Figures
Abstract
The economic-statistical design of the synthetic np chart with estimated process parameter is presented in this study. The effect of process parameter estimation on the expected cost of the synthetic np chart is investigated with the imposed statistical constraints. The minimum number of preliminary subgroups is determined where an almost similar expected cost to the known process parameter case is desired for the given cost model parameters. However, the available number of preliminary subgroups in practice is usually limited, especially when the number of preliminary subgroups is large. Consequently, the optimal chart parameters of the synthetic np chart are computed by considering the practical number of preliminary subgroups in which the cost function is minimized. This leads to a lower expected cost compared to that of adopting the optimal chart parameter corresponding to the known process parameter case.
Citation: Lee MH, Khoo MBC, Chew X, Then PHH (2020) Economic-statistical design of synthetic np chart with estimated process parameter. PLoS ONE 15(4): e0230994. https://doi.org/10.1371/journal.pone.0230994
Editor: Fabio Rapallo, Universita degli Studi di Genova, ITALY
Received: January 15, 2020; Accepted: March 10, 2020; Published: April 8, 2020
Copyright: © 2020 Lee et al. This is an open access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.
Data Availability: All relevant data are within the paper and its Supporting Information files.
Funding: The authors would like to acknowledge the Sarawak Multimedia Authority (SMA) in financing this research through Sarawak Digital Economy Research Grant. The funders had no role in study design, data collection and analysis, decision to publish, or preparation of the manuscript.
Competing interests: The authors have declared that no competing interests exist.
Introduction
Control charts are generally implemented in two phases, i.e. Phase-I and Phase-II. The process parameter is estimated from an in-control reference sample in Phase-I since the process parameter is rarely known in practice. Then this estimate is used to construct the control limit for process monitoring in Phase-II. When the chart statistic plotted in Phase-II falls outside the control limit, an out-of-control signal will be triggered. In the literature, the performance of control charts with estimated process parameter has been shown to be significantly different compared to that of the known process parameter case. Therefore, considerable attention was devoted to investigate the performance of control charts when the process parameters are estimated from an in-control Phase-I dataset. For example, see [1–10].
The economic-statistical model of the synthetic np chart is yet to be explored by researchers in the case of process parameter estimation. Therefore, this study focuses on investigating the effect of process parameter estimation on the expected cost of the economic-statistical model of the upper-sided synthetic np chart for detecting increases in the process fraction non-conforming. The economic performance of the synthetic np chart with estimated process parameter is investigated by adopting the optimal chart parameters corresponding to the known process parameter case. In addition, the minimum number of preliminary subgroups required for the process parameter estimation is also determined such that the cost associated with the estimated process parameter case is almost similar to that of the known process parameter case. An alternative approach is also introduced in this study, where the optimal combination of chart parameters of the synthetic np chart is computed by minimizing the cost function, in which the number of preliminary subgroups is taken into consideration.
Synthetic np chart with estimated process parameter
In this section, we derive the average run length of the upper-sided synthetic np chart with estimated process parameter. The Phase-I dataset comprises samples {Xi,1, Xi,2, Xi,3, …, Xi,n} of size n, for i = 1, 2, 3,…, m, where m is the number of preliminary subgroups. The synthetic np chart consists of two sub-charts: the np sub-chart (with upper control limit UCL) and the conforming run length sub-chart (with lower control limit L), where L is a positive integer. The process parameter is the process fraction non-conforming p = τp0. Note that p = p0 (τ = 1) when the process is in-control, while p = p1 (τ > 1) for detecting increases in the process fraction non-conforming when the process is out-of-control, where τ is the shift size.
The upper control limit of the np sub-chart with estimated process parameter is given as (1) where ⌊⋅⌋ denotes the rounded down integer, k is the coefficient of the UCL and is an estimator of process parameter p0, for x ∈ {0, 1, 2, …, mn– 1, mn}. Let be the probability that a chart statistic (i.e. number Xi of non-conforming units in the sample) is plotted above UCL, then where F(⋅|n,p) is the cumulative distribution function of a binomial random variable with parameters (n, p).
Let be the conditional average run length of the synthetic np chart with estimated process parameter and let f(x|mn,p0) be the probability density function of a binomial random variable with parameters (mn, p0). Then the unconditional average run length of the synthetic np chart with estimated process parameter is calculated as (2) where and . As in [11–13], the same formulae of xmin and xmax are used to compute the ARL for the np type chart with estimated process parameter. Note that the unconditional ARL in Eq (2) is derived as a summation of the product of the conditional ARL (i.e. ) and the in-control probability mass function of the binomial random variable (i.e. f(x|mn,p0)) since this probability is related to Phase-I with the process parameter of p0 [12]. Here, ARL = ARL0 (τ = 1) when the process is in-control, while ARL = ARL1 (τ > 1) when the process is out-of-control. Note that when the process parameter is known, the average run length of the synthetic np chart is (3) where θ = 1−F(UCL|n,p). Here, .
