Fig 1.

Monopole ground return mode of HVDC projects.

More »

Fig 1 Expand

Fig 2.

The resistive network above the ground and the electric field under the ground.

More »

Fig 2 Expand

Fig 3.

The DC currents calculation algorithm.

More »

Fig 3 Expand

Fig 4.

The earth resistive network mesh.

More »

Fig 4 Expand

Fig 5.

Partial structure of the earth resistive network.

More »

Fig 5 Expand

Fig 6.

The comparison of ground surface potentials for double ring ground electrodes and point.

More »

Fig 6 Expand

Fig 7.

Shanghai area earth structure.

More »

Fig 7 Expand

Table 1.

Resistivity of different parts of Shanghai area.

More »

Table 1 Expand

Fig 8.

Shanghai area power grid diagram and the positions of the main 500 kV substations and the converter stations.

More »

Fig 8 Expand

Table 2.

The calculated and measured DC current for 500 kV substation #02 and #10.

More »

Table 2 Expand

Table 3.

Computer configuration and calculation time.

More »

Table 3 Expand

Table 4.

DC currents in main AC substations for various polarity combinations of HVDC lines.

More »

Table 4 Expand

Table 5.

Substation #10 connection combinations.

More »

Table 5 Expand

Table 6.

The DC currents in 500 kV substations under different connection combinations of Substation #10.

More »

Table 6 Expand

Table 7.

The DC currents in part 220 kV substations under different connection combinations of Substation #10.

More »

Table 7 Expand