–1647, 2010.
  27. 27. Poonpun P. and W. T. J. I. T. o. e. c. Jewell , "Analysis of the cost per kilowatt hour to store electricity," vol. 23, no. 2, pp. 529–534, 2008.
  28. 28. Hasan N. S., Hassan M. Y., Majid M. S., Rahman H. A. J. R., and Reviews S. E., "Review of storage schemes for wind energy systems," vol. 21, pp. 237–247, 2013.
  29. 29. Toledo O. M., Oliveira Filho D., Diniz A. S. A. C. J. R., and Reviews S. E., "Distributed photovoltaic generation and energy storage systems: A review," vol. 14, no. 1, pp. 506–511, 2010.
  30. 30. Barton J. P. and D. G. J. I. t. o. e. c. Infield, "Energy storage and its use with intermittent renewable energy," vol. 19, no. 2, pp. 441–448, 2004.
  31. 31. Ho W. S. et al., "Optimal scheduling of energy storage for renewable energy distributed energy generation system," vol. 58, pp. 1100–1107, 2016.
  32. 32. Díaz-González F., Sumper A., Gomis-Bellmunt O., Villafáfila-Robles R. J. R., and reviews s. e., "A review of energy storage technologies for wind power applications," vol. 16, no. 4, pp. 2154–2171, 2012.
  33. 33. Beaudin M., Zareipour H., Schellenberglabe A., and Rosehart W. J. E. f. s. d, "Energy storage for mitigating the variability of renewable electricity sources: An updated review," vol. 14, no. 4, pp. 302–314, 2010.
  34. 34. Dell R. M. and D. Rand A. J. J. J. o. p. s, "Energy storage—a key technology for global energy sustainability," vol. 100, no. 1–2, pp. 2–17, 2001.
  35. 35. Suberu M. Y., Mustafa M. W., Bashir N. J. R., and Reviews S. E., "Energy storage systems for renewable energy power sector integration and mitigation of intermittency," vol. 35, pp. 499–514, 2014.
  36. 36. Castillo A., Gayme D. F. J. E. C., and Management, "Grid-scale energy storage applications in renewable energy integration: A survey," vol. 87, pp. 885–894, 2014.
  37. 37. Foley A. et al., "Electrical energy storage & smart grid technologies to integrate the next generation of renewable power systems," in Proceedings of the SEEP2010, 2010.
  38. 38. Nick M., Cherkaoui R., and Paolone M. J. I. T. o. P. S, "Optimal allocation of dispersed energy storage systems in active distribution networks for energy balance and grid support," vol. 29, no. 5, pp. 2300–2310, 2014.
  39. 39. Nick M., Cherkaoui R., Paolone M. J. I. J. o. E. P., and E. Systems, "Optimal siting and sizing of distributed energy storage systems via alternating direction method of multipliers," vol. 72, pp. 33–39, 2015.
  40. 40. M. Nick, M. Hohmann, R. Cherkaoui, and M. Paolone, "Optimal location and sizing of distributed storage systems in active distribution networks," in 2013 IEEE grenoble conference, 2013, pp. 1–6: IEEE.
  41. 41. S. Joseph et al., "PSO based controller algorithm for optimal allocation & setting of fuel cell in a wind—PV integrated power system for maximizing loadability," in 2014 International Conference on Advances in Green Energy (ICAGE), 2014, pp. 1–6: IEEE.
  42. 42. Saboori H., Hemmati R., and Jirdehi M. A. J. E., "Reliability improvement in radial electrical distribution network by optimal planning of energy storage systems," vol. 93, pp. 2299–2312, 2015.
  43. 43. Awad A. S., El-Fouly T. H., and Salama M. M. J. I. T. o. P. s., "Optimal ESS allocation for load management application," vol. 30, no. 1, pp. 327–336, 2014.
  44. 44. Grisales-Noreña L., Montoya O. D., and Gil-Gonzalez W. J. J. o. E. S., "Integration of energy storage systems in AC distribution networks: Optimal location, selecting, and operation approach based on genetic algorithms," vol. 25, p. 100891, 2019.
  45. 45. Fathy A., Abdelaziz A. Y. J. E. P. C., and Systems, "Grey wolf optimizer for optimal sizing and siting of energy storage system in electric distribution network," vol. 45, no. 6, pp. 601–614, 2017.
  46. 46. Mirjalili S., "The Ant Lion Optimizer," Advances in Engineering Software, vol. 83, no. 0, pp. 80–98, 5// 2015.
  47. 47. Boonluk P., Siritaratiwat A., Fuangfoo P., and Khunkitti S. J. B., "Optimal siting and sizing of battery energy storage systems for distribution network of distribution system operators," vol. 6, no. 4, p. 56, 2020.
  48. 48. Zhao S., Zhang T., Ma S., and Chen M. J. E. A. o. A. I., "Dandelion Optimizer: A nature-inspired metaheuristic algorithm for engineering applications," vol. 114, p. 105075, 2022.
  49. 49. Ali T., Malik S. A., Daraz A., Aslam S., and Alkhalifah T. J. E., "Dandelion optimizer-based combined automatic voltage regulation and load frequency control in a multi-area, multi-source interconnected power system with nonlinearities," vol. 15, no. 22, p. 8499, 2022.
  50. 50. Fayek H. H., Fayek F. H., and Rusu E. J. A. S., "Pharmacophore-Modeling-Based Optimal Placement and Sizing of Large-Scale Energy Storage Stations in a Power System including Wind Farms," vol. 13, no. 10, p. 6175, 2023.
  51. 51. Wu M.E. Baran and F.F. “Network Reconfiguration in Distribution Systems for Loss Reduction and Load Balancing”,.: IEEE Transactions on Power Delivery vol.4 No.2 pp. 1401–1407,1989.