Economic-statistical design of the synthetic np chart
Numerous research works on the economic and economic-statistical designs of control charts were using the cost model developed by Lorenzen and Vance [14]. For example, see [15–22]. The Lorenzen and Vance’s cost model is a general model applicable to various types of control charts regardless of the statistic used and the calculation of the statistical properties requires the ARL criterion. In this study, the cost function in Lorenzen and Vance [14] is used for the economic-statistical design of the synthetic np chart with estimated process parameter and the expected cost per unit time of the cost model is calculated as (4) where C0 is the cost of producing non-conformities when the process is in-control; λ is the process failure rate; C1 is the cost of producing non-conformities when the process is out-of-control; is the expected time of occurrence of an assignable causes; E is the time to sample and chart one item; h is the sampling interval; r1 = 1 if the production continues during the search for an assignable cause, while r1 = 0 if the production stops during the search for an assignable cause; r2 = 1 if the production continues during repair, while r2 = 0 if the production stops during repair; T1 is the expected time to find an assignable cause; T2 is the expected time to repair the process; is the expected number of samples taken when the process is in-control; Y is the cost per false alarm; W is the cost to locate an assignable cause and repair the process; a is the fixed cost per sample; b is the variable cost per unit sampled; and T0 is the expected time spent searching for a false alarm.
The following statistical constraints are imposed to achieve the required statistical performance of the synthetic np chart: (5) where ARLL is the desired lower limit of the in-control statistical constraint and ARLU is the desired upper limit of the out-of-control statistical constraint. The optimal chart parameters (k, L, n, h) of the synthetic np chart are obtained using Evolver (add-in Microsoft Excel solver), in which the expected cost in Eq (4) is minimized with the imposed statistical constraints in Eq (5), subject to k > 0.01, L ≥ 1, n ≥ 1 and 0.01 < h < 8, where L and n are positive integers.
Effect of the process parameter estimation on the expected cost
In this study, the input parameters of the cost function for the economic-statistical design of the synthetic np chart are the cost model parameters as follows: λ ∈ {0.01, 0.02, 0.03}, C0 ∈ {57.12, 114.24, 171.36}, C1 ∈ {474.6, 949.2, 1423.8}, E ∈ {0.04167, 0.08333, 0.125}, T0 ∈ {0.04167, 0.08333, 0.125}, T1 ∈ {0.04167, 0.08333, 0.125}, T2 ∈ {0.375, 0.75, 1.125}, Y ∈ {488.7, 977.4, 1466.1}, W ∈ {488.7, 977.4, 1466.1}, a ∈ {0, 5, 10} and b ∈ {2.11, 4.22, 6.33}. It is assumed that r1 = 1 (i.e. the production continues during the search for an assignable cause) and r2 = 0 (i.e. the production stops during repair) with p0 = 0.02 and τ ∈ {1.4, 1.6, 1.8, 2, 2.2, 2.4, 2.6}, where ARLL = 200 and ARLU = 5. Table 1 lists the values of these parameters for 29 cases with the bolded value in each row indicating the parameter that is varied for each case. Table 2 lists the optimal chart parameters of the synthetic np chart with the corresponding values of ARL0, ARL1 and expected cost under the assumption of the known process parameter. The optimal chart parameters in Table 2 are used to compute the expected cost of the synthetic np chart with different values of m ∈ {10, 20, 50, 100} for the estimated process parameter case and m = ∞ for the known process parameter case, where these expected costs are provided in Table 3. In comparison to the expected cost of the synthetic np chart with known process parameter, the difference in the expected cost (difference in cost in Table 3) of the synthetic np chart with estimated process parameter computed using the optimal chart parameters of the known process parameter case is calculated as costm−cost∞, where costm is the expected cost of the estimated process parameter case and cost∞ is the expected cost of the known process parameter case. Note that a positive value indicates that the expected cost of the estimated process parameter case is higher than that of the known process parameter case, while a negative value indicates that the expected cost of the estimated process parameter case is lower than that of the known process parameter case.
In Table 3, it is noticeable that the expected cost of the synthetic np charts with estimated process parameter (m = 10, 20, 50, 100) is higher compared to that of the corresponding chart with known process parameter (m = ∞) since the differences in the expected costs are all positive values. For example, the optimal chart parameters in Case 4 are (k, L, n, h) = (2.2560, 9, 82, 3.13) when the process parameter is known and the expected cost is computed as $475.96. By adopting these chart parameters, that are (k, L, n, h) = (2.2560, 9, 82, 3.13), the expected costs per hour are $540.18, $503.49, $487.52 and $478.69 for the estimated process parameter cases with number of subgroups m = 10, 20, 50 and 100, respectively. Therefore, the expected costs have increased by $64.22, $27.53, $11.56 and $2.73 for m = 10, 20, 50 and 100, respectively when the optimal chart parameters corresponding to the known process parameter case are used to compute the expected cost of estimated process parameter case. This shows that the increase in the expected cost is larger when the value of m is smaller, indicating that the expected cost of the estimated process parameter case deviates significantly from that of the known process parameter case, especially when the value of m is small.
Effect of the number of preliminary subgroups on the expected cost
The results in the previous section show that when m decreases, the difference between the expected cost for known and estimated process parameter cases increases. Therefore, it is inappropriate to calculate the expected cost of the estimated process parameter case by adopting the optimal chart parameters associated with the known process parameter case. For this reason, the minimum number of preliminary subgroups in Phase-I (i.e. minimum value of m) is determined in this section, such that the performance of the np chart with estimated process parameter is approximately similar to that of the corresponding chart with known process parameter. Consequently, the minimum value of m is determined in order to obtain a nearly similar expected cost as the known process parameter case, in which the percentage of difference in the expected cost between the known and estimated process parameter cases is less than 0.01%, where the formulation is given as follows: (6) where costm denotes the expected cost associated with the estimated process parameter case and cost∞ denotes the expected cost associated with the known process parameter case.
Table 4 provides the minimum value of m of the estimated process parameter based synthetic np chart, matching approximately a similar expected cost value to the corresponding chart with known process parameter, where the chart parameters in Table 2 are considered. In Table 4, it can be seen that the minimum values of m satisfying Eq (6) for all the given cases are larger than 250, except for Cases 5–7 when the shift size is large (τ ≥ 2.2).
Optimal design of the cost model with estimated process parameter
In practice, practitioners are usually interested to use a small number of preliminary subgroups to estimate the process parameter in Phase-I since using a large number of Phase-I samples can be practically infeasible. To address this issue, an alternative approach is proposed in this study, where a model for the economic-statistical design is developed by computing the optimal chart parameters which take the number of preliminary subgroups into account when designing the synthetic np chart with estimated process parameter. For this alternative approach, the optimal chart parameters of the synthetic np chart with estimated process parameter are computed by minimizing the expected cost. The optimization procedure of the economic-statistical design of the synthetic np chart with estimated process parameter is illustrated as follows:
- Step 1. Specify the values of m and τ.
- Step 2. Determine the values of the cost model parameters, which are C0, C1, E, T0, T1, T2, Y, W, a, b, r1 and r2.
- Step 3. Determine the statistical constraints in Eq (5).
- Step 4. Calculate UCL using Eq (1).
- Step 5. Calculate ARL0 (when τ = 1) and ARL1 (when τ > 1) using Eq (2).
- Step 6. Minimize the cost function in Eq (4) to obtain the lowest expected cost.
- Step 7. The chart parameters (k, L, n, h) associated with the lowest expected cost are the optimal chart parameters for the synthetic np chart with estimated process parameter. These optimal chart parameters can be used to compute the control limit of the synthetic np chart for Phase-II process monitoring.
By employing the aforementioned procedure, Table 5 summarizes the expected cost of the synthetic np chart for m = 10, 20, 50 and 100 associated with the optimal chart parameters of the estimated process parameter case, instead of adopting the optimal chart parameters corresponding to the known process parameter case. In Table 5, it can be seen that with the implementation of the new design model, the synthetic np chart has a lower expected cost compared with adopting the chart parameters corresponding to the known process parameter case. For example, by referring to Case 8, the expected cost computed using the optimal chart parameters associated with the known process parameter case are $422.93, $391.70, $378.49 and $371.30 for m = 10, 20, 50 and 100, respectively (see Table 3); while the expected cost obtained by adopting the optimal chart parameter corresponding to the estimated process parameter case are $313.24, $338.40, $346.94 and $346.68 for m = 10, 20, 50 and 100, respectively (see Table 5). Therefore, the optimal chart parameters computed based on the new design model allow a reduction in the expected cost compared with using the chart parameters corresponding to the known process parameter case.
Conclusions
In this study, a model for the economic-statistical design of the synthetic np chart with estimated process parameter is presented. The results show that the expected cost is affected by the parameter estimation, where the expected cost of the synthetic np chart with estimated process parameter is significantly different compared with the corresponding known process parameter chart, especially when the number of preliminary subgroups (i.e. value of m) is small. The expected cost for the estimated process parameter case (m < ∞) is higher than the expected cost corresponding to the case of known process parameter case (m = ∞). It can also be noticed that the expected cost decreases with a larger value of m.
This study suggests the minimum number of preliminary subgroups for the synthetic np chart with estimated process parameter to have an almost similar expected cost to the known process parameter case. The results show that the minimum number of preliminary subgroups is large (i.e. more than 250) in most cases. This shows that a larger number of preliminary subgroups is required in order to have the expected cost that is almost similar to that of the np chart with known process parameter. An alternative approach in designing the synthetic np chart with estimated process parameter is also introduced by computing the optimal chart parameters, subject to the imposed statistical constraints so that the expected cost is minimized.
References
- 1. Hu XL, Castagliola P, Tang AA. Conditional design of the CUSUM median chart for the process position when process parameters are unknown. J Stat Comput Simul. 2019;89(13):2468–2488.
- 2. Khoo MBC, Saha S, Lee HC, Castagliola P. Variable sampling interval exponentially weighted moving average median chart with estimated process parameters. Qual Reliab Eng Int. 2019;35(8):2732–2748.
- 3. Kumar N, Baranwal A, Charkraborti S. Shewhart-type Phase II control charts for monitoring times to an event with a guaranteed in-control and good out-of-control performance. Qual Reliab Eng Int. Forthcoming 2019.
- 4. Lee MH, Khoo MBC. Double sampling np chart with estimated process parameter. Commun Stat Simul Comput. Forthcoming 2019.
- 5. Mosquera J, Aparisi F, Epprecht EK. Design of an control chart with guaranteed joint in-control and out-of-control performances when the mean and variance are estimated. Qual Reliab Eng Int. 2019;35(7):2097–2114.
- 6. Qiao Y, Hu X, Sun J, Xu Q. Optimal design of one-sided exponential EWMA charts with estimated parameters based on the median run length. IEEE Access. 2019;7:76645–76658.
- 7. Saghir A, Abbasi SA, Faraz A. The exact method for designing the Maxwell chart with estimated parameter. Commun Stat Simul Comput. Forthcoming 2019.
- 8. Teoh WL, Ong LV, Khoo MBC, Castagliola P, Chong ZL. The variable sampling interval EWMA chart with estimated process parameters. J Test Eval. Forthcoming 2019.
- 9. Yazdi AA, Hamadani AZ, Gavareshki MHK, Amiri A. Phase II monitoring of multivariate profiles with estimated parameters and optimal phase I subgroups. Commun Stat Simul Comput. Forthcoming 2019.
- 10. Zhang M, Hou X, Chen H, He S. CCC-r charts’ performance with estimated parameter for high-quality process. Qual Reliab Eng Int. 2019;35(4):946–958.
- 11. Castagliola P, Wu S, Khoo MBC, Chakraborti S. Synthetic phase II Shewhart-type attributes control charts when process parameters are estimated. Qual Reliab Eng Int. 2014;30(3):315–335.
- 12. Hashemian SM, Noorossana R, Keyvandarian A, Shekary AM. Performance of adaptive np-chart with estimated parameter. Int J Qual Reliab Manag. 2016;33(6):769–791.
- 13. Wu S, Castagliola P, Khoo MBC. Run rules based phase II c and np charts when process parameters are unknown. Commun Stat Theory Methods. 2016;45(4):1182–1197.
- 14. Lorenzen TJ, Vance LC. The economic design of control charts: A unified approach. Technometrics 1986;28(1):3–10.
- 15. Abolmohammadi M, Seif A, Behzadi MH, Moghadam MB. Effect of Linex loss function on the VSI control chart. J Stat Comput Simul. 2019;89(9):1674–1693.
- 16. Lee MH, Khoo MBC. The economic and economic statistical designs of synthetic double sampling chart. Commun Stat Simul Comput. 2019;48(8):2313–2332.
- 17. Ng PS, Khoo MBC, Saha S, Yeong WC. Economic and economic-statistical designs of auxiliary information based , X, synthetic and EWMA charts. Commun Stat Simul Comput. Forthcoming 2019.
- 18. Safe H, Kazemzadeh RB, Kanani YG. A Markov chain approach for double-objective economic statistical design of the variable sampling interval control chart. Commun Stat Theory Methods. 2018;47(2):277–288.
- 19. Salmasnia A, Rahimi A, Abdzadeh B. An integration of NSGA-II and DEA for economic-statistical design of T2-Hotelling control chart with double warning lines. Neural Comput & Applic. 2019;31(2):1173–1194.
- 20. Saniga EM, Davis D, McWilliams T, Lucas J. Statistical CUSUM designs with minimum sampling cost. Qual Technol Quant Manag. 2018;15(4):475–483.
- 21. Seif A. A new Markov chain approach for the economic statistical design of the VSS T2 control chart. Commun Stat Simul Comput. 2019;48(1):200–218.
- 22. Wan Q, Zhu M. Detecting a shift in variance using economically designed VSI control chart with combined attribute-variable inspection. Commun Stat Simul Comput.